Skip to main content
GullySystem

Delivery and installation crews for cabinet makers

Delivery and installation crews plans each load and crew by site and builds the kit list from the order. Packs are ticked at loading and again on arrival. Installers record completion, snags and photographs from a phone, and a van that leaves short of a pelmet is flagged before it reaches the road.

What a delivery and installation record holds

Each site visit is a record with a date, a crew, a load and a kit list. The kit list comes from the order. Ticks at loading and on arrival are kept, so what left the factory and what reached the wall are both known.

Load and crew by site

Loads are planned by site, with the crew named and the day set. One line per site. A van carrying two kitchens for different addresses shows both, and the planner sees which crew is free.

The kit list from the order

Every pack, handle, filler strip and pelmet for the order is named on it. Nothing is typed afresh. The order generates the list, so it always matches what was sold. A missing item is flagged before the van leaves the bay.

Ticks at loading and on arrival

Packs are ticked at loading and ticked again on arrival at the site. The two ticks are kept apart. A pack ticked out but not ticked in shows as missing, or as left behind in the van.

Completion, snags and photographs

On finishing, the crew records completion, notes snags and adds photographs. A snag is an open item. It stays on the order. The report of installations done and snags open reads from these entries, so it stays current.

A crew’s day from loading bay to handover

An installation day begins at the loading bay and ends at the customer’s door. The scenes below follow a crew through one day. The scenes are short. Each shows how a kit list and a phone replace memory on the road.

Loading the van at the bay

Each pack is ticked against the kit list as it goes in. The screen shows a pelmet still missing for one kitchen. The loader goes to find it. The van leaves with the pelmet, not without it.

Arrival at the site

On arrival the crew ticks the packs again. The installer does this on a phone. Anything missing is known before a single carcase is lifted, so the office can be told while the van is still there.

Fitting carcases, plinth and worktop

Carcases go in first, then plinth and worktop, working down the list. A scratched panel is photographed. It is added as a snag on the spot. The photograph is attached to the order for the office to see.

Closing the job

The installer closes the job. Snags are listed, and completion is recorded with photographs, all from the phone. Back at base, the result is read without calling the crew or waiting for a paper slip.

Who reads crew records and what each sees

The people who load, fit and plan read different parts of the same site record. Each role below sees what it needs for the next decision. It sees no more than that.

Installers on a phone

Installers see their own sites on a phone. They tick packs at arrival, record snags, add photographs and close each job. They do not need the cut list or the rates, only the kit list and the address.

Planners and supervisors

Planners and supervisors read which orders are packed and ready to load. They build the load and name the crew. A kit flagged as incomplete goes back to the floor before it reaches the van.

Stores and purchasing

Stores supply the loose items on the kit list, such as handles and filler strips. Purchasing reads which sites are waiting on a missing part. A short supplier delivery shows up in the crew’s day. Seen early, it costs less.

The owner’s view for Delivery and installation crews

Owners read installations done and snags open, and see which kits are incomplete this week. A second visit costs the crew and the van a day. Avoiding it saves money. The customer waits less, and the crew moves on to the next site.

Decisions before crews use phones

Crew records work best when the rules are set before the first live installation. Settle these four points with the installation lead and the planner. Each shapes what the crew does at the site. Four questions only.

Who may close a job for Delivery and installation crews

Decide who may close a job and who may reopen one. Installers close their own sites. Reopening a job is for the office, when a snag is raised later. Each reopening should carry a note saying why.

What the kit list leaves out

Decide which items are listed. Packs, handles, fillers, pelmets and plinth sections belong. Screws, adhesive and silicone can travel as loose van stock. They stay off the list, which keeps ticking quick at the bay.

How booked sites come across

Booked installations come over with their date, crew and address. Open snags from earlier jobs can be entered too. Check a few against the diary before the first load is built. The task is short.

Which report matters first for Delivery and installation crews

Start with installations done and snags open. It shows what crews finished and what still needs a visit to put right. Agree who reads it each morning, and who books the return visit when one is needed.

How crews connect to other features

Delivery is the end of the factory chain and the start of the customer’s. Its kit list arrives from earlier features, and the site record flows on to billing and aftercare. Handovers run in both directions. The links are listed here, one per neighbouring feature.

  • Takes the kit list from cut lists and bills of materials
  • Receives packed orders from production planning and work orders
  • Receives passed cabinets from quality checks and rework
  • Tells stage invoices and receipts when a job is complete
  • Gives warranty and service calls the site record and photographs

Where delivery and installation records stop

This feature plans loads and records ticks. It does not route vans, track vehicles or set drivers’ hours. Road and site safety stay with the owner and the crew leader. Charges for a second visit and disputes over damage are settled between the owner and the customer, with an adviser where needed. A maker who delivers to one site a week may plan on a calendar.

FAQ

Frequently asked questions

What happens when a pelmet is missing at loading?

It shows as not ticked, and the van is flagged. A loader finds the pelmet or tells the office. The shortage is known at the bay, not at the customer’s door. The crew loses no day.

Can installers close jobs from a phone?

Installers see only their own sites on a phone. They close each job there. At the end they record completion, snags and photographs. Back at base, the result is read without a phone call or a paper slip.

Are snags and photographs kept with the order?

Each snag and each photograph is saved against the order that the crew was fitting. They stay there for later reference. A later complaint can be compared with what the crew recorded on the day.

Can one van carry orders for several sites?

One van can carry more than one site. Every site keeps its own line and kit list. The ticks are kept by site, so packs for one customer are not mixed up with another customer’s packs.

Does it plan which crew goes to which site?

Loads and crews are planned by site, with the day set and the crew named. The planner sees which crew is free. The choice stays with the planner, and the system does not pick a crew on its own.

Where it fits

How this feature fits the system.

Cabinet Manufacturer Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

Enquiries and design requests

Each enquiry is logged with its source and site, and drawings, photographs and finish choices stay attached to the customer record.

Lead Management

Quotations and rate lists

Quotes are built from board, hardware, labour and finish rates, every revision is kept, and open quotations stay in one list for follow-up.

Estimate/Quotation Management

Drawing and finish approvals

Each drawing version is stored with the customer’s approval and the finish sample, so the cutting team works from the agreed one.

Project Document Management
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements