Cloud Migration Services for Multiple Systems

Cloud migration services cover businesses with several systems to move. An assessment decides what moves, what is retired, what stays in place and in what order the rest travels.

Why the inventory changes the plan

Before anything moves, every server, database, scheduled job and shared folder is listed with what depends on it. Two systems may do the same job. One may be unused since its owner left. A third may wait on a licence question with its vendor.

How a programme is sequenced

A low-risk system first

A real but non-critical system moves first, and the approach, the access and the rehearsal routine are proved on it before larger systems follow.

Dependencies kept together

Systems that talk constantly move in the same wave, because a pair split across two locations runs slower and costs more. Pairs travel together.

A planned hybrid period

Part of the estate runs on old infrastructure and part on new, and the link between them is designed in advance rather than improvised.

Decommissioning as a step

Old machines are switched off on an agreed date. A programme that retires nothing pays for both environments.

Choosing the destination

  • Licensing you already hold, which can outweigh a technical comparison
  • Data residency requirements from customers or your sector
  • Who will operate the systems afterwards and what that team knows

Seven outcomes for each system

AWS’s large-migration guidance sorts each application into one of seven outcomes. The assessment assigns every system to one of them.

Rehost

Move it as it is onto cloud servers. Quick, with little change.

Replatform

Move it and swap one part, for instance a self-run database for a managed one.

Relocate

Move a group of servers to the cloud version of the same platform, or between accounts, without rewriting anything. It suits estates already built on a virtualisation platform.

Refactor

Rebuild parts of it to use cloud services. It is the most complex and costly outcome, so AWS advises doing it after the move for large programmes.

Repurchase

Replace it with a hosted product. Sensible for commodity needs such as mail or HR.

Retire

Switch it off because nobody needs it. Inventories turn up several of these.

Retain

Leave it where it is for now, with a reason recorded. Typical reasons are data residency, specialised hardware or a pending move to a hosted version.

What the assessment produces

  • A list of systems with an outcome for each and the reason
  • Dependencies drawn between systems, networks and outside services
  • A wave plan with order, owners and rehearsal dates
  • A risk list covering licences, data residency and downtime windows
  • A rough cost comparison between staying and moving

Common reasons programmes stall

No named owner per system

When nobody can say who uses a system, nobody can approve its move. Owners are named early.

Hidden dependencies

A spreadsheet macro reading from a shared drive can break when the drive moves. Interviews with users find what scans miss.

Running both worlds too long

Hybrid periods cost double. Each wave has an end date for its old servers.

Questions for a multi system migration partner

  • How do you find dependencies we have forgotten?
  • What happens to systems you advise us not to move?
  • Who signs off each wave?

Migration waves as the business lives them

A migration programme moves systems in waves. Every wave lands on a different group of people. Waves differ in size. Operations, the app owners and support all have a part.

Owner signs the wave plan

The application owner reads the plan for the systems in the wave: what moves, when, and who is on call. Questions are put in writing. Nothing starts unsigned. A signed plan is filed before work begins on any system.

Users are told what changes

Staff get a short notice with the new address, the date and the contact for problems. Training is a single page. People who work late are asked whether the window suits them, too. Feedback is welcome.

Cut-over night in operations

Engineers follow the checklist, with each step ticked and timed. A failed step is discussed before moving on. A rollback decision is made by a named person. Nobody else decides it, whoever sits nearest the keyboard.

Day after at the support desk

Support reads the list of problems raised since the move and sorts them by system. Patterns go to the engineers the same day. Once quiet, the wave is closed and the next one is planned.

Make an informed decision

Questions to settle before rollout.

Use a representative scenario to decide what this part of the system must show and where review is still needed.

Cloud Migration Services for Multiple Systems

Which differences must be resolved before the old system is retired?

For “Cloud Migration Services for Multiple Systems”, compare a sample of linked records and control totals across the old and new systems. Assign an owner to every unexplained difference before cutover.

Background reading: AWS: source and target validation

FAQ

Frequently asked questions

Do cloud migration services mean moving everything?

No. Some systems are retired, some go to a managed platform and some stay where they are. The assessment decides each one.

Can part of our setup stay on-premise?

Yes. A hybrid arrangement is common where an ERP or shop-floor machine cannot move, and the link between the two halves is designed as part of the plan.

What if our application code is old?

That assessment comes first. Some old code moves unchanged, some needs a runtime upgrade, and some is better left as it is.

Will you support the systems after they land?

Yes, if you want that after the move. Some businesses take over with the documentation, and others keep a managed arrangement with us.

How long does a multi-system migration take?

It runs as a programme over months, not days. Each wave has its own rehearsal and window. A calendar based on your systems comes out of the assessment.

Is lift and shift a bad idea?

Not by itself. It is the safest first step, because it moves risk out of the old data centre quickly. Savings from redesign can follow once the systems are stable.

What does it do to our staff?

Teams need time for testing and sign-off in each wave. Training on the new environment is planned alongside, so people are not learning during a cut-over.

Should we modernise applications while we migrate them?

For large programmes the usual advice is to move first and modernise afterwards. Combining both multiplies the number of things that can go wrong. Exceptions are systems that cannot run on the new platform as they are.

Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.