Skip to main content
GullySystem

Delivery and Install Scheduling for Countertop Crews

Delivery and install scheduling plans countertop loads and crews by day, with pieces loaded in install order. Installers open the job on site, record snags, add photographs and take the customer’s sign-off. The office sees which installs are planned, ready and complete, and the owner reads installs by crew.

What a delivery and install record holds

Each install has a crew and a load. The record lists the jobs on the van, their order and their readiness for loading. After the visit it holds the installer’s notes, the photographs and the customer’s sign-off, each with its date.

Day, crew and load

A day’s plan names the crew, the van and the jobs on it. Stops show address and pieces. The crew opens its day and sees every stop in order, with the job’s seam notes under each.

Install order and readiness

Pieces are loaded in install order. The load list follows that order. Each job shows whether every piece has passed its checks. A job with a piece still at the polisher is marked not ready.

Site photographs and snags

At the site the installer adds photographs of the fitted top and lists any snags, such as a gap at a seam or a chip. Each snag is dated and tied to the job. The entry saves when the phone has signal.

The customer’s sign-off

The customer’s sign-off is taken on the visit and saved with the date and the installer’s name. A job with no sign-off stays open. The balance invoice follows completion, so accounts read this mark before billing.

Planning installs through a working week

Install scheduling joins the shop and the road. Dispatch needs to know which pieces are ready, the crew needs stops in order, and the customer needs a day. Four moments follow a crew through one working week of deliveries and fitting.

Planning the next day’s loads

The dispatcher opens tomorrow’s jobs and sees which are ready. Jobs that are not ready wait. Ready jobs are assigned to a crew and sequenced by address, so the load list matches the route the van will drive.

Loading the van in order

Loaders read the load list for each crew and place pieces in install order. A tick records each piece loaded. A piece missing at the van is raised before the crew leaves the yard, not after.

Fitting and recording on site

The installer opens the job on a phone, fits the top and seals the joints. Snags and photographs are added as the work finishes. The customer signs. The crew then moves on to the next stop.

Closing the day at the yard

Back at the yard, the foreman reads installs planned and completed by crew. Any unfinished stop is rebooked. A note records why, and the office sees the new date and can tell the customer at once.

Who uses install scheduling and what they see

Scheduling touches the dispatcher, the loader, the installer and the customer’s calendar. Each person sees a different slice of the same plan. The owner sees the week. Installers see the day.

Owners

Owners see installs planned and completed by crew, and installs this week that are not yet loaded. One crew with a long list of snags stands out. They do not rearrange loads.

Sales office

Sales staff give customers an install day and update it when the plan changes. A customer asking where the top is gets an answer from the load list. Answers rest on readiness, not hope.

Templaters and programmers

Templaters see their seam notes and photographs on the install sheet. Programmers see which pieces ship together and nest them with that in mind. Neither schedules the crews.

Shop crews, installers and accounts

Shop crews mark pieces ready, and loaders see the same list. Installers open the day’s stops, record snags and take sign-off. Accounts read the sign-off first. The balance invoice follows.

Settling delivery and install rules before go-live

Scheduling rules differ from one shop to the next, so decide them with your dispatcher and crew leads. Agree what ready means and what a signed job looks like. Settle these before the first load.

Who may change a booking for Delivery and Install Scheduling

Decide who may move an install day once a customer has been told. Dispatch and the sales office are a sensible pair. Every move records a reason. It names the person who made it.

What ready means

Define ready in your own words. One shop may mean every piece has passed its checks. Another may add the deposit being received. The rule is yours, and GullySystem sets it up that way.

Bringing open jobs across

Open jobs with booked install days come across with their dates. The dispatcher compares the list with the wall plan or calendar already in use before go-live. Any mismatch is fixed first.

The first report to read for Delivery and Install Scheduling

Read installs planned and completed by crew first. It shows whether plan and work match. A crew whose completed count trails its planned count needs a conversation about loads and stops.

How install scheduling hands over to other features

Scheduling is the last stage before the customer sees the top, so it takes readiness from the shop and hands completion to accounts. Snags raised on site return as aftercare. These are the five handovers to test on a sample kitchen. Run one through all five.

  • Ready status comes from quality checks and stages
  • Consumables for the load come from stores issues
  • Seam notes and photographs arrive from template records
  • Snags raised on site open warranty and aftercare calls
  • Signed completion triggers the balance invoice

Where delivery and install scheduling stop

This feature plans loads and crews and records what happens on site. It does not plan routes or give traffic times. Maps stay with the driver. It does not decide which crew has the skill for a job, which stays with the owner. A shop with one crew and one van can plan on a wall calendar.

FAQ

Frequently asked questions

How does the dispatcher know a job is ready?

Each job shows whether every piece has passed its checks and cleared its last stage. A piece still at the polisher marks the job not ready. Only ready jobs get a crew. Dispatch sees readiness on screen, and nobody phones the shop to ask.

Can pieces be loaded in the order they are fitted?

The load list follows install order, so loaders place pieces in the sequence the crew will fit them. Loaders tick each piece. A missing piece is raised at the yard rather than at the customer’s site.

What happens if the customer is not home?

The installer records that the visit could not finish, with a note and a photograph if useful. The stop is rebooked and the new date is saved on the job. The job stays open. Accounts see that sign-off is outstanding.

Where do snags found at install go?

Each snag is listed on the job with its note and photographs. Open snags stay visible. A snag that needs a later visit can become an aftercare call, linked to the same record as the original install.

Can an install day be moved after booking?

Either dispatch or the sales office moves the day, and the move records the reason and the person. The customer is told through your usual message channel. The crew’s plan updates for the new date.

Where it fits

How this feature fits the system.

Countertop Manufacturer Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

Quotations and selections

Tops are priced by area, edge, cutout and splashback, and each revision keeps the material and finish the customer picked.

Quote & Proposal Management

Templates and measurements

Site measurements, photographs and layout sketches are filed against the job, so the shop cuts from the figures the templater took.

Project Document Management

Slab inventory by lot

Each slab carries its lot, thickness and number, so a customer’s chosen slab is traceable from the yard to the fitted top.

Batch and Serial Tracking
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements