What a Rooftop Solar Installer Should Review Every Month
Each month, a solar installer should review five things. They are files waiting on approvals, proposals not yet accepted, payments due by milestone, serial and warranty records, and service visits due. GullySystem’s Solar Installation Management Software keeps these on each customer’s record. The aim is to see what is stuck before the customer calls.
Ganesh HS, Strategy and Technology, GullySystem · · 3 min read
Files waiting on approvals, and for how long
Feasibility, the net meter, inspection and subsidy steps take weeks. The customer counts those weeks from the day he paid the advance. A monthly list of files by stage, with days spent there, shows which need a push.
Sort the list by age, not by customer name. A file returned by the DISCOM needs a note of what was asked for. The PM Surya Ghar portal sets out its own steps, so check them there and with your DISCOM.
- Files by stage, from feasibility to subsidy credited
- Days each file has sat at its stage
- Documents still missing per customer
- Files returned with a query
Proposals that have not become jobs
Count proposals sent this month and those still open from earlier. Note which system sizes and panel makes customers accept. Note too which enquiries went quiet after the survey.
Every open proposal needs a follow-up date and an owner, and a proposal revised three times is still one enquiry with its revisions kept together. Then the accepted one is clear.
Money due at each milestone
Many installers take payment in parts. There is an advance, a payment on material delivery and one at commissioning. Check each customer against the stage reached, since a commissioned job missing its final payment is easy to overlook.
List amounts due by job and by age. Separate what waits on the customer from what waits on the subsidy. Customers often link the two, so explain which is which.
Serials, warranties and stock for open jobs
Every job installed this month should have its panel and inverter serials recorded. A warranty claim later starts from that record, not from a ladder. Missing serials are easier to collect while the crew still remembers the roof.
Compare material in stock with what open jobs need. Shortfalls then show before a crew is booked. Glance at warranty dates by supplier as well.
- Serials logged for every job this month
- Warranty dates by supplier
- Stock set against open jobs
Service visits, cleaning and AMC renewals
After handover, customers call when generation drops, and modules need cleaning. Log each call against the installation, not on a technician’s phone. Then compare visits done with visits due.
AMC renewals falling due next month need a call now. Complaints that repeat at one site point to a fault. Give those a proper look.
Solar installer monthly review sheet
A single sheet with five blocks: approvals pending by age, open proposals, payments due, serial and stock checks, and service visits. Fill it on the first working day of each month. Set it beside last month’s sheet to see what moved.
Open a blank worksheet to printQuestions owners ask
Does the software file subsidy or net metering applications?
No. Filing happens on the portal and with the DISCOM, in your own login. The software tracks each file’s stage, documents and dates.
Can proposals show expected generation and payback?
No. Several system sizes in kW can sit on one enquiry, and the accepted revision is kept. Expected units and payback are not calculated in it.
Can it read inverter generation data?
Not by default. Monitoring portals differ by inverter make, so any link is confirmed during scoping.
Does a small installer need this?
Perhaps not. An installer doing a handful of jobs a year can manage with a notebook and a spreadsheet.