Skip to main content
GullySystem

Weekly pool service routes and water test log

Service is a promise to visit the same pool on the same day, week after week. This feature plans routes by day and technician, records chlorine, pH, alkalinity and stabiliser at every stop, and keeps the history for each pool. Technicians log on a phone. Dispatchers see the day as it happens.

What a pool route and water test record keeps

A route is a list of pools in a driving order for one technician on one day. Each stop adds a reading to that pool’s history. Four kinds of record sit under the feature. Together they answer a customer’s question about last month’s water.

Routes by day and technician

Each route names the technician, the weekday and the pools in visiting order. The same route repeats week after week until it is changed. A new pool is dropped in at the stop that suits the drive. No stop is renumbered by hand.

Test readings at each stop

Chlorine, pH, alkalinity and stabiliser are entered for every visit, along with a note on water clarity. The fields and target ranges follow your own service sheet. Readings come from the technician’s own test kit or meter. No reading arrives automatically.

Chemicals added and findings

The record shows which chemicals went into the pool at that visit and how much. A finding, such as a cracked skimmer or a worn pump seal, is typed in beside it. Photographs can go in too.

History for each pool

Every reading stays on the pool, in date order, from the first visit. A customer asking about algae in spring can be shown what was measured and added, visit by visit. Search replaces a box of paper.

Routes and water tests through a service week

A service week is a pattern of repeating days with a few surprises. These four moments follow the route from the dispatcher’s plan to a customer’s question. The same record carries each of them. No clipboard goes back to the depot.

Monday morning at the depot

A technician opens the day’s route on a phone before loading the truck. The pools are in driving order, each with the notes left by the last visit. Nobody phones the office for the list.

A reading outside the range

At a stop, the pH comes out above the target range on the service sheet. The technician enters it and the pool is flagged. A note on clarity goes in beside it. The dispatcher sees the flag before lunch.

Rain stops the Thursday route

Heavy rain makes the Thursday visits pointless. The dispatcher moves the day’s pools to Friday. The customers are told by message. Route order for the new day is reset from the same list of pools.

A customer asks about last month

A homeowner rings to say the water was green three weeks ago. The office opens the pool and reads the readings and chemicals added on each visit. Dates come from the record.

Who uses routes and the test log

Two roles live in this feature. Technicians write the readings and dispatchers arrange the routes. The owner and the office read what comes out. Each sees a different slice of the same log.

Service technicians on the road

A technician sees the day’s route, each pool’s volume and equipment, and the previous readings. Findings are flagged for the office. No sheet is copied out at night. A route is finished when the last stop is saved.

Dispatchers planning the week

A dispatcher builds the routes, balances the load between technicians and moves visits when weather or sickness gets in the way. The list of pools with readings out of range is worth checking first each morning. It is short.

Office staff answering customers

Staff open a pool and read its history while the customer is on the line. They can see who visited, when, and what was added. They do not rebuild a story from paper sheets. The call ends with an answer.

Owners reading performance

The owner sees visits completed by technician and route, and the pools with readings out of range. Those two lists show whether the week went to plan. Any single reading can be opened. Nobody has to ask the technician.

Decisions to settle before routes go live

Routes and test fields are specific to each firm. A few decisions at the start decide how the log behaves for the next season. Settle them with the dispatcher and a senior technician.

Which fields every stop needs

Decide which test fields are required at each stop and which target ranges flag a pool. Your own service sheet is the starting point. A shorter list gets filled in. A longer one gets skipped at the pool gate.

Who may reorder a route

Decide who can change the order of stops. If every technician can, the plan drifts. If only the dispatcher can, a technician stuck in traffic must phone the office. Choose the rule that suits your team.

How current routes come across for weekly routes and water test log

Your spreadsheets of customers and weekly route sheets are imported, so routes continue without a gap. Walking a route is the check. Driving a route or two against the import is the dispatcher’s check before the first live week.

First view to open each day

Start with pools whose readings are out of range, since that list needs action each day. Add visits completed by technician later. Starting with one list is easier to learn. It is also easier to trust.

How routes and the log connect to the product

The route sits between the office and the pool. It takes pool facts from the record and gives findings and readings back to the other features. Five links show where each piece of data goes next. Nobody rekeys a reading. Nobody rebuilds a history either, since the record travels with the pool.

  • Reads volume and equipment from pool records and equipment register
  • Raises repair calls from findings made on a visit
  • Reduces truck balances through doses in chemical stock per truck
  • Feeds opening, closing and service plans with visit history
  • Shows owners chemical use against service visits made

Where routes and the test log stop

This feature records readings that technicians enter from their own test kits or meters. It does not test the water, read a sensor or decide a dose. A sensor feed is not included unless it is scoped separately. Treatment decisions and safety rules stay with the technician, the owner and any regulator. This is a log, not a lifeguard. A lone technician with a few pools can keep a notebook.

FAQ

Frequently asked questions

Which readings are recorded at each pool visit?

Chlorine, pH, alkalinity and stabiliser, with the chemicals added and a note on water clarity and any finding. The fields follow your own service sheet. Target ranges are agreed with you at the start of set-up.

Can the dispatcher see readings during the day?

Yes. Readings reach the pool’s record when saved at the stop. A pool flagged cloudy or green shows on the day’s list. Dispatchers can redirect a technician before the next stop. The list updates as stops are saved.

How are weather cancellations handled?

A dispatcher moves a day’s visits to another day, and customers are told by message. Route order for the new day is reset from the same list. Nobody retypes the stops. Customers get the message.

Can I see one pool’s readings over a season?

Yes. The history for each pool is kept in date order and can be searched. A customer’s question about one week in spring is answered from that list. The chemicals added are shown beside each reading.

Does it tell a technician what dose to add?

Standard doses for your chemicals are configured from your own service sheet. The technician still decides what goes into the pool. The record shows what was logged. It gives no treatment advice of any kind.

Where it fits

How this feature fits the system.

Swimming Pool Company Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

Enquiries and site surveys

Every pool enquiry is logged with its source, the survey is scheduled, and measurements, soil notes and photographs stay on the customer’s record.

Lead Management

Quotations and design options

A pool is priced as shell, coping, decking, lighting and equipment options, with each revision kept until the customer signs one.

Estimate/Quotation Management

Construction stages and inspections

A build becomes a job that moves from excavation to first fill, with the inspection sign-off recorded at each stage.

Work Order Management
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements