Skip to main content
GullySystem
Real estate and construction

Business solutions for Modular kitchen companies

Explore software for work such as “L-shaped and parallel kitchens for new apartments”. Review each business function below, including when it fits and what to check before implementation.

Modular kitchen companies

How the business operates.

A kitchen is built to millimetres and changed on a phone call on a Sunday. A new extractor model, or a sink moved by two hundred millimetres, can undo a cutting list that is already on the panel saw.

Measurement and site points

Record walls, windows, and the plumbing, gas and power points with photos before the design begins, since a gas point cannot move once the tiles are on.

Design revisions and approval

Keep each revision with its own quote, and record the customer’s approval against the final one.

Module and running feet quotation

Price by cabinet, carcass board, shutter finish, hardware, countertop and appliance, module-wise or per running foot. Particle board, HDF board, marine ply, laminate, acrylic and PU finishes each carry your own rate, so a change produces a new quote version.

Production order

Turn the approved revision’s units into a work order with cutting, edge-banding and hardware for your own factory or your partner’s. Hardware carries over from the quote.

Installation schedule and snag list

Track site readiness, the installation visit, countertop fixing and every snag through to handover and the last payment. Each snag closes with a name.

Countertop and appliance supplier orders

The coordinator records stone, quartz or steel countertop templates and orders for hob, chimney and sink against each kitchen. Supplier delivery dates sit on one list. Installers see gaps first.

Showroom visit and design appointment log

Each homeowner visiting the studio is noted with the designer who met them and the budget range discussed. Follow-up dates are set. Walk-ins who have not returned appear on the designer’s list.

Warranty and after-sales service requests

A homeowner reports a loose hinge or a swollen shutter after handover. The request records the kitchen, the fault photo and the visit booked. Cost covered under warranty is marked.

Handover checklist and sign-off

The site supervisor ticks cabinets aligned, soft-close tested, gas and water points working and the clean-up done. The customer signs on a phone. Remaining snags carry a date.

Showroom display and sample register

Display kitchens, finish samples and catalogues are listed with location and condition. Outdated shutter samples are retired. Designers know which finish can be shown to a visitor today.

The records that hold the operation together.

  • Showroom enquiries and site visits. Record each client, the flat or site, the kitchen shape discussed, who referred them, and the measurement visit booked.
  • Site measurement sheets. Hold wall lengths, ceiling height, beam drops, window sills, door positions and existing gas, water and drain points for every kitchen measured.
  • Design drawings and revisions. Keep each layout version, the renders shown to the client and the change asked for, so the approved revision is clear. Nothing is overwritten.
  • Carcass board and shutter finish selection. Set the board grade and the shutter finish for each unit, from your own list of plywood, MDF, HDF, laminate, acrylic and paint options.
  • Hardware and accessory selection. Record hinges, channels, tandem drawer systems, baskets, corner carousels, lift-ups, handleless profiles and handles against the unit they belong to. Each unit then carries its own bill of materials, tall and gable panels included, into the quote and the job card.
  • Quotations by unit and running feet. Price each base, wall, tall and loft unit with its finish and hardware, handleless profile or handle. Add the countertop, hood, hob and sink, so the scope of work on the quote is plain. Rates sit per running foot, per square foot or per unit, and every quote version is kept.
  • Approval, advance and work order. Mark the revision the client accepted, record the advance taken and open the work order the factory will build from. Later changes are added as variations.
  • Production job cards. Follow cutting, edge banding, drilling, assembly and packing for each unit, with the worker or machine noted at every stage, from the panel saw to the CNC boring machine.

Operational bottlenecks to check

The factory makes the old revision

The tall unit changes, the factory has the earlier file, and a full carcass is wasted. The remake takes weeks.

Site points move during civil work

The gas point and the sink outlet are not where the drawing says, and the modules do not fit. Changes follow on site.

Hardware and board upgrades are billed late

The customer moves from particle board to marine ply, or to soft-close baskets, after the quote. The bill goes out at the old figure and the difference is absorbed.

Running feet and module pricing disagree

One designer quotes by running feet and another module-wise, so the same kitchen carries two prices. The customer compares them with a competitor.

Installation waits on other trades

The countertop is ready but the plumber has not come, and a crew of three goes home unpaid for the day.

Follow the work across teams.

This is a planning flow. Confirm the steps, owners and approval rules against your actual operation.

  1. 1. Enquiry

    A client walks into the showroom, calls, or comes through an architect. The flat, the kitchen shape and the budget range discussed are noted against the enquiry.

  2. 2. Site measurement

    A measurer visits the flat and records wall lengths, ceiling height, beam drops, window and door positions, and any wall that is out of plumb at the corner. Existing electrical, water, gas and drain points are marked on the same sheet.

  3. 3. Design and selection

    The layout is drawn and the kitchen is broken into base, wall, tall and loft units. Carcass board, shutter finish, handles and hardware are chosen unit by unit with the client.

  4. 4. Quotation and approval

    Each unit is priced with its finish and hardware, and appliances, hob and countertop are added. The client signs off a drawing revision and pays the advance.

  5. 5. Production and purchase

    The approved drawing becomes a cutting list and assembly job for the factory or the panel supplier, with offcuts from the beam saw reserved for fillers and shelves. Boards, hardware, countertop and appliances are ordered against the project.

  6. 6. Installation and handover

    Carcasses are levelled, shutters aligned and the countertop, hood and sink fitted. Snags are listed and cleared. The balance is billed and hardware warranty is recorded.

Roles and responsibility boundaries.

For owners

See every kitchen by stage, designs waiting on the client, factory load, board and hardware purchase commitments and the balance due from each project, in one list.

For designers

Work from the measurement sheet, draw revisions, fix finishes, larder pull-outs and hardware unit by unit and build the quotation from them.

For the measurement and site team

See the visits booked for the day, enter measurements, duct openings and service points, and report whether the walls are plumb and the site is ready for fitting.

For factory and store staff

Read the cutting list and job card for each unit, mark stages done, receive boards, tandem boxes and carousels and watch what is short.

For accounts staff

Raise stage invoices, record payments against the project, post supplier bills and pull the figures the accountant asks for.

Reports your managers need.

  • Enquiries by source and how far each reached
  • Kitchens by stage, from measurement to handover
  • Design revisions and approval dates per project
  • Quotations given, approved and closed without an order
  • Boards, hardware, countertop and hob used against each project
  • Installation visits by fitting team and week
  • Stage payments received and balance outstanding, with the cornice and backsplash extras listed apart

Connections to scope

  • WhatsApp
  • SMS
  • Email
  • Payment link and gateway
  • Accounting export
  • Barcode or label printer

Confirm data access, record ownership and the exchange method for each connection. Inclusion here does not mean every connection is available in a standard package.

Setup decisions and adoption risks.

Use these requirements to plan phases, data migration and user training. Agree the release sequence after reviewing your current systems.

Your unit list and rates

Base, wall, tall and loft units, their sizes and your rates per running foot, per square foot or per unit go in as you quote them today.

Your board, finish and hardware lists

Plywood and MDF grades, laminate and acrylic ranges, paint finishes, hinge and channel brands and basket sizes follow the lists your showroom works from.

Own factory or outsourced panels

Job cards can run through your own cutting and assembly stages, or stop at a cutting list sent to a panel supplier.

Measurement and drawing formats

The fields on the measurement sheet, and where renders and drawing files are stored, match how your designers already work.

Payment stages and site rules

The billing stages and the conditions for site readiness are settled with you at setup.

Hosting across showrooms

GullySystem runs the hosting, so each showroom shares one client list and the same view of factory load. Our staff update rates and hardware lists on request.

Limitations to settle before implementation

  • A carpenter making site-built kitchens with no unit list or factory may find a measurement book enough.
  • A studio taking whole-home interiors will find Interior Design Management System a closer fit.
  • A shop selling finished furniture off the display floor should look at Furniture Showroom Management Software.

Modules to consider first.

These functions connect to the operating model above. Confirm each one against the work your business actually runs.

Choose the operation you want to improve.

Use these activities to explain your scope. Your business does not need every function in the directory.

  • L-shaped and parallel kitchens for new apartments
  • Island and open kitchens for villas
  • Kitchen renovation for older homes
  • Wardrobes and storage alongside the kitchen
  • Full home interiors packages after possession
  • Tall units, pantry pull-outs and accessories upgrades
  • Chimney, hob and built-in appliance packages
  • Commercial and cloud kitchen fit-outs
Talk to us

Start with the problem your team can describe.

Bring a sample record and show where information is copied, missed or waiting for approval. Scope the first useful change from there.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements