Skip to main content
GullySystem
Manufacturing

Business solutions for Plastic extrusion companies

Explore software for work such as “Pipe and conduit supply to plumbing and electrical dealers”. Review each business function below, including when it fits and what to check before implementation.

Plastic extrusion companies

How the business operates.

An extrusion line rarely stops. The die, haul-off and cutter are set once, and then metres pour through the sizing sleeve and spray tank for hours while nobody touches a dial. Thin walls pile up as scrap before anyone looks.

Profile and pipe register

Store each pipe or profile with its die number, nominal diameter, SDR (the ratio of diameter to wall), tolerance band and ordered cut lengths. A repeat order starts from known figures.

Line run log

Capture screw speed, barrel zone temperatures, melt pressure, haul-off speed, kilograms per hour and metres produced for each run on each line, with the operator’s name on the shift.

Compound and additive stock

Track compound lots, titanium dioxide, stabiliser, colour masterbatch and regrind, and note the recipe each run drew from the hopper, so a complaint traces back to a bag.

Dimensional checks

Record wall, outside diameter, ovality and surface checks taken during the run, and hold bundles that fall outside the buyer’s limits until someone decides what to do.

Die and tooling record

Log metres through each die, with cleaning, lip polishing, mandrel repair and screen pack changes, and warn the line supervisor when a die is due for the tool room.

Bundle tagging and dispatch

Print bundle tags with section, cut length, compound lot and order, then issue a delivery note from the bundle count, so the truck leaves with the right lengths.

Screw and barrel wear record

Hours run, screw replacement and barrel temperature trends are logged for each extruder. Maintenance sees which line is due for a screw check. Output drops are tied to wear.

Scrap and regrind account

Start-up scrap, trim and rejected lengths are weighed per run and fed back as regrind. The production head sees the share going back into compound. Regrind use is limited by product grade.

Cut length and offcut stock

Cut pipe and leftover lengths are recorded by diameter and class, with the run they came from. Sales staff offer them before a new run starts. Metres on hand show per size.

Customer colour and profile approvals

Approved colour chips and profile samples are stored against each customer’s order. The line supervisor matches output to them. A revised section needs the customer’s approval before the die is changed.

The records that hold the operation together.

  • Extrusion quotations. Price pipe, profile or sheet from weight per metre, screw output, resin and masterbatch cost and cut-to-length sawing, and keep every revision beside the accepted figure.
  • Section and die register. Hold each section’s wall, outside diameter, tolerance and die, with weight per metre and the cut lengths each buyer orders. A 32 mm conduit and a 110 mm drain pipe each keep their own sheet.
  • Line run log. Record screw speed, barrel zone temperatures, melt pressure, haul-off speed and metres per run, then set kilograms per hour against the quoted rate.
  • Compound recipes and stock. Store each blend of resin, stabiliser, filler and colour, receive lots with their test certificates, and draw them down against runs. Low stock is flagged per line.
  • Regrind and scrap. Weigh start-up scrap, purge, trim and saw cut-offs against the run. Clean regrind returns to the hopper within the share set for that section.
  • Dimensional checks. Log wall thickness, outside diameter, ovality and surface findings such as die lines or gels during the run. Bundles outside limits are held until a supervisor releases them.
  • Die maintenance. Count metres through each die land, schedule cleaning and polishing, and note repairs. A die past its service limit is flagged before the setter can fit it.
  • Cut-length orders. Split one run across buyers by length and metres, and show the bundles of each length still awaiting sawing.

Operational bottlenecks to check

Start-up scrap is never costed

Each colour change and die change burns compound before the first good metre leaves the saw. Purge, die-lip drool and trimmed ends go to the regrind bin unweighed. So the yield you quoted and the yield you achieved drift apart, and the loss slides quietly into the next job’s price.

Dimensions are measured and then lost

Wall thickness, outside diameter and ovality are read at the tank and noted on a clipboard, and the sheet is filed by date, not by order. When a buyer queries one bundle three weeks later, nobody can find the readings taken at that hour.

Compound lots blend unseen

Virgin PVC-U or polyethylene, stabiliser, titanium dioxide, masterbatch and reground pipe ends all drop into one hopper. The recipe behind a given metre lives in the operator’s memory, a poor place to look when a buyer asks about pipe delivered last quarter.

Dies are not tracked

A die needs cleaning, mandrel checks and lip polishing after a run, but without a count of metres through it, a worn land leaves die lines and uneven walls. Nobody notices until a buyer rejects a bundle at the gate.

Cut-length orders mix up on the floor

Five customers may want one profile in five lengths. Tags are written by hand with a marker. A bundle of three metre lengths reaches the truck meant for a six metre order.

Follow the work across teams.

This is a planning flow. Confirm the steps, owners and approval rules against your actual operation.

  1. 1. Enquiry and quotation

    The enquiry names a pipe size and pressure class, a profile section or a sheet gauge, with the cut length and metres wanted. The quote uses weight per metre, line output and compound cost, and every revision is kept.

  2. 2. Die and trial

    The die comes from the tool store or is made new. A start-up trial records zone temperatures, scrap and measured wall before the run is cleared for the buyer.

  3. 3. Line planning

    The planner picks a line by size range and screw output, places colour changes so the lightest shade runs first, and checks resin, masterbatch and regrind for the whole run.

  4. 4. Running

    The operator logs barrel temperatures, screw speed, haul-off speed and metres, with wall and diameter checks entered as the pipe leaves the sizing tank. Trim goes to the grinder.

  5. 5. Cutting and bundling

    Lengths are cut at the planetary saw to order and counted into bundles. Tags print section, length, count and order number.

  6. 6. Dispatch

    The delivery note lists bundles and metres, and the invoice follows from it. The die goes back to the tool store with its new metre count and a note on its condition.

Roles and responsibility boundaries.

For owners and extrusion plant heads

Read line utilisation, scrap by cause, output against quoted rate and open orders in metres without a walk down each line. The numbers wait on one screen.

For planners

Choose a line for each section, place colour changes, and see when dies and compound will be ready. Clashes appear on the board before the shift.

For line operators

Log settings, output and scrap at the puller, and print tags as bundles are counted. Entry takes seconds on a tablet.

For the tool room

Follow metres through each die, plan polishing and note repairs between runs, so the tool room works from a list and not from complaints.

For quality staff

Enter wall and diameter checks, hold bundles outside limits and issue the results sheet a buyer asks for, with the run and compound lot printed on it.

Reports your managers need.

  • Line output in kilograms per hour against the quoted rate
  • Scrap and purge by cause, line and colour
  • Compound, masterbatch and regrind consumed per order
  • Dies ranked by metres since polishing
  • Dimensional check results by section and run
  • Cut-length orders still open, in metres and bundles
  • Bundles dispatched by buyer with run references

Connections to scope

  • Tablet entry at the line
  • Email
  • WhatsApp
  • Barcode label printer
  • Accounting export

Confirm data access, record ownership and the exchange method for each connection. Inclusion here does not mean every connection is available in a standard package.

Setup decisions and adoption risks.

Use these requirements to plan phases, data migration and user training. Agree the release sequence after reviewing your current systems.

Your sections and dies

Sizes, tolerances and die numbers go in under the names the plant already uses, such as 40 mm PVC pipe, 25 mm channel or 3 mm sheet.

Recipes and colours

Compound grades, stabiliser packs and colour matches are stored per section, with the regrind share your quality staff allow.

Check plans

Measuring points, sampling intervals and the conditions for holding a bundle follow each buyer’s drawing. You sign off the plan before any line runs it.

Records brought across

Before go-live we load the running orders, the metres each die has already produced and the compound in the store. Your tool room checks the die counts.

Hosted by GullySystem

Planners, line leads and the dispatch bay open the same records on our servers. Our staff make master data changes on request.

Limitations to settle before implementation

  • A plant with a single line and one standing product can manage with a run sheet and a stock book.
  • Companies whose main work is moulding solid parts or blowing bottles will find Injection Moulding Company Management Software or Blow Moulding Company Management Software closer.

Modules to consider first.

These functions connect to the operating model above. Confirm each one against the work your business actually runs.

Choose the operation you want to improve.

Use these activities to explain your scope. Your business does not need every function in the directory.

  • Pipe and conduit supply to plumbing and electrical dealers
  • Window and door profiles for fabricators
  • Drip and irrigation lines for farm supply dealers
  • Sheets for thermoformers and signage printers
  • Rate contracts with builders and project contractors
  • Export enquiries for profiles and sheets
  • Colour and size matching for repeat buyers
  • New dealer appointments in districts you do not yet cover
Talk to us

Start with the problem your team can describe.

Bring a sample record and show where information is copied, missed or waiting for approval. Scope the first useful change from there.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements