Skip to main content
GullySystem

Job Costing Against the Quoted Tree Price

A removal is only worth doing if it earns more than it cost. This feature sets crew time, equipment, fuel, disposal fees and subcontracted crane hire against the quoted price of each job. The owner reads the difference while the day is still fresh. Each job gets its own margin.

A removal’s cost as four people read it

A finished job leaves a trail of hours, fuel, tipping tickets and a crane invoice. Four people want to know what it added up to, and each reads the figures for a different reason. All of them use one comparison.

For owners judging the margin

The owner opens job cost against quoted price and sees at once which removals earned their keep. A losing job is easy to find. Pricing and crew choices can be questioned with real figures from the job.

For estimators checking their prices

An estimator reads how far a finished job moved from the quotation, line by line. Labour that ran long or a disposal load nobody expected explains the gap. The next price starts from that lesson.

For the office entering outside costs

Invoices from a crane hire firm and tipping tickets for green waste reach the office. Each is entered against the job it belongs to. The cost then appears with the rest. Nothing waits in a drawer.

For crew leaders recording the facts

Crew leaders do not calculate cost. They record times, equipment used and loads taken away from the site. Those entries are the raw material of the figure that the owner reads afterwards. Accuracy at the site matters.

Cost lines gathered under each tree job

Each job collects its costs in the same few places: people, machines, fuel, disposal and hired help. Set beside the price that was quoted, they show whether the work earned its keep. Every line traces back to an entry made on the job. Each line has a source.

The quoted price as yardstick

The price agreed with the client sits at the top of the job. Costs are measured against it. If the client approved extra work, that variation is recorded too, so the comparison is fair to the crew.

Crew time costed by person

Hours entered for each climber and groundsman are costed at the pay rate that applies to that person. The job shows who worked on it and for how long. Labour is never a single guess.

Machines, fuel and tipping fees

Machine hours, diesel and disposal charges for loads taken away or brush chipped are added as separate lines. Whether labour, machines or the tip made a removal costly is plain. Each stays visible on its own line.

Subcontracted crane hire

When a job needs a crane the firm does not own, the hire charge is entered on the job. It appears as its own line. A removal that needed hired lifting shows the full weight of that choice.

From finished removal to margin question

Costing happens after the work, when invoices arrive and the crew has moved on. Late bills are normal. Margins are read once the entries are in. These scenes show how the figure for one job is built, questioned and then used for the next price.

Tuesday’s removal closes

A crew finishes felling a large cedar. The leader has entered the hours, the chipper and the loads taken to the tip. The job’s cost lines are ready for the owner to read. The crew has nothing more to do.

A hedge job that ran over

A hedge-cutting job was priced low. The cost comparison shows more crew hours than the quotation allowed. The estimator sees where time went and adjusts the labour allowance for similar hedges. Hours, not hunches, drive the change.

The hire invoice arrives

A bill for a hired crane lands in the office a few days after the job. It is entered as hire. The margin figure moves and the owner sees the true result. A late bill still counts.

Pricing the next cedar

Another cedar needs a quotation. The estimator looks up the earlier removal and reads its costs by line. The new price rests on what the last job truly took, not on memory. The figures are already on file.

Costing choices that decide what margin means

A margin is only as meaningful as the rules that built it. Fix them first. These four decisions fix what a job cost figure includes and when it is read. They are worth settling before the first job is closed.

Which costs belong to a job

Crew time, fuel, disposal and hired crane time are plain. Decide whether the yard, the insurance and the office staff are shared out as well. Leaving them out gives a clean job margin. Including them is a different measure.

How a machine is charged

A chipper can be charged to a job at an hourly rate, or by the fuel and servicing it used. Choose one method. Mixing both means one job looks cheaper than another for no real reason.

When a job counts as finished

Costs trickle in after the work is done. Decide whether a job is read as final once the invoice is raised, or only when the last supplier bill is entered. Late entries then have a clear home.

Who sees the margin figure

Some firms show job cost only to the owner. Others let estimators see it so their prices improve. Decide who reads it, and whether crew leaders see the comparison for their own jobs. Choose with care.

Why a job cost differs from profit

The feature compares costs you enter with the price you quoted. It cannot see costs nobody recorded, and it does not set prices for you. Office overheads, depreciation and tax treatment are matters for the owner and the accountant. A figure is only as full as the entries behind it. It is a comparison, not a verdict. A sole trader with a handful of jobs can work out the sum on paper.

Where the cost figures come from and go

Job costing is a meeting point. It takes figures from the people, machines and invoices around the job, and it sends a result back to pricing. Because it relies on others, any gap upstream shows here first. Complete entries elsewhere make this page trustworthy. Five feeds follow.

  • Crew pay figures arrive from attendance and hours
  • Machine hours and fuel arrive from equipment records
  • Quoted price comes from the accepted quotation
  • Subcontracted crane hire is entered on the job
  • Costs guide later quotations and contract renewals
FAQ

Frequently asked questions

Can I read cost against price before a job ends?

The comparison builds as hours, fuel, loads and invoices are entered. An owner can look at a running job and see what has been recorded so far. Early figures are partial. A figure is final only when the entries are complete.

Where does disposal cost come from?

Loads taken away and brush chipped are logged on the job, and disposal fees are entered against them. Those fees then appear as their own line in the cost comparison, apart from labour and machines. Tipping charges stay separate.

How is hired crane time recorded?

The office enters the hire firm’s charge on the job as subcontracted crane hire. How much of a removal’s cost was lifting the firm did not own is plain to read.

What happens when a client approves extra work?

The approved change is recorded on the job. The comparison then uses the agreed price with that variation, not only the first quotation. Costs for the extra work join the same job. Both figures stay visible.

Does job cost include office overheads?

The job holds the crew, machine, fuel, disposal and hire costs recorded against it. Office overheads are outside it. How the firm shares them is for the owner and the accountant. Keep that boundary in mind when reading margins.

Where it fits

How this feature fits the system.

Tree Service Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

Enquiries and surveys

Each enquiry is logged with its source and address, the survey is booked, and tree records and photographs stay on the client record.

Lead Management

Quotations by tree and task

Every tree and task is priced from the firm’s labour, equipment and disposal rates, with each revision kept beside the open quotes.

Estimate/Quotation Management

Jobs and crew scheduling

Climbers, groundstaff, vehicles and cranes are placed against the day’s jobs, so a clash shows before a date is promised to a client.

Technician Scheduling
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements