Skip to main content
GullySystem
Manufacturing

Batch and Serial Tracking for Machine tool manufacturers

Trace goods using batch identifiers or individual serial numbers.

Manufacturing

Does this function belong in your operation?

Use when physical goods require lot history, expiry control or individual identification.

Traceable goods are received, produced or moved.

Gives each machine a serial and links it to its casting, spindle, ball screw and controller serials. A spindle failure traces to every machine carrying the same lot. Service history follows the serial.

Bring the records the workflow depends on.

  • Item tracking rules
  • Batch or serial identifiers
  • Movement and expiry records

Outputs to check

  • Lot or unit movement history
  • Trace-forward and trace-back report
  • Held or expiring stock list

Follow the batch and serial tracking workflow.

Use this sequence to compare your current process with the proposed module. Agree the owner, permission and exception at each step.

  1. 1. Set tracking rules

    Identify which items require lot, serial or expiry details.

  2. 2. Capture identity

    Record the required reference at receipt or production.

  3. 3. Carry it through movement

    Preserve identifiers during transfer, issue and supply.

  4. 4. Control held stock

    Apply the authorised inspection or restriction decision.

  5. 5. Trace an issue

    Find source and destination records for the affected lot or unit.

Who uses the module, and who approves?

Keep responsibilities distinct even when one person holds more than one role.

Storekeeper

Records the batch at goods receipt and issues the oldest one first.

Quality checker

Holds a batch, releases it, or marks it rejected, and the stock obeys.

Service desk

Types a serial number and sees the sale date, the warranty and every visit made since.

Owner

Asks one question after a complaint: who else received it.

Decide how exceptions are handled.

These business rules belong in configuration and testing. A normal transaction alone does not demonstrate that the workflow is ready.

Unknown batch at receipt

Hold the affected quantity until identification is resolved.

Duplicate serial number

Investigate the physical units and source entries before accepting another movement.

Batch put on hold

Prevent the agreed issues or sales and record the authority that later releases it.

Can this work independently?

Traceability requires identifiers on the physical goods and their recorded movements. It can run from controlled imports, but goods receipt, production, stock and sales must preserve the same references. A trace report cannot recover identifiers that were never captured at a handoff.

Systems and records it connects with

  • Goods receipt: Counted, accepted and rejected supplier-delivery quantities.
  • Stock: Item-location quantities and authorised stock movements.
  • Quality control: Inspection results and authorised hold or release decisions.
  • Invoice management: Issued invoice references, line amounts and outstanding balances.

Configure, test and introduce the workflow.

  • You tell us which items carry shelf life or serials. We write back how each will be numbered.
  • The storekeeper shows how goods arrive. You get a goods receipt screen to try, with a field for the supplier’s lot. Send current stock. A trial import comes back with gaps listed for the team to fill, using whatever batch details exist.
  • Counter and service staff practise. They issue by batch and look up a serial, and you get a trained group and a corrected import.

Check the result before rollout.

Apply these checks to a sample from the agreed workflow, then repeat with an exception. Keep the expected result beside the test record.

  • Tracked items cannot move without required identifiers.
  • Serial references do not duplicate active units.
  • A lot can be traced to its recorded recipients.
Machine tool manufacturers

How the business operates.

A lathe or machining centre is a long chain of small tolerances. A bed is machined, guideways are ground or scraped, a spindle is fitted, and every step either keeps or loses accuracy.

Model and option quotations

Quote by bed length, table size, spindle and controller from your own model list, with each revision kept.

Casting, bed and guideway records

Receive castings by pattern and heat, and record bed machining, grinding and scraping against the serial.

See the full industry workflow, reports and implementation plan →

The records that hold the operation together.

  • Enquiries and application capture. Log the parts to be machined, material, tolerance and batch size with each enquiry, and keep the part drawings sent by the buyer.
  • Quotations and option lists. Price machines from your tables for bed length, table size, spindle, turret or tool changer and controller, with every revision kept.
  • Drawing and bill of materials control for machine tools. Release machine drawings and parts lists with a revision letter, so assembly builds the version that was ordered.
  • Casting and bed machining. Receive castings by pattern and heat number and record stress relief, machining setups and fixtures for each bed.

Operational bottlenecks to check

Casting and bed history is lost

A bed is machined on a given date with a given fixture. An axis drifts later. The maker cannot trace what was done.

Spindle and screw serials are not tied to the machine

The supplier’s spindle cartridge number is on a delivery paper. The machine nameplate carries something else.

How work flows across this business

This module sits within a wider operating process. Use the sequence to identify the other teams and records affected by a change.

  1. 1. Enquiry and application

    The enquiry records parts, material, tolerance and batch. A model and options are shortlisted.

  2. 2. Quotation

    The machine, accessories, installation and training are priced from your tables. Revisions are kept.

  3. 3. Order and drawing release

    A confirmed order opens a serial. Drawings and parts lists are released with a revision letter.

  4. 4. Machining and assembly

    Castings are machined, ways are ground and scraped, and the spindle, screws and guides are fitted.

  5. 5. Run-in and accuracy test

    The spindle is run in and the machine is tested. Readings are saved against the serial.

  6. 6. Installation, training and spares

    The machine is crated, installed and handed over. Operators are trained, and spares orders open from the record.

Industry reports to connect with

  • Machines in build, by stage and model
  • Castings received and machined by pattern
  • Spindles and screws issued by serial
  • Accuracy tests done, passed and awaiting

Questions before implementation.

When should machine tool manufacturers consider batch and serial tracking?

Use when physical goods require lot history, expiry control or individual identification. Traceable goods are received, produced or moved.

What should we bring to the requirements discussion?

Bring anonymised examples of Item tracking rules; Batch or serial identifiers; Movement and expiry records. Show who creates, checks and changes each record. Use only records from an activity that meets the suitability conditions above.

Does this replace our existing business software?

The starting point is your current system and the gap you need to close. Trace goods using batch identifiers or individual serial numbers. Configuration, a connected module or a custom build are evaluated against that gap before a replacement is proposed.

What is outside this module?

Traceability does not replace product testing, recall decisions or regulatory obligations.

How are scope, price and rollout decided?

The proposal follows a review of your records, user roles, branches and existing software. Data migration, connections, training and support are scoped separately where needed. Tracked items cannot move without required identifiers. Use this check when reviewing the first working version.

Talk to us

Discuss batch and serial tracking for your business.

Tell us which workflow needs attention and which systems your team uses. The next step is a requirements discussion and a written scope.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements