Production Planning for Aluminium die casting companies

Plan manufacturing quantities against demand, materials and capacity.

Manufacturing

Does this function belong in your operation?

Use when the business manufactures, assembles or prepares physical products.

Confirmed demand needs a production schedule.

Planners assign each die to a machine by tonnage, then balance trim, shot blasting and machining capacity. A die under repair shows as unavailable. Customer pull dates drive the order of runs.

Bring the records the workflow depends on.

  • Demand and due dates
  • Material availability
  • Production capacity and calendars

Outputs to check

  • Demand-linked production schedule
  • Material and capacity exception list
  • Released-work requirement record

Follow the production planning workflow.

Use this sequence to compare your current process with the proposed module. Agree the owner, permission and exception at each step.

  1. 1. Collect demand

    Use confirmed orders and approved replenishment requirements.

  2. 2. Calculate output needs

    Apply the appropriate material and production definitions.

  3. 3. Check constraints

    Compare required materials and capacity with available resources.

  4. 4. Approve the sequence

    Set priorities and record any displaced or deferred work.

  5. 5. Release and monitor

    Create work-order handoffs and revise the plan using actual progress.

Who uses the module, and who approves?

Keep responsibilities distinct even when one person holds more than one role.

Production in-charge

Lays out the day or the week and adjusts it when a machine stops.

Storekeeper

Checks the materials required by released work and identifies shortages or unissued quantities.

Owner

Reads how much of the plan is being met, and where the same excuse keeps appearing.

Decide how exceptions are handled.

These business rules belong in configuration and testing. A normal transaction alone does not demonstrate that the workflow is ready.

Material shortage

Identify the affected output and revise the release or purchasing action.

Machine unavailable

Reschedule the dependent work and check alternative capacity before confirming dates.

Urgent order inserted

Record which existing jobs move and obtain the required priority decision.

Can this work independently?

Planning needs demand, material definitions and capacity assumptions. These can be entered independently, but order, stock and work-order links keep the plan aligned with actuals. Releasing a plan does not issue material or record completed output; those execution steps need their own records.

Systems and records it connects with

  • Bill of materials: Approved component quantities and production-definition versions.
  • Work orders: Released production jobs, material issues and output records.
  • Stock: Item-location quantities and authorised stock movements.
  • Purchase orders: Authorised supplier commitments and open line balances.

Configure, test and introduce the workflow.

  • Walk us through machines, ovens or lines and the shifts they run. A written map of capacity comes back.
  • Tell us which items repeat daily. A set of standing quantities is returned for approval. Sales orders and stock arrive from your existing records. A trial plan appears for a sample day.
  • Overlap for a while. The floor uses the screen while the whiteboard stays up, and differences are noted.

Check the result before rollout.

Apply these checks to a sample from the agreed workflow, then repeat with an exception. Keep the expected result beside the test record.

  • Planned quantities reconcile with demand.
  • Shortages are visible before release.
  • Capacity assumptions are recorded.
Aluminium die casting companies

How the business operates.

A die casting cell is fast and unforgiving. A furnace holds molten alloy, a machine fires it into a steel die in seconds, and a trim press removes runners and overflows. A hundred castings an hour leave the cell. Small shifts in die temperature, spray or metal quality show up as porosity or cold shuts.

Alloy lot and melt record

Record ingot lots, returned scrap, degassing and the chemistry sample for each melt, and tie them to the shots cast.

Die register and shot counts

Count shots per die, log cleans, polishing and repairs, and flag a die before it passes its limit.

See the full industry workflow, reports and implementation plan →

The records that hold the operation together.

  • Part list and call-offs. Hold each casting with its drawing revision, alloy grade such as A380 or ADC12, die and route. Load call-offs and revisions by week.
  • Alloy and ingot stock. Receive ingot by heat lot, issue it to melts, and keep returned gates and dross on separate accounts.
  • Melt and chemistry record. Record each melt, its charge, degassing time and spectrometer sample, then release it to the holding furnace once the chemistry passes.
  • Machine and die planning. Plan machines by clamping tonnage and dies by availability and shot count, and show which die change comes next to the setters.

Operational bottlenecks to check

Alloy lots mix in the furnace

Fresh ingot and returned runners are charged together into one furnace. When a casting fails chemistry, the lot that fed that melt is unclear, and every casting from the shift comes under doubt.

Die life is counted on a tag

Shots run on a die decide when it needs a clean, a polish or a repair. The tag is updated at changeover, but a die pulled off the machine in a hurry keeps yesterday’s count and nobody notices until it cracks.

How work flows across this business

This module sits within a wider operating process. Use the sequence to identify the other teams and records affected by a change.

  1. 1. Call-off and plan

    Call-offs are loaded by part and week. The planner assigns a machine, a die and an ingot lot, then checks the die’s shot total against its cleaning limit before the setter is told.

  2. 2. Melt

    Ingot and returned gates are charged, degassed with a rotary impeller and sampled for the spectrometer. A passing chemistry result releases the melt to the holding furnace.

  3. 3. Casting run

    The operator records the die, the plunger speed settings, the intensification pressure and the shots. Good and rejected counts are entered when the run closes.

  4. 4. Trim and remelt

    Castings go to the trim press while biscuits, runners and overflow wells are weighed back for remelt. Yield per part updates on the spot.

  5. 5. Test and machine

    Samples go for X-ray, density index or helium leak checks. Passed lots follow the route card to machining, deburring or impregnation.

  6. 6. Dispatch

    Crates are counted, labelled and loaded. Once the truck leaves, the invoice and the dispatch record close the call-off.

Industry reports to connect with

  • Call-offs against shipments by part and week
  • Melts with chemistry results and castings made
  • Shots and rejects by die
  • Metal yield by part and by melt

Questions before implementation.

When should aluminium die casting companies consider production planning?

Use when the business manufactures, assembles or prepares physical products. Confirmed demand needs a production schedule.

What should we bring to the requirements discussion?

Bring anonymised examples of Demand and due dates; Material availability; Production capacity and calendars. Show who creates, checks and changes each record. Use only records from an activity that meets the suitability conditions above.

Does this replace our existing business software?

The starting point is your current system and the gap you need to close. Plan manufacturing quantities against demand, materials and capacity. Configuration, a connected module or a custom build are evaluated against that gap before a replacement is proposed.

What is outside this module?

Production output depends on actual materials, equipment and execution. The plan records assumptions and revised decisions as those conditions change.

How are scope, price and rollout decided?

The proposal follows a review of your records, user roles, branches and existing software. Data migration, connections, training and support are scoped separately where needed. Planned quantities reconcile with demand. Use this check when reviewing the first working version.

Talk to us

Discuss production planning for your business.

Tell us which workflow needs attention and which systems your team uses. The next step is a requirements discussion and a written scope.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements