Weekly pool service routes and water test log
Service is a promise to visit the same pool on the same day, week after week. This feature plans routes by day and technician, records chlorine, pH, alkalinity and stabiliser at every stop, and keeps the history for each pool. Technicians log on a phone. Dispatchers see the day as it happens.
What a pool route and water test record keeps
A route is a list of pools in a driving order for one technician on one day. Each stop adds a reading to that pool’s history. Four kinds of record sit under the feature. Together they answer a customer’s question about last month’s water.
Routes and water tests through a service week
A service week is a pattern of repeating days with a few surprises. These four moments follow the route from the dispatcher’s plan to a customer’s question. The same record carries each of them. No clipboard goes back to the depot.
Who uses routes and the test log
Two roles live in this feature. Technicians write the readings and dispatchers arrange the routes. The owner and the office read what comes out. Each sees a different slice of the same log.
Decisions to settle before routes go live
Routes and test fields are specific to each firm. A few decisions at the start decide how the log behaves for the next season. Settle them with the dispatcher and a senior technician.
How routes and the log connect to the product
The route sits between the office and the pool. It takes pool facts from the record and gives findings and readings back to the other features. Five links show where each piece of data goes next. Nobody rekeys a reading. Nobody rebuilds a history either, since the record travels with the pool.
- Reads volume and equipment from pool records and equipment register
- Raises repair calls from findings made on a visit
- Reduces truck balances through doses in chemical stock per truck
- Feeds opening, closing and service plans with visit history
- Shows owners chemical use against service visits made
Where routes and the test log stop
This feature records readings that technicians enter from their own test kits or meters. It does not test the water, read a sensor or decide a dose. A sensor feed is not included unless it is scoped separately. Treatment decisions and safety rules stay with the technician, the owner and any regulator. This is a log, not a lifeguard. A lone technician with a few pools can keep a notebook.
Frequently asked questions
Which readings are recorded at each pool visit?
Chlorine, pH, alkalinity and stabiliser, with the chemicals added and a note on water clarity and any finding. The fields follow your own service sheet. Target ranges are agreed with you at the start of set-up.
Can the dispatcher see readings during the day?
Yes. Readings reach the pool’s record when saved at the stop. A pool flagged cloudy or green shows on the day’s list. Dispatchers can redirect a technician before the next stop. The list updates as stops are saved.
How are weather cancellations handled?
A dispatcher moves a day’s visits to another day, and customers are told by message. Route order for the new day is reset from the same list. Nobody retypes the stops. Customers get the message.
Can I see one pool’s readings over a season?
Yes. The history for each pool is kept in date order and can be searched. A customer’s question about one week in spring is answered from that list. The chemicals added are shown beside each reading.
Does it tell a technician what dose to add?
Standard doses for your chemicals are configured from your own service sheet. The technician still decides what goes into the pool. The record shows what was logged. It gives no treatment advice of any kind.
How this feature fits the system.
Swimming Pool Company Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.
Enquiries and site surveys
Every pool enquiry is logged with its source, the survey is scheduled, and measurements, soil notes and photographs stay on the customer’s record.
Lead ManagementQuotations and design options
A pool is priced as shell, coping, decking, lighting and equipment options, with each revision kept until the customer signs one.
Estimate/Quotation ManagementConstruction stages and inspections
A build becomes a job that moves from excavation to first fill, with the inspection sign-off recorded at each stage.
Work Order ManagementTell us what you need.
Tell us what your team does today, where work gets stuck and what you want to change.
What happens after you share your requirements
- We review your brief and the systems you already use.
- We clarify the workflow, missing information and the work to consider first.
- The proposed scope sets out the deliverables, responsibilities and dependencies.
- Review the scope and commercial terms before deciding whether to proceed.
Start with your requirements
Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.
Share your requirements