How to Set Up Ticket and Preventive Round Records for Solar Plants

Ganesh HSStrategy and Technology, GullySystem
Practical advice · 4 min read

In this guide 7 sections
The short answer

Set up one ticket record and one round checklist per plant, then report from them. Every fault, whether it came from a portal alarm or a phone call, becomes a ticket. Every cleaning or preventive visit becomes a dated checklist with photos. Solar O&M companies can build this as a custom system.

Make every fault a ticket, whatever its source

Faults reach an O&M desk in three ways. A monitoring portal raises an alarm, an owner phones, or an engineer finds the problem on a round. Only the first is written down anywhere.

Give all three the same ticket. It names the plant, the equipment, the time reported, the engineer assigned and the cause found. A ticket closes only when a cause and a fix are noted.

This is the record an owner’s query is answered from. Over a few months the same record also shows which plants raise the most calls, which equipment fails most, and which engineers close tickets with a cause noted.

  • Plant and equipment named on each ticket
  • Source of the fault: portal, call or patrol
  • Engineer assigned and time reported
  • Cause found and fix made
  • Time the ticket was closed

Keep the contract terms next to the plant

Each plant has its own contract. Response time, cleaning frequency, the committed generation level and the spares included can all differ. An engineer on the road, with a call waiting and a plant forty kilometres away, rarely remembers which terms apply.

Put the terms on the plant record, in a short list the ticket screen can show. The engineer then sees the response expected before the call is accepted.

Where a term is unclear, ask the owner and write the answer down. A disputed month is easier to settle with a dated note.

Turn cleaning and preventive rounds into checklists

A round is more than a visit. It covers modules, strings, inverters, cables, earthing and structures, and each item has a reading or a finding. A paper sheet photographed later loses detail.

Fill the checklist on a phone at the plant, with photos attached to the item they show. Cleaning is logged by block or array, so the supervisor sees which area was missed.

Plan the calendar by season. Dust and rain change how frequently a site needs cleaning, and the schedule should be edited without losing last year’s record.

  • Checklist items for modules, inverters, cables and earthing
  • Photos tied to the item they show
  • Cleaning logged by block or array
  • Missed rounds visible the same day

Track spares from store to plant

Fuses, connectors, surge protection devices and cable ties travel in vehicles. A part issued to an engineer and never booked to a plant is a cost nobody sees.

Record each issue with the part, the engineer and the ticket. When a part is fitted, the plant record shows it. Warranty dates by serial sit beside it for any inverter or module claim.

Build the owner report from these records

The report for the period holds generation, performance ratio, availability, tickets raised and closed, and cleaning done. Tickets and rounds already hold three of those.

Generation figures come from the inverter portals or loggers. Whether those can be read automatically depends on the make, and some makes do not open their data. Until a link is confirmed, load the figures as a file.

Check the first few reports against the old ones, line by line, with the engineer who used to build them. Differences show where a field is missing.

Put the advice to work.

Use a test copy or fictional example to turn the discussion into something your team can check.

Build the owner report from these records

What does one row mean before totals are combined?

Choose one period in “Build the owner report from these records” and compare it with the source records. Define the date basis and grouping before accepting a total that combines several kinds of entry.

Background reading: Microsoft: reporting grain and relationships

Plant ticket and round sheet

Use a sheet with a row per plant. Columns hold the contract response time, cleaning frequency, last round date and open tickets. Run it for a month before building anything, and note which columns nobody can fill.

Open a blank worksheet to print

Questions owners ask

Can the tickets be raised from a monitoring portal alarm?

Not automatically as a rule. Portals differ by inverter make, and a link is confirmed plant by plant. Until then, the desk enters the ticket from the alarm.

Do we need software for a handful of plants?

Not always. With a few plants and one engineer, a shared sheet and a photo folder may do. Software pays off when several engineers, contracts and rounds overlap.

Can engineers fill checklists without a mobile signal?

Not today. The phone needs a connection when the form is saved. Engineers can note findings on paper and enter them once they are back in coverage.

Browse all guidesBack to top ↑
Next step

Have a specific situation to work through?

This article covers the general case. Tell us what you’re actually dealing with and we’ll respond directly.

See software for solar plant maintenance companies