Skip to main content
GullySystem

Maintenance requests and work orders for apartments

Each repair request is logged against a flat, a stairwell or a lift. It becomes a work order for the plumber, the electrician or an outside vendor. Parts cost, the invoice and the superintendent’s sign-off stay with the order. Caretaker, manager and resident all read one queue.

What a repair request and work order record

A request starts as a complaint and ends as a closed order. Between the two, the record collects who asked, where, who fixed it and what it cost. Four groups of facts make up the page. The same page serves every trade.

Location and the fault

The request names where the fault is: an apartment, a stairwell, a lift, a pool, a boiler room or a car park. The fault is described in words. One request covers one fault, so a leaking tap and a dead light become two orders.

Assignment to a trade

The order is assigned to the plumber, the electrician, the lift engineer or an outside vendor, with the date it was assigned. A named person owns it. The manager can see who holds each open order.

Parts, hours and invoice

Crews record the parts used and the hours spent. An outside vendor’s invoice is attached to the same order. The cost lands on the right account. That is one apartment or a common area such as a car park.

Photograph and sign-off

The finished repair is photographed and closed with a note from the crew. Superintendents then sign it off. Until that sign-off, the order shows as awaiting approval rather than complete. Closing alone is not enough.

A maintenance day from request to sign-off

Repairs arrive from every direction: the portal, the office desk, a word to the caretaker. One list pulls them together. No request lives only in someone’s memory. Four moments from a single working day show how a request travels to a closed order.

A resident reports a dripping tap

A resident of A-117 raises the request on the portal. The office confirms it and turns it into a work order. A plumber is assigned. The resident sees the order move from received to assigned.

The lift engineer is called

A lift stops between floors. The request is logged against the lift, not an apartment, and an outside vendor is assigned. The invoice, when it arrives, is attached. Cost lands on the common-area account.

The plumber’s round

The plumber opens the day’s orders on a phone. Each job gets its parts and hours recorded on the spot. A photograph of the finished repair is added. The order closes with a short note.

The superintendent signs off

The superintendent reads the closing note, looks at the photograph and signs off the order. A tap replaced in A-117 shows as closed with its cost logged. The resident sees the same status.

Who sees which repair and what each can do

Everyone who touches a repair sees the same order, but each role does something different with it. Residents ask. The office assigns. Crews fix. The owner reads the cost. Each step is shown to the next person.

For the community owner

The owner reads maintenance spend by block, with open and completed orders counted by trade. A block whose costs are climbing stands out. Individual orders can be opened when a figure needs explaining.

For the community manager

Managers see the whole queue, reassign orders and chase the ones that wait. Every order has a named owner and a date. Spend on a block can be checked before an invoice is approved. Costs are checked first.

For maintenance crews

Crews open the day’s orders on a phone. They record parts and hours, photograph the finished repair and close each request with a note. Their list holds only their own assigned orders.

For the residents

Residents raise a request and watch its status. The portal shows the order from received to closed. Repairs on other flats are not visible. Notices about lift or boiler work appear in the same place.

Work order choices to settle before set-up

The queue works best when its rules are agreed beforehand. Settle four points with the manager, the superintendent and the lead technician. A short meeting is enough. The answers decide who can raise, assign and close.

Who may raise, assign and close

Decide who can raise a request, who assigns it and who may close it. Residents raise, the office assigns and the superintendent closes. Keep the three roles apart. No one signs off their own work.

What counts as a work order

Decide which jobs become orders and which do not. A leaking pipe is an order. Repainting between residents belongs to turnover. Settling this keeps the list to genuine faults and stops planned work from crowding out urgent calls.

How open repairs come across

Collect the repairs the caretaker holds on paper or in messages. Each is keyed as an open order or closed as done. Before residents are invited to raise anything new, the list is read through. Old jobs are cleared first.

Which report matters first for Maintenance requests and work orders

Begin with open and completed work orders by trade and technician. It shows who is carrying the load and where orders wait. A long plumber’s column means rebalancing. Do it early.

How work orders connect to other features

A repair rarely stands alone. It begins from a resident’s request or an inspection. It ends in a cost that reaches the owner’s spend, and sometimes a deposit deduction. Five links trace the path from the first request to the final cost on the owner’s page.

  • Repair requests arrive from the resident portal
  • Apartment codes come from the unit register
  • Closed work orders supply costs for deposit deductions
  • Turnover repairs are raised from inspection defect lists
  • Maintenance spend rolls up by block for the owner

Where maintenance work orders stop

The queue records requests, assignments and costs. It does not diagnose a fault, and it does not pay a vendor’s invoice. Required safety inspections of lifts, boilers and similar plant stay with the owner and the adviser, as does the question of who bears a repair’s cost. A block with one caretaker may manage with a notebook.

FAQ

Frequently asked questions

Can a resident see where a request stands?

A resident logs in and sees each request they raised, with its status from received to closed. The closing note and the date appear once the sign-off is made. Other residents’ requests stay hidden. The page is private.

How are parts and hours recorded on a phone?

The technician opens the day’s orders on a phone and enters the parts used and the hours spent against each one. The finished repair is photographed. The note completes the entry, and the order moves on to sign-off.

Who closes a work order?

The technician closes the work with a note and a photograph, and the order then waits. Superintendents then sign off. Until that happens, the order shows as awaiting approval, so unfinished or doubtful repairs are not counted as done.

Does an outside vendor’s invoice stay with the order?

Yes, the invoice is attached to the same work order as the fault, the assignment and the sign-off. The manager checks it there before it goes to accounts. Payment itself happens in your accounts, not here.

How does a cost land on the right account?

Each request is logged against an apartment or a common area. The parts and the invoice carry that location with them. Spend by block then separates unit repairs from lifts, stairwells and car parks. Lifts show apart from flats.

Where it fits

How this feature fits the system.

Apartment Community Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

Leasing pipeline

Every enquiry is logged with its source and the apartment asked about, so leasing agents see which prospects still need a viewing or referencing.

Lead Management

Leases and renewals

Each lease is held with its term, rent, addenda and break clause, and tenancies expiring soon are listed so offers go out before notice.

Contract Management

Rent ledger and charges

Rent, service charges and metered utilities are raised monthly for every let apartment, with payments and credits set against the same ledger.

Subscription Billing
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements