Skip to main content
GullySystem

Pool records and equipment register for pool companies

The pool record holds the facts about one pool: its volume, surface, depth profile and every piece of equipment fitted to it. Pump, filter, heater, cover and salt cell each carry an install date and a warranty end date. Everyone in the firm opens the same record.

What each pool record and equipment entry keeps

Each pool has one record that follows it from the first survey to its tenth summer. It describes the water and the shell, then lists the equipment fitted. Four groups of fields carry the detail. None of them is optional for a pool on a route.

Volume, surface and depth profile

Fields cover the volume of water, the surface finish such as plaster or tile, and the depth profile from shallow end to deep end. A technician working out a dose reads the volume here. Nobody guesses from memory.

Pump, filter and heater entries

Each unit is entered on the pool’s record with its model, supplier, install date and warranty end date. A replacement pump shows beside the old one. The history of what was fitted stays readable for any later fault.

Cover and salt cell entries

The cover and the salt cell are separate entries with their own install dates and warranty end dates. A cell that scales up early can be checked against its fitting date. Argument about who pays gets shorter.

Warranty end dates and notes

Every warranty end date sits beside a free note, such as the supplier’s contact or a condition on the cover. Office staff see which units fall out of cover this season. Owners hear before a repair is quoted.

Pool records and equipment through a working week

A pool record is opened by people with different jobs, all in the same week. These four moments show how the register is read and how it is kept current. Each one touches a single entry, not a whole file. The pattern repeats all season.

A technician at the pump room

A technician arrives and finds the pump humming louder than before. On a phone, the record opens with the model and install date already there. The finding is noted against that unit. The office sees it the same day.

The office takes a fault call

A customer rings to say the heater will not fire. The person answering opens the pool and reads the heater’s model and warranty end date. Cover is settled on the call. Nobody is sent out blind.

A supervisor hands over a build

On handover day the build supervisor keys in the pump, filter, heater and cover that were actually installed, with their dates. The finished pool then joins a route with a full equipment list. Nothing is retyped.

A dispatcher plans the spring opening

Before the opening weekends the dispatcher scans pools by cover type and equipment. A pool with a safety cover needs a different crew visit from one with a roller cover. That entry tells the dispatcher which.

Who opens the pool record and what each sees

Everyone in the firm reads the same pool record, but each role looks at a different part of it. Nobody scrolls through another job’s fields. The four roles below read it closely.

Owners and warranty dates

The owner reads equipment warranties ending this season across all pools. The same list shows which models keep failing, which helps when the catalogue is revised. The depth profile is of no interest here. Counts of units out of cover are.

For build supervisors

A supervisor writes the equipment entries at handover and corrects them if a unit was swapped on site. The supervisor sees the shell description and install dates for every pool built. Supplier paperwork is attached to the unit.

For service technicians

On a phone at the pool gate, a technician sees volume, surface, depth profile and the equipment list before touching the water. Findings are added against the unit. Warranty dates are read only for technicians, unless the owner decides otherwise.

Dispatchers and cover types

A dispatcher looks at cover type, heater presence and salt cell fitting when building the opening and closing lists. The record matches each visit to the crew and tools it needs. It saves a trip back to the depot.

Decisions to settle before the register goes live

A register is only as good as the entries put into it. A few choices made at the start decide whether the record can be trusted in the third summer. Settle these first.

Who may edit warranty dates

Decide who can edit volume and warranty end dates. A sensible start is editing for the build supervisor and the office, and a notes field for technicians. Claims rest on those dates. Fewer editors mean fewer disputes later.

Equipment too small to list

Decide which items do not get their own entry, such as a skimmer basket or a hose. Equipment with a warranty and an install date earns a line. Cheap parts stay in the stock lists.

How existing pools come across

Customers, equipment notes and open balances arrive from your spreadsheets. Choose which pools are checked first. Imported records are compared with the pump room, and gaps are fixed on site before a route depends on them.

The first report to read for Pool records and equipment register

Pick one report to read before any other. Equipment warranties ending this season is a good candidate. It turns the register into a call list, and it shows at once whether install dates were keyed correctly.

How the register connects to the product

The pool record sits underneath the other features, handing facts to them and taking facts back. A reading, a repair or a quotation always lands against a pool. The equipment list is what lets the office answer a question about cover. Five links are worth knowing.

  • Receives equipment and handover details from construction stages and inspections
  • Supplies pool volume to the weekly routes and water test log
  • Gives repair calls the model and warranty end date
  • Feeds replacement quotes with the unit being replaced
  • Tells opening, closing and service plans which cover is fitted

Where the pool record and register stop

The register records what was fitted and when. It does not diagnose a fault, confirm that a supplier will honour a warranty, or read a pump’s state from a sensor. Warranty terms stay with the supplier and the customer’s contract, and the owner or an adviser settles disputes. A firm with a few pools can keep a notebook until the equipment list outgrows it.

FAQ

Frequently asked questions

Can one pool hold several pumps over the years?

Yes. A replaced pump is added as a new entry with its own install date and warranty end date. The earlier pump stays on the record. A later fault can then be checked against what was fitted before.

Does the register store equipment manuals?

Supplier paperwork and photographs can be attached to a unit’s entry. It is not a manual library. Your own files stay where you keep them, and the entry points the office to the right document.

Can a technician edit a warranty date?

That depends on the permission you set. A common choice is notes only for technicians, and editing for the build supervisor and the office. The setting is agreed at the start. The owner can change it later.

How do existing pools get onto the register?

Your spreadsheets of customers and equipment notes are imported first. A dispatcher then walks a pool or two against the record. Gaps in install dates are filled from invoices. Otherwise the technician records what is at the pump room.

Will it tell me when a warranty is ending?

The record holds the end date, and the warranties report lists units ending this season. The office reads that list and decides whom to contact. The register does not contact customers by itself. A person sends the message.

Where it fits

How this feature fits the system.

Swimming Pool Company Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

Enquiries and site surveys

Every pool enquiry is logged with its source, the survey is scheduled, and measurements, soil notes and photographs stay on the customer’s record.

Lead Management

Quotations and design options

A pool is priced as shell, coping, decking, lighting and equipment options, with each revision kept until the customer signs one.

Estimate/Quotation Management

Construction stages and inspections

A build becomes a job that moves from excavation to first fill, with the inspection sign-off recorded at each stage.

Work Order Management
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements