Skip to main content
GullySystem
Manufacturing

Work Order Management for Rubber moulding companies

Track a production job from material issue to completed output.

Manufacturing

Does this function belong in your operation?

Use when physical production needs a job-level record of materials and output.

A production plan releases a specific job.

One work order covers a part number, a mould, a press and a quantity of shots. Compound issue, cure cycles run and trimmed output are booked against it. Post-cure waits are visible.

Bring the records the workflow depends on.

  • Required output
  • Approved material list
  • Process steps and due dates

Outputs to check

  • Released production-job record
  • Material and output reconciliation
  • Work-in-progress and variance list

Follow the work order management workflow.

Use this sequence to compare your current process with the proposed module. Agree the owner, permission and exception at each step.

  1. 1. Release the job

    Record output quantity, instructions and the approved material version.

  2. 2. Issue resources

    Link materials and assigned production stages to the work order.

  3. 3. Record progress

    Capture completed operations, interruptions and additional material requests.

  4. 4. Inspect output

    Pass the produced quantity to the agreed quality or acceptance check.

  5. 5. Close the job

    Reconcile accepted output, scrap, unused material and unfinished quantities.

Who uses the module, and who approves?

Keep responsibilities distinct even when one person holds more than one role.

Production in-charge

Releases jobs, moves them between stages, and holds the ones waiting on material with a reason typed in.

Supervisor

Marks the stage done from a tablet near the machine.

Storekeeper

Issues material against the job number and sees what is still due to it.

Owner

Looks at what is late, and at what is late for the same reason every week.

Decide how exceptions are handled.

These business rules belong in configuration and testing. A normal transaction alone does not demonstrate that the workflow is ready.

Material issued beyond plan

Record the reason and obtain the required approval.

Output below target

Keep the uncompleted balance or close it with an authorised shortfall reason.

Job paused mid-process

Retain work-in-progress quantities and the stage from which work will resume.

Can this work independently?

A work order needs an output definition and process instructions. It can use entered materials and progress, but bill-of-materials, stock and quality links make execution traceable. Sales orders provide demand; closing production is not the same as dispatching or invoicing the finished goods.

Systems and records it connects with

  • Bill of materials: Approved component quantities and production-definition versions.
  • Production planning: Demand, planned quantities and resource or material constraints.
  • Stock: Item-location quantities and authorised stock movements.
  • Job work delivery notes: Material dispatch and return references for outside processing.

Configure, test and introduce the workflow.

  • Tell us the stages a job passes through, in your words. A stage list comes back to confirm.
  • Sales orders are connected, and so is the bill of materials. A sample work order draws on each. A screen shows jobs by stage. The supervisor tries it beside the whiteboard.
  • Supervisors and the store use live work orders. The whiteboard is retired after a trial period.

Check the result before rollout.

Apply these checks to a sample from the agreed workflow, then repeat with an exception. Keep the expected result beside the test record.

  • Output links to its work order.
  • Material usage is traceable.
  • Unfinished quantities remain visible.
Rubber moulding companies

How the business operates.

A rubber moulding shop makes bushes, grommets, bellows, mounts and bonded rubber-to-metal parts. Raw rubber and fillers are mixed into compound on a mill or an internal mixer. Strips or preforms are cut to weight, loaded into a heated mould and cured under pressure. What decides quality is the mix that went in, the cavity that shaped it and how long it sat under heat and pressure.

Compound batches and test results

Record each mix with its recipe, rheometer curve, hardness and specific gravity, and mark the batch as released or held.

Mould and cavity register

Hold each mould with its cavity count, press fit, shot history, repairs and the date it was last cleaned.

See the full industry workflow, reports and implementation plan →

The records that hold the operation together.

  • Enquiries and drawing quotations. Log each buyer drawing and price it from compound cost, preform weight, cure time and cavity count. Every revision of the quote is kept.
  • Compound recipes and batches. Hold recipes with polymer, carbon black, filler and curative shares. Record each mix with its rheometer curve, scorch time, hardness and release status.
  • Mould and cavity register. Track every mould with cavity count, press fit, shot count since cleaning and repair history. Plating, venting and dowel pin work is logged too.
  • Press cure settings. Store time, temperature and pressure for each mould and compound pair, then show them at the press, so the tag on the wall is no longer the record.

Operational bottlenecks to check

Compound batches and parts are separate worlds

The mixing room keeps batch sheets and the press operator keeps a shot count, so a rejected bag of bushes has no batch behind it.

Cure settings are chalked on the press

Time and temperature for each mould are written on a tag or in the operator’s head. A new operator runs a different cure and the parts come out under-cured or burnt.

How work flows across this business

This module sits within a wider operating process. Use the sequence to identify the other teams and records affected by a change.

  1. 1. Enquiry and drawing

    The drawing arrives with a compound grade and a Shore A hardness range. The estimator quotes from compound cost, preform weight, cure time and cavity count.

  2. 2. Mould and sample

    The mould is made or drawn from the tool store. A first-off sample is moulded, measured against the drawing with a dial caliper and durometer, and sent to the buyer for approval.

  3. 3. Compound mixing

    The mixing room makes a batch on the two-roll mill or internal mixer, tests it on a rheometer and durometer, and releases or holds the compound for the presses.

  4. 4. Moulding

    Preforms are cut to weight and loaded into the cavities. The press runs at the recorded cure, and shots and rejects are logged against each cavity.

  5. 5. Trim, post-cure and inspection

    Flash is removed by trimming or cryogenic deflashing. Post-cure ovens run where the compound needs them, and inspectors check dimensions and surface faults such as flow marks and backrinding.

  6. 6. Bag and deliver

    Parts are counted into labelled bags. A delivery note and any requested certificate go out with them, and the invoice follows the order.

Industry reports to connect with

  • Orders by press with compound batch and cure
  • Batches released, held and rejected
  • Scrap by cause, mould and cavity
  • Shots since cleaning by mould

Questions before implementation.

When should rubber moulding companies consider work order management?

Use when physical production needs a job-level record of materials and output. A production plan releases a specific job.

What should we bring to the requirements discussion?

Bring anonymised examples of Required output; Approved material list; Process steps and due dates. Show who creates, checks and changes each record. Use only records from an activity that meets the suitability conditions above.

Does this replace our existing business software?

The starting point is your current system and the gap you need to close. Track a production job from material issue to completed output. Configuration, a connected module or a custom build are evaluated against that gap before a replacement is proposed.

What is outside this module?

This is a production work order; field repairs and customer visits belong in job cards.

How are scope, price and rollout decided?

The proposal follows a review of your records, user roles, branches and existing software. Data migration, connections, training and support are scoped separately where needed. Output links to its work order. Use this check when reviewing the first working version.

Talk to us

Discuss work order management for your business.

Tell us which workflow needs attention and which systems your team uses. The next step is a requirements discussion and a written scope.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements