Skip to main content
GullySystem
Real estate and construction

Business solutions for HVAC contractors

Explore software for work such as “Contact with MEP consultants and architects”. Review each business function below, including when it fits and what to check before implementation.

HVAC contractors

How the business operates.

The installation is one payment. The AMC is years of them, plus gas top-ups and a compressor that fails in its seventh summer. That second half is where records fall apart.

Installed unit register

List each indoor and outdoor unit by site, brand, model, serial, tonnage and warranty end date, whether it is a split, cassette, ducted, VRF or chiller.

AMC schedule

Plan preventive visits per contract, with the scope marked full-cover or labour only, and a checklist for filters, coils, gas pressure and current readings.

Breakdown call desk

Log calls against the unit, assign a technician, and close with a job sheet carrying the fault, the readings and the fix.

Refrigerant and spares issue

Issue gas cylinders, copper and spares from the store to each technician’s van, and charge them to the job when work falls outside the AMC.

Contract renewal reminders

List AMCs ending soon with visit history beside them, ready for a renewal quote, so nothing lapses while the team is still servicing.

Brand warranty claims

Record units still in warranty, the part replaced and the claim raised with the brand, with the credit noted when it comes back.

Site survey and heat load

Survey notes for each site record room sizes, ceiling heights, glass area and power points. The estimator turns them into a heat-load sheet and unit selection. The sheet stays with the job.

Commissioning and handover record

Pressure test, vacuum, gas charge and running amps are logged per unit at commissioning. The site engineer collects the customer’s signature. The record becomes the starting point for warranty and AMC.

Installation crew measurements

Piping, ducting and electrical crews are recorded with their site, work done and measured quantity. The project manager approves each measurement before payment. Crew payments match approved quantities.

Site material issues

Copper pipe, drain pipe and insulation sent to site are recorded as issued to that job. Leftovers returned are credited back. A project manager sees material used against the estimate.

The records that hold the operation together.

  • Customer sites and units. Keep each customer’s sites and the units at them. Every unit carries its model, capacity, serial number, installation date and service history, and outdoor and indoor units are paired, so a visit never starts from a guess.
  • Enquiries and quotations. Log installation and service enquiries. Prepare quotations for units, piping, drain lines, electrical points and labour, and keep every revision. The accepted version becomes the job without retyping a single line.
  • Installation jobs. Plan installation jobs by team and date, record units fitted and materials used, such as copper pipe, flare nuts, insulation and brackets. Close each job with a handover.
  • Breakdown call desk. Log complaints from phone, WhatsApp and the website. Allocate each to a technician and follow it to closure, and repeat faults on the same unit are flagged, so a third visit gets a senior technician’s eye.
  • Service contracts and visits. Set up annual contracts with the units covered. Schedule the visits, list renewals as the end date approaches, and keep full-cover and labour-only terms on each unit, so the technician knows what is chargeable before knocking.
  • Technician schedule and routes. Assign visits to technicians by area and day. The route for each person is planned before the morning, and a change in dispatch reaches the technician’s phone at once, without a call.
  • Job sheets and sign-off. Record the fault, the readings, the work done and the customer’s signature for every visit. Suction pressure, superheat, subcooling, current draw and temperature drop are fields rather than free text, so a weak unit shows up in the history before it fails.
  • Spare parts and gas stock. Track compressors, capacitors, contactors, PCBs, fan motors, thermostats, copper pipe and refrigerant gas by store and by technician vehicle. Cylinder weights are noted at each top-up. Gas used is reconciled against gas issued.

Operational bottlenecks to check

The last gas top-up is unknown

A customer reports poor cooling, and nobody can say when gas was last added, so it is charged again. The customer pays twice.

Preventive visits slip in summer

Breakdown calls take every technician, and quarterly visits slip a month without notice. The customer notices first.

Gas and spares go unbilled

Cylinders, capacitors and circuit boards used outside the AMC scope never become an invoice line. Margin walks away with them.

Expired contracts are still serviced

An AMC ends in March, and the team keeps servicing the site for free. Nobody checked the end date.

Follow the work across teams.

This is a planning flow. Confirm the steps, owners and approval rules against your actual operation.

  1. 1. Enquiry and quotation

    An enquiry for a new installation or a service contract is logged against the customer. A quotation lists the units, piping, stands, drain lines, electrical points and labour, with tonnage and brand named for each room.

  2. 2. Installation

    An accepted quotation becomes an installation job with a team and a date. Units installed are recorded against the site with serial numbers, and brazing checks, vacuum and leak test readings go on the handover sheet for the customer.

  3. 3. Contract and breakdown calls

    Contract visits are scheduled for each unit. A breakdown call is logged, allocated to a technician and tracked to closure, so no complaint sits unassigned overnight, and the coordinator’s calendar shows both kinds of visit side by side.

  4. 4. Visit and job sheet

    The technician records the fault, the readings, the work done, refrigerant gas added and parts fitted. The customer signs the job sheet on the phone before the technician leaves the site.

  5. 5. Billing

    A tax invoice is raised for chargeable work. Otherwise the visit is marked as covered by a contract or a warranty, and the parts used are still charged to the right account for the contract review.

  6. 6. Renewal and follow-up

    Contracts nearing their end and units due for service are listed, so customers can be contacted before the summer rush. Renewals are quoted from the same unit list, with the repairs of the year noted beside each unit.

Roles and responsibility boundaries.

For owners

See jobs done, contract renewals, parts used, unpaid invoices and the work in hand for each technician. Spot the sites that keep calling for the same fault, and decide whether to replace the unit or the contract.

For service coordinators

Log calls, allocate technicians, schedule contract visits and keep the day’s route for each person. Reassign a call in seconds when a van breaks down, a technician runs late or a customer reschedules.

For technicians

See your visits for the day, the units at each site and the fault history. Fill in the job sheet on a phone, with manifold gauge and megger readings and a photo of the nameplate, before you drive to the next site.

For store and accounts

Issue gas and parts to technicians, raise invoices, record payments and prepare warranty claims. Cylinder returns and part usage are matched against the job sheets at month end, so shortfalls are caught early.

Reports your managers need.

  • Visits completed by technician and by type, with the breakdown calls closed on first visit
  • Contract visits due and visits missed, by unit and by site
  • Contracts ending soon and renewals done
  • Spare parts and refrigerant gas used by job, technician and vehicle
  • Warranty claims raised, parts returned to the brand and credit pending
  • Unpaid invoices by customer

Connections to scope

  • WhatsApp
  • SMS
  • Email
  • Payment link and gateway
  • Accounting export
  • Barcode or label printer

Confirm data access, record ownership and the exchange method for each connection. Inclusion here does not mean every connection is available in a standard package.

Setup decisions and adoption risks.

Use these requirements to plan phases, data migration and user training. Agree the release sequence after reviewing your current systems.

Your unit types and checklists

Unit types, capacities, service checklists and the readings your technicians note are entered the way you work. Split, cassette, VRF, ducted and chiller checklists stay separate, each with its own condenser and airflow fields.

Contract terms

Visits per year, units covered and what a contract includes, such as gas top-up or coil wash, are set to match your own service agreements.

Customers and units migrated

Customer lists, sites, units and contract dates arrive from your current register or spreadsheet, and the coordinator checks serial numbers against a few sites before go-live.

Messages and payments

Visit reminders and renewal notices reach customers through WhatsApp, SMS or mail, and payment can be taken by a link or card. Templates carry your own wording. Nothing goes out unseen.

Hosting and changes

GullySystem hosts the system. It also handles any change to forms, checklists and invoice layouts, so a new unit type or a changed checklist never waits on the coordinator.

Limitations to settle before implementation

  • A single technician who repairs on phone calls only is likely to get by on a diary plus a receipt book, without contracts, units, stock or a coordinator to schedule anything.
  • Businesses that build whole buildings and need site billing by stage, with architects, bills of quantities and subcontractors, will find Construction Project Management Software fits that part better.

Modules to consider first.

These functions connect to the operating model above. Confirm each one against the work your business actually runs.

Choose the operation you want to improve.

Use these activities to explain your scope. Your business does not need every function in the directory.

  • Contact with MEP consultants and architects
  • Bill of quantities response routine
  • Reference sites a buyer can visit
  • Follow-up through purchase and approval
  • A record of retention and payment by client
Talk to us

Start with the problem your team can describe.

Bring a sample record and show where information is copied, missed or waiting for approval. Scope the first useful change from there.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements