Job Work Management for Aluminium die casting companies
Track material sent to an outside processor and returned after work.
Does this function belong in your operation?
Use when your materials leave for processing and must be reconciled on return.
A production stage is subcontracted with material supplied by your business.
Machining, impregnation and anodising go to outside vendors with counted delivery notes. Weight returned is checked against weight sent for each lot. Open balances are listed per vendor.
Bring the records the workflow depends on.
- Vendor and process details
- Material quantities
- Return and wastage terms
Outputs to check
- Subcontract dispatch and return register
- Processor-held material balance
- Job-work charge reconciliation
Follow the job work management workflow.
Use this sequence to compare your current process with the proposed module. Agree the owner, permission and exception at each step.
Who uses the module, and who approves?
Keep responsibilities distinct even when one person holds more than one role.
Decide how exceptions are handled.
These business rules belong in configuration and testing. A normal transaction alone does not demonstrate that the workflow is ready.
Can this work independently?
This can track outside processing with entered dispatch and receipt records. Stock and accounting connections reconcile material ownership and processing charges; quality control decides acceptance. A vendor's completion message is not a physical return or proof that the returned output meets specification.
Systems and records it connects with
- Work orders: Released production jobs, material issues and output records.
- Stock: Item-location quantities and authorised stock movements.
- Vendor bills: Supplier invoice lines and authorised posting status.
- Purchase returns: Approved supplier-return quantities and adjustment references.
Configure, test and introduce the workflow.
- We list the outside processes you use and the vendors for each. You describe how notes and returns are handled today. A flow diagram comes back for your approval.
- Rates, process names and wastage allowances are entered. You confirm them with the production team. Material currently lying outside is loaded from your registers. The store team checks balances with the vendors. Mistakes surface early.
- New outward notes are made on the screen while the old book continues. Returns are booked and compared. The team is trained. The paper book is retired. The oldest balances are reviewed at the next meeting.
Check the result before rollout.
Apply these checks to a sample from the agreed workflow, then repeat with an exception. Keep the expected result beside the test record.
- Sent and returned quantities reconcile.
- Material held by each processor remains visible.
- Charges link to the relevant job.
How the business operates.
A die casting cell is fast and unforgiving. A furnace holds molten alloy, a machine fires it into a steel die in seconds, and a trim press removes runners and overflows. A hundred castings an hour leave the cell. Small shifts in die temperature, spray or metal quality show up as porosity or cold shuts.
The records that hold the operation together.
- Part list and call-offs. Hold each casting with its drawing revision, alloy grade such as A380 or ADC12, die and route. Load call-offs and revisions by week.
- Alloy and ingot stock. Receive ingot by heat lot, issue it to melts, and keep returned gates and dross on separate accounts.
- Melt and chemistry record. Record each melt, its charge, degassing time and spectrometer sample, then release it to the holding furnace once the chemistry passes.
- Machine and die planning. Plan machines by clamping tonnage and dies by availability and shot count, and show which die change comes next to the setters.
Operational bottlenecks to check
Alloy lots mix in the furnace
Fresh ingot and returned runners are charged together into one furnace. When a casting fails chemistry, the lot that fed that melt is unclear, and every casting from the shift comes under doubt.
Die life is counted on a tag
Shots run on a die decide when it needs a clean, a polish or a repair. The tag is updated at changeover, but a die pulled off the machine in a hurry keeps yesterday’s count and nobody notices until it cracks.
How work flows across this business
This module sits within a wider operating process. Use the sequence to identify the other teams and records affected by a change.
1. Call-off and plan
Call-offs are loaded by part and week. The planner assigns a machine, a die and an ingot lot, then checks the die’s shot total against its cleaning limit before the setter is told.
2. Melt
Ingot and returned gates are charged, degassed with a rotary impeller and sampled for the spectrometer. A passing chemistry result releases the melt to the holding furnace.
3. Casting run
The operator records the die, the plunger speed settings, the intensification pressure and the shots. Good and rejected counts are entered when the run closes.
4. Trim and remelt
Castings go to the trim press while biscuits, runners and overflow wells are weighed back for remelt. Yield per part updates on the spot.
5. Test and machine
Samples go for X-ray, density index or helium leak checks. Passed lots follow the route card to machining, deburring or impregnation.
6. Dispatch
Crates are counted, labelled and loaded. Once the truck leaves, the invoice and the dispatch record close the call-off.
Industry reports to connect with
- Call-offs against shipments by part and week
- Melts with chemistry results and castings made
- Shots and rejects by die
- Metal yield by part and by melt
Questions before implementation.
When should aluminium die casting companies consider job work management?
Use when your materials leave for processing and must be reconciled on return. A production stage is subcontracted with material supplied by your business.
What should we bring to the requirements discussion?
Bring anonymised examples of Vendor and process details; Material quantities; Return and wastage terms. Show who creates, checks and changes each record. Use only records from an activity that meets the suitability conditions above.
Does this replace our existing business software?
The starting point is your current system and the gap you need to close. Track material sent to an outside processor and returned after work. Configuration, a connected module or a custom build are evaluated against that gap before a replacement is proposed.
What is outside this module?
This concerns outsourced physical processing, not general professional-services subcontracting.
How are scope, price and rollout decided?
The proposal follows a review of your records, user roles, branches and existing software. Data migration, connections, training and support are scoped separately where needed. Sent and returned quantities reconcile. Use this check when reviewing the first working version.
Related functions for aluminium die casting companies.
Discuss job work management for your business.
Tell us which workflow needs attention and which systems your team uses. The next step is a requirements discussion and a written scope.
What happens after you share your requirements
- We review your brief and the systems you already use.
- We clarify the workflow, missing information and the work to consider first.
- The proposed scope sets out the deliverables, responsibilities and dependencies.
- Review the scope and commercial terms before deciding whether to proceed.
Start with your requirements
Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.
Share your requirements