Skip to main content
GullySystem
Manufacturing

Business solutions for Blow moulding companies

Explore software for work such as “Stock bottle sales to small and new brands”. Review each business function below, including when it fits and what to check before implementation.

Blow moulding companies

How the business operates.

Hollow containers hide faults. Thin walls are the usual culprit. A bottle with a thin shoulder looks fine on the line and then splits in a filler’s warehouse, weeks after the shift that made it ended. The record that explains it, such as parison programme, resin lot or cooling time, is rarely near the pallet.

Container design register

Hold each bottle or drum with its volume, neck finish, target weight, mould and the allowed wall thickness range, so a setter knows the limits before the first shot.

Machine set-up sheets

Store parison programme, blow pressure, cooling time and cycle for each mould and machine pairing, and show which setting was used on every run.

Resin, preform and masterbatch stock

Track granule lots, bought-in preforms and colour masterbatch. The regrind ratio is noted per run.

Weight and wall checks

Log container weight, wall thickness at set points, leak tests and drop tests by cavity, with limits taken from the customer’s specification.

Mould and cavity record

Keep the mould list. Each entry shows cavities, cleaning dates and repairs such as vent or pinch-off work.

Pallet and dispatch

Record cartons per layer, layers per pallet, labels and delivery notes, tied back to the run and the resin lot.

Regrind and scrap log

Planners see the regrind share against the limit for each container. Over-limit mixes are blocked.

Colour approval record

Masterbatch shade, dosing ratio and the customer’s approved colour chip are held for each container. Operators check a fresh batch against the chip at start-up. Shade drift is recorded.

Leak and top-load test log

Sample containers from each run are filled, capped and checked for leaks, drop impact and top load. Results are stored with the machine and mould used, and quality leads release pallets. Failed samples hold the pallet.

Downtime reasons by machine

Stoppages on each blow machine are logged with start, finish and a reason, such as mould change, chiller fault or parison drop. Planners see which machine loses the longest time. Patterns appear fast.

The records that hold the operation together.

  • Container quotations. Price a bottle, jerry can or drum from shot weight, cavities, cycle rate, and resin and masterbatch cost, then keep every revision beside the accepted price. Lost quotes stay searchable.
  • Container design register. Store volume, neck finish, target weight, allowed wall range, handle style, mould number and test requirements for each design, together with the customer’s drawing revision. Old revisions remain readable.
  • Machine set-up sheets. Keep parison programme, blow pressure, cooling time and cycle target for every mould and machine pairing, so a setter sees which settings a run really used. Good days become repeatable.
  • Resin, preform and masterbatch stock. Receive HDPE and PET granule lots, bought-in preforms and colour masterbatch, then draw them down against runs, with a low-colour warning raised before the hopper is loaded. Shortfalls show before start-up.
  • Regrind control. Weigh pinch-off flash into the granulator, book it as regrind stock, and set the allowed ratio per container so each run notes what was blended back. Virgin and regrind stay separate.
  • Weight and wall checks. Log bottle weight and wall thickness at set points through the shift, by cavity, with limits drawn from the customer’s specification and shown against each reading. Weight drift shows early.
  • Leak, drop and top-load tests. Enter leak, drop and top-load results with the sample’s cavity and run, so a failure holds the lot and lists blow pressure, cooling time and resin lot behind it. Causes surface in one view.
  • Mould and cavity record. List each mould with its cavities, cleaning dates and repairs such as vent clearing, pinch-off blade regrinding or neck insert replacement, and flag the next planned service. Tired tools get pulled.

Operational bottlenecks to check

Weight and wall thickness drift unseen

Weight is checked on paper at the machine, once an hour at best. The sheet goes into a folder nobody opens until a customer complains about a thin shoulder. No record shows how bottle weight moved over the shift.

Flash regrind is blended blindly

Pinch-off trim goes into the grinder and then into the next hopper, and no run carries its blend ratio. A later complaint has nothing to hold on to.

Preform and resin stocks are separate

PET preforms, HDPE granules and colour masterbatch are counted in different books. A missing blue masterbatch turns up late, after the mould is fitted, the heaters are hot, the setter is idle and the filler’s truck is booked.

Test failures lose their context

A drop or leak test fails, and the result sits on a bench sheet with no link to the cavity, the parison programme or the resin lot. Nobody can say why. The next shift repeats it.

Pallet counts disagree at the gate

Cartons per layer and layers per pallet are agreed by phone. The pallet at the dock rarely matches the paperwork, so the filler recounts bottles as the truck unloads.

Follow the work across teams.

This is a planning flow. Confirm the steps, owners and approval rules against your actual operation.

  1. 1. Specification

    The filler sends volume, neck finish, target weight, handle style and drop-test requirements, which are saved as a container design linked to the customer and to the drawing revision. Nothing is retyped later.

  2. 2. Quotation and mould

    A quote is built from container weight, cavities per mould, cycles per hour, and resin and masterbatch cost, while a new mould gets design sign-off and a trial record. Revisions stay on file.

  3. 3. Planning

    The planner matches the mould to an extrusion blow or stretch blow machine, then checks that resin, preforms, masterbatch and carton stock cover the run before the setter arrives. Shortages show up early.

  4. 4. Production

    The setter loads the stored parison or reheat settings, operators log counts, weights and wall readings by cavity, and pinch-off trim goes to the granulator with its weight noted. Every shot is accounted for.

  5. 5. Testing

    Leak, drop and top-load tests are taken by cavity at set intervals, and a failed sample holds the run until a supervisor releases or scraps it. The hold is automatic.

  6. 6. Packing and delivery

    Containers are cartoned or bagged onto pallets in the layer pattern the filler asked for, and the delivery note and label name the run and the resin lot. Stacking follows the account.

Roles and responsibility boundaries.

For owners

See machine output, rejects by container and customer, regrind use, and stock of resin and masterbatch without ringing the shift lead from home. The numbers are already there.

For production planners

Pick the next mould for each extrusion blow or stretch blow machine, line up colour changes from light to dark, and match the order book to machine hours. Changeovers are sequenced sensibly.

For setters and operators

Load stored settings, log counts and weights at the machine, and weigh trimmed flash into regrind before the granulator hopper fills again. No clipboard is needed.

For quality staff

Take samples by cavity, run leak, drop and top-load tests, and hold or release a lot with the burst evidence, wall readings and resin lot in one place. Search through folders ends.

For dispatch

Build pallets to each filler’s pattern, print labels carrying the run and resin lot, and issue delivery notes that match what is stacked on the dock. Short pallets get caught.

Reports your managers need.

  • Bottle weight trend by cavity and shift
  • Rejects by defect such as thin shoulder, pinhole or flash, by mould and resin lot
  • Regrind used against virgin resin by container
  • Leak and drop test results by customer and cavity
  • Resin, preform and masterbatch stock against open runs
  • Machine output against mould cycle target
  • Pallets dispatched by filler with run references

Connections to scope

  • Tablet entry at the machine
  • Email
  • WhatsApp
  • Barcode label printer
  • Accounting export

Confirm data access, record ownership and the exchange method for each connection. Inclusion here does not mean every connection is available in a standard package.

Setup decisions and adoption risks.

Use these requirements to plan phases, data migration and user training. Agree the release sequence after reviewing your current systems.

Your containers and moulds

Container designs, mould lists and machine specifications go in as your shop names them, including the nicknames operators use for old moulds. No one has to relearn names.

Test plans

Weight limits, wall-thickness points and the leak, drop or top-load method come from each filler’s specification, and your quality lead confirms them before the first run. Samples follow your plan.

Colour and resin rules

Masterbatch letdown ratios, allowed regrind share and approved resin grades are set per container, so a run records any blend outside what the filler accepted. Limits follow the account.

Pallet and label formats

Each filler’s stacking pattern, slip sheet rule and label wording are saved against their account, then applied whenever dispatch builds a pallet for them. Dock staff stop guessing.

Hosted by GullySystem

Our servers run the system, so planners, testers and the dispatch bay all open the same records. Need a container or resin record altered? Tell us and we change it.

Limitations to settle before implementation

  • A small shop that blows a single jerry can for one customer on one machine can manage with a weight sheet, a mould list and a pallet list.
  • Companies whose main product is moulded solid parts or extruded profiles will find Injection Moulding Company Management Software or Plastic Extrusion Company Management Software closer.

Modules to consider first.

These functions connect to the operating model above. Confirm each one against the work your business actually runs.

Choose the operation you want to improve.

Use these activities to explain your scope. Your business does not need every function in the directory.

  • Stock bottle sales to small and new brands
  • Custom mould projects for mid-sized packers
  • Lubricant and edible oil pack supply
  • Agrochemical bottle supply before the sowing season
  • Pharma and nutraceutical container supply
  • Contract moulding for brands that own their moulds
  • Export packaging enquiries
Talk to us

Start with the problem your team can describe.

Bring a sample record and show where information is copied, missed or waiting for approval. Scope the first useful change from there.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements