Skip to main content
GullySystem
Manufacturing

Business solutions for Conveyor manufacturers

Explore software for work such as “Belt and roller conveyors”. Review each business function below, including when it fits and what to check before implementation.

Conveyor manufacturers

How the business operates.

A conveyor is rarely one machine. It is a run of frames, rollers, belts, drives and guards that must meet on a customer’s floor at the right height. Errors show up only when the last section is bolted. By then it is expensive.

Site survey and layout quotation

Take the survey dimensions, product and duty into the record, then price the run, its drive, guards and controls, using the rates your estimator already uses.

Section drawings and numbering

Split each layout into numbered sections with parts lists, so the workshop and the crew work from one list.

Belt, roller and idler stock

Receive belts, rollers, pulleys and bearings by size, and issue them to the project that cut them.

Fabrication and trial fit

Track each section through cutting, welding, painting and a trial fit, with remarks noted before dispatch.

Erection and commissioning

Plan crews, record changes made on site, and close the job with a commissioning run and customer sign-off.

Spares and belt changes

Keep the as-built layout so a belt, motor or roller can be quoted from the line that was actually installed.

Drive and gearbox selection

Record belt speed, load per metre and incline, then choose motor power and gearbox ratio from the sheet your engineer uses. The choice is saved on the section. Spares then match.

Bought-out parts ordering

Raise orders for motors, gearboxes, bearings and sensors from the section parts lists. Delivery dates are kept against the project. A late motor shows before the frame is ready for it.

Stage billing for projects

Set billing stages such as advance, material ready, dispatch and commissioning against the order. Each invoice follows the stage reached. Part payments are tracked against the order balance.

Warranty and breakdown calls

Log a customer’s breakdown call against the installed line, with the fault, the engineer sent and the part changed. Warranty repairs are marked. Repeat faults on one conveyor become visible.

The records that hold the operation together.

  • Enquiries and duty capture. Log each enquiry with product, belt speed, incline and route, and keep the photographs and sketches sent by the buyer beside the duty details so nothing is asked twice.
  • Site survey records. Enter dimensions, column positions, floor openings and elevation marks from the visit, and attach them to the project and quotation so the drawing office redraws nothing from paper. Numbers travel.
  • Layout quotations. Price runs from your tables for belt width, roller diameter, drive and guards, and keep every revision shown to the buyer so the final price can be traced back.
  • Section drawings and numbering. Release numbered section drawings and parts lists under a revision letter, so the workshop and the crew work from the same list. Old sheets are retired.
  • Belt, roller and idler stock. Receive belts, rollers, snub pulleys, idlers and plummer blocks by size, and issue them to the project that needs them, so the stores shelf matches the count.
  • Fabrication and trial fit. Move each section through cutting, welding, painting and a yard trial fit, with remarks recorded before dispatch and the welder’s or fitter’s name against every stage.
  • Loading lists. Print a loading order from the section numbers, so the first section needed on site is the last one on the truck and nothing is unloaded twice. Cranes wait less.
  • Erection crews and changes. Assign crews to the site, record every change made on the floor, and update the as-built layout with it, so the drawing matches the conveyor that runs.

Operational bottlenecks to check

The site survey is separate from the quote

Dimensions are taken on a pad and typed later. A frame is cut to a length that was misread. It is scrapped.

Sections are not numbered against the layout

Frames leave the workshop without a clear order. On site the crew spends a morning sorting what goes where.

Belt and roller stock is guessed

Belt widths, roller diameters and idler spacing vary by job. Purchases are repeated because nobody knows what is on the rack.

Factory trial fit is not recorded

A run is assembled in the yard, then taken apart. Fit errors found there are fixed but never written down.

Erection changes never reach the drawing

The crew shortens a section, adds a support or moves a drive. The as-built layout stays as drawn, and spares follow the wrong sizes.

Follow the work across teams.

This is a planning flow. Confirm the steps, owners and approval rules against your actual operation.

  1. 1. Enquiry and survey

    The enquiry records product, duty and route. A survey visit is booked and its dimensions are entered as measured.

  2. 2. Layout and quotation

    A layout is drawn and priced, with troughed or flat belt, roller type, geared motor, guards and pull-cord switches, and every revision is kept for the buyer. Nothing is overwritten.

  3. 3. Order and section release

    A confirmed order opens a project, and numbered section drawings and parts lists are released to the workshop under a revision letter. The crew reads the same list.

  4. 4. Fabrication and trial fit

    Frames are cut, welded and painted, then trial fitted in the yard. Remarks are logged before dispatch.

  5. 5. Loading and erection

    Sections are loaded in reverse erection order, and the crew fits them from the head end while noting every change made on site. Nothing is lost.

  6. 6. Handover and spares

    The conveyor is run and signed off, and the as-built layout is saved so that belt, idler and drive orders can be quoted from it years later. History stays.

Roles and responsibility boundaries.

For sales engineers

Log enquiries, enter survey details and price runs from your rate list.

For the drawing office

Split a layout into numbered sections and release revisions that the workshop and crew can both see, with the superseded sheet withdrawn the moment a new letter is issued.

For workshop leads

See sections at each stage, plate and tube issued to them, and what is due for a yard trial fit, without walking the bays to count frames.

For erection supervisors

Open the loading list, record changes made on site and close the commissioning run with the customer, all from a phone or tablet. Nothing waits for the office.

For service and spares staff

Look up the as-built line, quote the right belt or idler, and book the repair visit, without calling the erection supervisor to ask what was changed on site.

Reports your managers need.

  • Projects in build by stage
  • Sections fabricated, fitted and loaded, by project
  • Belt, roller and idler issues against each run
  • Quotations won, lost and open, by conveyor type
  • Erection crews by site, with change notes
  • Test runs awaiting sign-off
  • Spares quoted for each line, by age

Connections to scope

  • Email
  • WhatsApp
  • SMS
  • Accounting export
  • Drawing file links

Confirm data access, record ownership and the exchange method for each connection. Inclusion here does not mean every connection is available in a standard package.

Setup decisions and adoption risks.

Use these requirements to plan phases, data migration and user training. Agree the release sequence after reviewing your current systems.

Rate lists and standard runs

Belt, roller, drive and guard rates, and your common standard runs, are loaded the way your estimator prices them, so a repeat layout is quoted from current figures.

Section templates

Section numbers and loading orders follow the habits of your drawing office and your erection crews.

Commissioning checklists

Your safety staff decide the drive, guard and trip-wire checks that go on the checklist.

Records migrated

Projects still open, their drawings, customers and spares history are brought in from what you hold now, and the service desk checks the first batch before it goes live.

Messages and documents

Loading lists, quotations and handover reports travel by email, while crews and customers get quick updates on WhatsApp or similar. Messages attach to the project.

Hosted by GullySystem

The survey team, the workshop and the erection crews open one project record, kept on a server GullySystem manages, so nobody emails a drawing to a site.

Limitations to settle before implementation

  • A trader that only resells belts and rollers needs a wholesale ordering tool, not this one.
  • A steel fabricator with no conveyor work can use Manufacturing Production Management Software.

Choose the operation you want to improve.

Use these activities to explain your scope. Your business does not need every function in the directory.

  • Belt and roller conveyors
  • Stainless steel hygienic conveyors
  • Sorting lines for parcel and e-commerce hubs
  • Bulk handling screw and bucket conveyors
  • Inclined and curved sections
  • Site survey and layout drawing
  • Installation and commissioning
  • Belt, roller and motor spares
  • Annual maintenance of installed lines
Talk to us

Start with the problem your team can describe.

Bring a sample record and show where information is copied, missed or waiting for approval. Scope the first useful change from there.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements