The planner sequences pipe, profile and sheet runs by die, colour and diameter to cut changeover time. Lines waiting for a die from the tool store are visible. Urgent orders slot in without hiding delays.
Bring the records the workflow depends on.
- Demand and due dates
- Material availability
- Production capacity and calendars
Outputs to check
- Demand-linked production schedule
- Material and capacity exception list
- Released-work requirement record
Follow the production planning workflow.
Use this sequence to compare your current process with the proposed module. Agree the owner, permission and exception at each step.
Who uses the module, and who approves?
Keep responsibilities distinct even when one person holds more than one role.
Decide how exceptions are handled.
These business rules belong in configuration and testing. A normal transaction alone does not demonstrate that the workflow is ready.
Can this work independently?
Planning needs demand, material definitions and capacity assumptions. These can be entered independently, but order, stock and work-order links keep the plan aligned with actuals. Releasing a plan does not issue material or record completed output; those execution steps need their own records.
Systems and records it connects with
- Bill of materials: Approved component quantities and production-definition versions.
- Work orders: Released production jobs, material issues and output records.
- Stock: Item-location quantities and authorised stock movements.
- Purchase orders: Authorised supplier commitments and open line balances.
Configure, test and introduce the workflow.
- Walk us through machines, ovens or lines and the shifts they run. A written map of capacity comes back.
- Tell us which items repeat daily. A set of standing quantities is returned for approval. Sales orders and stock arrive from your existing records. A trial plan appears for a sample day.
- Overlap for a while. The floor uses the screen while the whiteboard stays up, and differences are noted.
Check the result before rollout.
Apply these checks to a sample from the agreed workflow, then repeat with an exception. Keep the expected result beside the test record.
- Planned quantities reconcile with demand.
- Shortages are visible before release.
- Capacity assumptions are recorded.
How the business operates.
An extrusion line rarely stops. The die, haul-off and cutter are set once, and then metres pour through the sizing sleeve and spray tank for hours while nobody touches a dial. Thin walls pile up as scrap before anyone looks.
The records that hold the operation together.
- Extrusion quotations. Price pipe, profile or sheet from weight per metre, screw output, resin and masterbatch cost and cut-to-length sawing, and keep every revision beside the accepted figure.
- Section and die register. Hold each section’s wall, outside diameter, tolerance and die, with weight per metre and the cut lengths each buyer orders. A 32 mm conduit and a 110 mm drain pipe each keep their own sheet.
- Line run log. Record screw speed, barrel zone temperatures, melt pressure, haul-off speed and metres per run, then set kilograms per hour against the quoted rate.
- Compound recipes and stock. Store each blend of resin, stabiliser, filler and colour, receive lots with their test certificates, and draw them down against runs. Low stock is flagged per line.
Operational bottlenecks to check
Start-up scrap is never costed
Each colour change and die change burns compound before the first good metre leaves the saw. Purge, die-lip drool and trimmed ends go to the regrind bin unweighed. So the yield you quoted and the yield you achieved drift apart, and the loss slides quietly into the next job’s price.
Dimensions are measured and then lost
Wall thickness, outside diameter and ovality are read at the tank and noted on a clipboard, and the sheet is filed by date, not by order. When a buyer queries one bundle three weeks later, nobody can find the readings taken at that hour.
How work flows across this business
This module sits within a wider operating process. Use the sequence to identify the other teams and records affected by a change.
1. Enquiry and quotation
The enquiry names a pipe size and pressure class, a profile section or a sheet gauge, with the cut length and metres wanted. The quote uses weight per metre, line output and compound cost, and every revision is kept.
2. Die and trial
The die comes from the tool store or is made new. A start-up trial records zone temperatures, scrap and measured wall before the run is cleared for the buyer.
3. Line planning
The planner picks a line by size range and screw output, places colour changes so the lightest shade runs first, and checks resin, masterbatch and regrind for the whole run.
4. Running
The operator logs barrel temperatures, screw speed, haul-off speed and metres, with wall and diameter checks entered as the pipe leaves the sizing tank. Trim goes to the grinder.
5. Cutting and bundling
Lengths are cut at the planetary saw to order and counted into bundles. Tags print section, length, count and order number.
6. Dispatch
The delivery note lists bundles and metres, and the invoice follows from it. The die goes back to the tool store with its new metre count and a note on its condition.
Industry reports to connect with
- Line output in kilograms per hour against the quoted rate
- Scrap and purge by cause, line and colour
- Compound, masterbatch and regrind consumed per order
- Dies ranked by metres since polishing
Questions before implementation.
When should plastic extrusion companies consider production planning?
Use when the business manufactures, assembles or prepares physical products. Confirmed demand needs a production schedule.
What should we bring to the requirements discussion?
Bring anonymised examples of Demand and due dates; Material availability; Production capacity and calendars. Show who creates, checks and changes each record. Use only records from an activity that meets the suitability conditions above.
Does this replace our existing business software?
The starting point is your current system and the gap you need to close. Plan manufacturing quantities against demand, materials and capacity. Configuration, a connected module or a custom build are evaluated against that gap before a replacement is proposed.
What is outside this module?
Production output depends on actual materials, equipment and execution. The plan records assumptions and revised decisions as those conditions change.
How are scope, price and rollout decided?
The proposal follows a review of your records, user roles, branches and existing software. Data migration, connections, training and support are scoped separately where needed. Planned quantities reconcile with demand. Use this check when reviewing the first working version.
Related functions for plastic extrusion companies.
Discuss production planning for your business.
Tell us which workflow needs attention and which systems your team uses. The next step is a requirements discussion and a written scope.
What happens after you share your requirements
- We review your brief and the systems you already use.
- We clarify the workflow, missing information and the work to consider first.
- The proposed scope sets out the deliverables, responsibilities and dependencies.
- Review the scope and commercial terms before deciding whether to proceed.
Start with your requirements
Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.
Share your requirements