Skip to main content
GullySystem

Deck quotations built from your own rate list

A deck quotation is priced by area from the firm’s own board, joist, post, fastener, baluster, stair and labour rates. Revisions stay on file beside the version before. Estimators and owners see every quotation still waiting for an answer in one list, with the oldest first.

What a deck quotation and rate list hold

The rate list is the firm’s own price sheet, held inside the system. Each quotation draws its lines from that sheet and from the measures taken on site. Every saved version keeps the figures and choices it was priced with. That record is permanent.

Rate lines by material

Every board range, joist size, post, fastener, baluster and stair has a rate line, with labour rates beside them. The list is laid out like your current price sheet. Estimators find each rate where they expect it.

Deck area and extras

Pricing starts from the deck area taken at the site visit. Stairs, railings, a pergola or a built-in bench are added as separate lines. Clients see what each extra adds to the total. Nothing is buried.

Versions of one quotation

When a client asks for a wider stair or a different board, the earlier price is not overwritten. The new version sits beside it. Anyone can open both and see which lines moved between them.

Status and follow-up

Each quotation is marked open, accepted or declined, against the estimator who wrote it. Quotes still awaiting an answer sit together in one list. Those waiting longest show first. That order suits a morning of follow-up calls.

Pricing decks through a working week

Quotations are written in the gaps between site visits and chased in quiet hours. The working week is short on time. Four moments show where the rate list earns its place for an estimator, the office and the owner of a deck firm.

Pricing after a site visit

Back from a visit, the estimator opens the client’s page, reads the area and slope notes, and picks board, joist and post rates from the list. Labour comes from the labour rates. Version one is saved.

A client changes the board

On Wednesday a client rings to swap timber for composite boards. Estimators open the quotation, change the board line and save a new version. It is ready for comparison.

Following up quotes

Friday is for calls. An estimator opens the list of quotations still waiting and starts at the top, where the longest wait sits. Anyone who says no is marked declined, which shortens the list for the next call.

Acceptance reaches the office

A phone call brings an acceptance. The estimator marks the quotation accepted. Office staff then see it and start the deposit invoice, the permit paperwork and the supplier order against the job it has become.

Who prices, who approves, who reads

Quotations touch four kinds of reader. Some write them, some chase them, and some only need to know what is outstanding. Each role below sees the quotation list from its own side.

What owners see for quotations and rate lists

Owners see open, accepted and declined quotations by estimator, and how long each open one has waited. Prices are not changed from this view. It answers a plain question about what work will start next.

What estimators and sales see

Estimators write and revise quotations, record the client’s board and baluster choices, and follow each one until it is accepted or dropped. Their own quotes waiting longest show first. They price only from the firm’s rate list.

What the office sees for quotations and rate lists

Office staff see accepted quotations and turn each into a job with a deposit invoice. They read the quotation lines when ordering lumber, so what was sold is what is ordered. Private notes are not needed.

What site leads and crews see

A site lead opens the accepted quotation on a handset to check stair width, post count and railing run before work begins. Prices are not the point here. The lines tell the crew what was sold.

Decisions to settle before quotation set-up

The rate list is loaded first, so its shape needs agreeing early. Four choices decide how quotations behave once estimators start using them. None is difficult. Settle them with GullySystem before the first live quotation is written.

Who may change a rate for quotations and rate lists

Changes to your board, railing and labour rate tables are made by GullySystem staff when you ask. Decide who sends those requests, so requests are not scattered. One named person keeps the rate list consistent.

What a quotation leaves out for quotations and rate lists

Decide which costs a quotation does not price at all, such as a permit fee paid to the building authority. Estimators then know to mention these separately. The client reads one clear boundary on every quote.

How earlier prices come across

Your board ranges, joist sizes, fasteners, balusters, stairs and labour rates are loaded from your current price sheet. A few lines are checked against the original. Only then does a live quotation go out to a client.

Which report matters first for quotations and rate lists

Quotations still open, accepted and declined, by estimator, is the report to read first of all. It shows who is chasing and who is waiting. Agree who reads it and on which day. Keep it simple.

How quotations connect to the rest of the product

A quotation sits in the middle of the product, between the site visit and the build. It takes what the estimator recorded on site and hands the agreed lines to every feature that follows it. The figures live in one record. Nobody reprices a deck by hand later on.

  • Site measures come from the enquiry and visit
  • Material choices ride on the quotation to orders
  • An accepted quotation opens the deck job
  • Change orders add to the agreed total
  • Stage invoices are drawn from that same total

Where quotation records stop

The system holds your rates and applies them by area. It cannot know a supplier has raised prices until the rate list is revised. Tax treatment of a quote stays with your adviser. A single carpenter pricing a few decks a year can use a notebook and a calculator.

FAQ

Frequently asked questions

Are earlier versions of a quotation kept?

Each revision is saved as its own version beside the one before, with the date it was made. Clients who change a board or stair can be shown both prices. The first figure can always be found again.

Can I price a rebuild differently from a new deck?

A rebuild or refinish is a shorter job with its own rate lines, so it is priced from those lines. New decks use the full set of framing, board and railing rates. Both appear on one calendar.

How do I update a rate when lumber prices change?

Ask GullySystem staff, who revise your board, railing and labour rate tables when you request it. The change applies to quotations written afterwards. Earlier saved versions keep the prices they were written with. Nothing is rewritten.

Can the client’s material choices sit on the quotation?

Yes, the board, colour and baluster style the client picked are written on the quotation lines. A revised choice keeps the earlier version beside it. Every change is easy to trace. Nobody argues over what was picked.

How do I see which quotes need a call?

Open the list of quotations awaiting an answer. Those waiting longest show first, and each carries the estimator’s name. Marking a quote accepted or declined removes it from that list. The list gets shorter as answers arrive. Estimators see what is left.

Where it fits

How this feature fits the system.

Deck Contractor Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

Enquiries and site visits

Every deck enquiry is logged with its source and address, the site visit is booked, and measures and photographs stay on the client record.

Lead Management

Quotations and rate lists

Quotations are priced by area from the firm’s own board, framing and railing rates, with each revision kept beside the one before it.

Estimate/Quotation Management

Supplier orders and deliveries

Orders to decking and lumber suppliers are raised against a job, so the quantity, board colour and delivery date are written down in one place.

Purchase Order Management
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements