Skip to main content
GullySystem
Manufacturing

Business solutions for Auto parts manufacturers

Explore software for work such as “Engine and drivetrain components”. Review each business function below, including when it fits and what to check before implementation.

Auto parts manufacturers

How the business operates.

An auto parts plant makes components to a customer’s drawing, such as a stamped bracket, a rubber bush, a cast housing or a moulded clip. The buyer is a vehicle maker. Each part number carries a drawing revision, a control plan, a failure-mode analysis (FMEA) and, where the buyer asks, a first-sample approval file (PPAP) before volume begins. Releases change without notice.

Customer part numbers and revisions

Hold each customer part with its drawing revision, material, control plan and PPAP file on one record, so that operators see the current print at the press. Nobody works from a superseded sheet.

Release schedules

Load customer releases and plan presses, tooling and coil against changing quantities. Every change is marked against the last release, so planners see what moved before booking.

Lot production and inspection

Record the machine, die, shift and material lot for each production lot, along with in-process and final gauge results, so that a feature outside its limit holds the lot.

Labels and shipping notices

Print customer-format barcode labels and advance shipping notices from the dispatch record, with nothing retyped. A wrong format is fixed once for every later shipment.

Returnable packaging

Track boxes and dunnage issued to each customer plant and returned from it, with balances by plant. Shortfalls show before the customer raises a charge.

Complaints and containment

Log customer complaints with the lot trace, containment steps, 8D corrective action and the date each step closed. Repeat causes show up by die and by supplier lot.

Subcontracted processes

Ship components to the plater, heat treater or e-coat line, then book back what returns good and what is rejected, with the outgoing and incoming weights side by side.

Press and die maintenance

Dies and fixtures are logged with stroke counts and repair history. Toolroom staff see which die is due. Production is warned before a die runs out of life.

Customer supplier scorecard

Buyers rate supply on delivery and quality. The record shows each rating with the customer’s comments. The plant head reviews gaps before the next review meeting with the buyer.

Material certificate register

Steel, aluminium and rubber lots arrive with mill certificates. Certificates are filed against the heat or lot. A customer asking for the certificate of a part gets the right one.

The records that hold the operation together.

  • Customer part master. Hold each part number with revision, material grade, die list, control plan and label format, so a setup never starts from a loose spreadsheet.
  • Revision control. Release a new drawing revision to the operator terminal and the gauge list together, and the earlier print is blocked at the machine.
  • Approval package files. Attach ballooned drawings, dimensional reports, material certificates and Cpk studies to the part and revision, so a first-article submission is assembled in one place.
  • Customer release planning. Load the forecast and daily call-offs from each customer plant, then compare them with the previous schedule before the planner sequences the week.
  • Material and tooling plan. Check coil, bar, resin, inserts and die availability against planned runs before a press or machining centre is booked.
  • Lot records. Capture press or machine number, die, shift, heat or resin lot and operator for each production lot, then print the lot number on the box label.
  • In-process and final inspection. Log gauge and CMM readings by lot against the control plan, with a hold on failed lots and a recorded reason for any release from hold.
  • Outside process orders. Follow brackets and shafts out to the plater, heat treater or powder coater, then match the counts on return and flag short or rejected pieces.

Operational bottlenecks to check

Customer releases change the plan daily

Weekly and daily schedules arrive from several vehicle plants, each in its own file layout, and the planner retypes them into a sheet. A late amendment is missed until a truck is short. The line stops at the customer.

Drawing revisions reach the shop floor late

A customer revises a drawing and the quality department updates the gauge, but the press operator still works from the earlier sheet at the machine. The lot is made to the old print. It is rejected on arrival at the dock.

First-sample approval files are scattered

Dimensional layouts, material certificates, the control plan and capability data for a new part sit in different folders, and volume production waits while somebody gathers the pieces. Sign-off drifts week by week.

Lot traceability stops at the pallet

A returnable box carries a label, yet the shift, press, die and coil lot behind it sit in a notebook. A defect found at the customer cannot be contained to a few boxes, so the pallet is sorted by hand.

Returnable boxes and labels go astray

Customer-owned boxes, dunnage and barcode label formats are tracked by memory, so boxes pile up at the customer and a label format is wrong. A truck is refused at the dock. Cost lands on the supplier.

Follow the work across teams.

This is a planning flow. Confirm the steps, owners and approval rules against your actual operation.

  1. 1. Part set-up

    A customer part number is entered with drawing revision, material grade, die list, control plan and label format, and the PPAP documents attach to that same revision.

  2. 2. Release received

    Load the schedule from the plant and the system compares it with the previous release, highlighting each part whose quantity or ship date moved. The planner then re-sequences the press line.

  3. 3. Plan and material

    Machines, dies and material are planned against the release, so a shortfall in coil, bar stock, resin pellet or threaded inserts shows before the run is booked. No press starts short.

  4. 4. Production lots

    Operators scan the press number, die or mould, shift and heat or resin lot at start-up, and first-off and patrol checks are logged against the lot as it runs.

  5. 5. Final check and dispatch

    Final inspection against the control plan puts a failed lot on hold, then labels print in the VDA or AIAG layout the customer asks for and ship notice leaves. A held lot cannot ship.

  6. 6. Complaints and returns

    A complaint opens against the lot. Containment, root cause and corrective action are written into an 8D reply, and returnable boxes are reconciled with the customer plant afterwards.

Roles and responsibility boundaries.

For production planners

Compare each new release with the last, then plan presses, dies and coil for only the lines that changed, so Monday starts with a real sequence.

For press and machine operators

See the current revision beside the press, and enter heat, shift and first-off details at the machine without walking back to the quality office. No paper travels.

For the quality lab

Record CMM and gauge results against the control plan, place holds on suspect lots, and prepare the PPAP package for each new part before the customer asks.

For stores and dispatch

Pick lots against a release, print labels and shipping notices, and book crates in and out at the dock.

For account managers

Follow releases, open complaints and deliveries for each customer plant. One screen.

Reports your managers need.

  • Release changes by customer plant and part
  • Lots by inspection result and die
  • Parts shipped against each release
  • Plating and heat treatment returns, short and rejected
  • Crates and racks held by customer plant
  • Complaints by part and root cause

Connections to scope

  • Email
  • Customer release files
  • Label printer
  • Barcode scanner
  • Accounting export

Confirm data access, record ownership and the exchange method for each connection. Inclusion here does not mean every connection is available in a standard package.

Setup decisions and adoption risks.

Use these requirements to plan phases, data migration and user training. Agree the release sequence after reviewing your current systems.

Part structure

Revisions, die lists, control plans and label formats are set up for the customers you serve, beginning with your two busiest accounts.

Inspection plans

Sampling points, characteristics and limits follow the plans your own quality engineers write, down to gauge number and frequency.

Release formats

Import layouts are built for the electronic call-off files, portal downloads and spreadsheets your customers actually send, one customer at a time until each loads cleanly.

Opening records

Open releases, finished stock and earlier lot history are imported from your existing sheets, then checked by planner and lab before the first live release.

Currency and tax

Plants sit in different countries, so currency, tax lines and Incoterms are set on each customer account.

Limitations to settle before implementation

  • A small workshop making one-off repairs for local garages, with no scheduled call-offs to plan against, does not need release planning.
  • Aftermarket retailers need stock and billing.

Modules to consider first.

These functions connect to the operating model above. Confirm each one against the work your business actually runs.

Choose the operation you want to improve.

Use these activities to explain your scope. Your business does not need every function in the directory.

  • Engine and drivetrain components
  • Braking system parts
  • Suspension and steering parts
  • Electrical and wiring components
  • Body and sheet metal parts
  • Filters and consumables
  • Bearings and fasteners
  • Two-wheeler specific parts
  • Export-grade OEM components
Talk to us

Start with the problem your team can describe.

Bring a sample record and show where information is copied, missed or waiting for approval. Scope the first useful change from there.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements