Skip to main content
GullySystem

Claims and damage register for logistics operators

A damage or shortage claim needs the inward count, the loading sheet and the delivery proof, and each used to sit in a different place. This feature opens a numbered claim against the consignment and brings all three into one view. Reply, amount settled and any recovery from a carrier stay with it.

A shortage claim from first call to settlement

A client rings to say pallets were short at delivery. The account manager opens a claim during the call. It gets a number, an owner and a date for the reply. The evidence is gathered next. It comes from three documents that already exist.

Opening the claim against the consignment

Whoever opens it picks the consignment and states the reason: shortage, damage or both. The claim receives a number and an owner. Nothing about it floats in an inbox.

Pulling the three documents together

The inward count, the loading sheet and the delivery proof appear on one screen. Whoever owns the claim compares quantities at each stage. Where goods went missing is easier to see. The comparison is quick.

Replying to the client

Each reply is drafted from the facts and kept on the claim, with the date it was sent. The client gets an answer by the date set. Later queries refer to the same reply.

Recovering from a carrier

If a hired carrier caused the damage, the recovery is noted on the same claim with the amount sought. The settlement with the client and the recovery stay together. Net cost is then plain to see.

Contents of a claim record

Think of a claim record as a folder built around one consignment. It holds what the client says, what the documents show and what was decided. Every item is dated. It can be read again long afterwards by anyone with access.

Claim number, owner and dates

Each claim has a number, an owner and the dates it was opened and replied to. That owner is one named person. The status moves from open to replied, then to settled or declined, and each step is dated.

Reason, quantity and goods affected

The claim states whether goods were short, damaged or both, with the quantity and the item as the client counts them. The reason is chosen from a list. Claims can then be counted by cause.

Inward count, sheet and proof

These three documents are linked to the claim. The count at the dock, the loading sheet at the bay and the signed copy at the consignee sit side by side. Differences are visible at a glance.

Settlement and carrier recovery

The amount settled with the client is recorded with the reply that agreed it. Any recovery from a carrier is noted separately, with the carrier’s name and the sum sought. Net cost is read from the two.

Who handles a claim, and what each needs

Several desks touch a claim. Account managers face the client, the warehouse explains the count, the desk explains the trip and the owner approves the settlement. No one forwards a file.

For account managers facing the client

Open the claim, read the evidence and reply by the date set. Reply and amount settled stay with the claim. Repeat callers get the same answer. All of it stays on file.

For warehouse supervisors explaining the count

Read the inward count and the dispatch against the claim. Show whether the goods arrived complete and left complete. Your records answer that first question. Blame comes later.

For the transport desk explaining the trip

Read the loading sheet, the trip and the delivery proof. If a hired carrier was used, add the recovery note. The desk supplies the road side. That is quick work.

For owners approving settlements

See claims by client, reason and amount settled. Repeat claims from a client, or repeat damage on a lane, stand out. Settlement limits and approvals stay with the owner.

How a claim draws on records across the product

Few records belong to a claim alone. It borrows the inward count, the loading sheet and the delivery proof. It hands back reasons to the exceptions list and amounts to margin. Where a credit is agreed, invoicing carries it to the client. Nothing in the claim is retyped.

  • Pulls the inward count from inward, storage and outward records
  • Reads the loading sheet from trip planning and loading sheets
  • Takes delivery proof and exception notes from the consignment
  • Passes agreed credits to client invoicing from recorded activity
  • Feeds claims paid into lane and trip margin

Claim rules to agree before the first complaint

Claims arrive when people are annoyed, so the rules need to be settled early. Agree them with the account managers and the owner together. Test them on one old complaint from your own files. Use a real one.

Who owns a claim from its opening

Name the role that owns a claim from the first call to the final reply. One owner is better than a committee. The record shows that owner’s name throughout.

How much a manager may settle alone

Set the amount below which an account manager can agree a credit without the owner. Anything above goes to the owner. The limit is set at the start. No claim reopens the question.

What reasons are listed for a claim

Agree a short set of reasons beyond shortage and damage, such as a wrong item or a late delivery. Consistent reasons let claims be counted by cause.

How a carrier recovery is recorded

Decide whether recovery from a hired carrier is netted against the broker’s balance or invoiced separately. The choice affects how the broker’s settlement and the claim reconcile. Pick one early.

Limits of the claim register for the owner

The register keeps the evidence and the decisions. It does not decide liability, value the goods or advise on the client’s insurance. Those questions go to the owner and, where the sums are large, to an adviser or an insurer. Photographs of damage are kept as attachments only. A firm with one claim a year may keep a folder.

FAQ

Frequently asked questions

What documents come into one view on a claim?

The inward count, the loading sheet and the delivery proof come into one view for the consignment. The client’s reply and the amount settled are kept with them. Reading takes one screen, not three registers.

Can a claim be opened against part of a consignment?

Quantity and item are stated on the claim, so it can cover part of a consignment. The rest of the load is left alone. Delivery proof for the whole consignment stays visible beside it, for comparison.

Does the register track claims against carriers?

Recovery from a carrier is noted on the claim, with the carrier’s name and the amount sought. The settlement with the client stays separate. Together they give the net cost to your firm. The two sums are never mixed.

How are repeat claims spotted?

Claims can be read by client, reason and amount settled. Repeat claims from one client or consignee stand out in that view. That is easy to see. What to do about it is a decision for the owner.

Who sets the reply date on a claim?

The date is set when the claim is opened, by the owner or the account manager as you decide. Claims past that date show in the open list. Late replies are therefore easy to find.

Where it fits

How this feature fits the system.

Third-Party Logistics Company Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

Client contracts and rate cards

Each client agreement stores its rate card, validity dates and free days, so every booking and every storage day is priced from the right contract.

Contract Management

Dispatch requests and consignments

A client’s plan becomes numbered consignments with consignee, quantity and promised date, followed through booked, loaded, in transit and delivered.

Order Management

Own vehicles and drivers

Owned trucks keep their registration, insurance and service dates, and each trip records the driver, the fuel used and the cost of running it.

Vehicle and Trip Management
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements