Skip to main content
GullySystem

Deck jobs and a build schedule on one calendar

Each accepted deck becomes a job with stages that run from footings to railings. Crews, lumber deliveries and dates sit on one calendar. When a delivery slips, the whole schedule moves in front of the office, the site leads and the owner together. Nobody learns of it late.

What a deck job and its stages record

A job is the working record of one deck. It starts when the quotation is accepted and ends at handover to the client. Stages break the build into steps. Site leads mark them off one at a time, with dates and photographs.

Stages from footings to railings

The stages follow the build: footings, ledger, joist framing, boarding and railings. Each is marked off when finished. A firm that adds a pergola or a stair run can add a stage for it too.

Crew, lumber and dates

Every stage holds the crew assigned, the lumber ordered for it and the planned dates. Those three facts sit together on the job. Nobody has to hunt through a diary to learn who is building what.

Progress and photographs

A site lead records how far framing or boarding has got and attaches photographs from a handset. Notes are dated. Anyone who opens the job can see the state of the deck without phoning site.

Site lead and job status

Each job names its site lead and shows its stage at a glance. A note says what the deck is waiting on, if anything. Status is plain. The owner reads it without opening every deck in turn.

Building decks across a busy week

A deck firm rarely has one job at a time. Crews move between sites, lumber arrives on different days and inspections interrupt the plan. A change on one deck touches others. These four moments show the calendar doing its work.

Starting a job on Monday

An accepted quotation is turned into a job. The office sets the stages, picks a crew for the footings and puts the dates on the calendar. The site lead sees the day’s deck on a handset by morning.

A late delivery

Boards promised for Thursday are pushed back to Monday. The new date is entered on the order. The boarding stage moves on the calendar, and every person who plans around that deck sees the change at once.

Reassigning a crew

With boarding delayed, the crew is free for two days on that site. The office moves them to another deck that is ready for framing. Both decks show the change. No site is left without carpenters.

Marking a stage complete

The next stage becomes the active one. Where an inspection is due, the job shows it as due, so the office can book it.

What each person sees on the calendar

The calendar is one picture. Each person looks for a different answer in it. These roles show the questions it settles for the owner, the estimator, the office and the people on site.

What owners see for deck jobs and build schedule

Owners see deck jobs by stage and site lead, and the count of jobs waiting on a delivery or an inspection. A cluster of stalled decks stands out. That helps when deciding what to chase first.

What estimators and sales see

Estimators check the calendar before promising a client a start. They see which crews are booked and which stages are running. A date offered at the table is one the yard can meet. That protects the sale.

What the office sees for deck jobs and build schedule

Office staff set stages, assign crews, enter delivery dates and book inspections. They watch which stages are running late and why. Dates are corrected there. One screen holds the whole plan. There is no second diary to reconcile.

What site leads and crews see

A site lead opens the day’s decks on a handset, sees the stage to work on and records progress. Crews learn where to go and what to build. Each deck’s notes are one tap away.

Decisions to settle before job set-up

Stages and calendar rules shape how the product feels to the crews. Choose them with care. Settle these with GullySystem and approve the list of stages before the first deck goes in.

Who may move a date for deck jobs and build schedule

Decide who is allowed to change a stage date or reassign a crew. If every carpenter can edit the calendar, it will drift. Give that right to the office and the site lead. Keep it narrow.

What stages are left out

Choose which small tasks are not worth a stage, such as clearing the site or a final sweep. A long list of stages tires the crew. Keep it to steps that truly need a mark-off. Fewer is better.

How running decks come across

Decks still being built are entered from your job register or spreadsheet, each at its current stage. A few rows are compared with the originals before the first live day. Finished decks come across as warranty records.

Which report matters first for deck jobs and build schedule

Deck jobs by stage, from footings to railings, and site lead is the first view to learn. It answers where every deck stands. Agree when the owner will look at it each week, and who prepares for that look.

How the build schedule meets other features

The schedule is where several features of the product meet. Orders feed it delivery dates, inspections feed it sign-offs, and crew entries feed it attendance by deck. All of them share one calendar. A change in one place is visible to the rest. Nothing is chased by phone.

  • Delivery dates arrive from supplier orders
  • Inspections block the next stage until signed off
  • Crew days are marked against the same deck
  • Change orders alter the scope the stages cover
  • Completed stages guide when stage invoices are raised

Where job tracking and scheduling stop

The calendar shows plans and progress. It does not build the deck, and it does not predict weather or inspector availability. Dates are only as good as the entries made against them. Sequencing choices stay with the site lead and owner. A single carpenter with one deck on the go needs only a wall planner.

FAQ

Frequently asked questions

Can I see every deck on one calendar?

Every running job appears with its stage, crew and lumber dates on a single calendar. New builds and rebuilds sit together. Choosing a site lead shows that person’s decks alone. The picture is never out of date.

What happens to the schedule when a delivery is late?

Enter the new delivery date on the order, and the stages that depend on it shift. The office, site leads and owner all see the moved dates at the same time. No call is needed.

Can crews see their day on a handset?

Site leads open the day’s decks on a handset, see the stage to work on and record progress and photographs. Saving a note needs a signal. A note from a dead-signal yard waits until coverage returns.

Can I add my own stage names?

Stage names are set with you at implementation. Footings, framing, boarding and railings can be renamed or extended. A pergola, a stair run or a built-in bench can have its own stage if you want one.

Does a stage hold up the next one automatically?

A stage that needs an inspection shows it plainly on the job, so the crew sees what must be signed off first. The system makes the block visible. The site lead decides whether to proceed.

Where it fits

How this feature fits the system.

Deck Contractor Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

Enquiries and site visits

Every deck enquiry is logged with its source and address, the site visit is booked, and measures and photographs stay on the client record.

Lead Management

Quotations and rate lists

Quotations are priced by area from the firm’s own board, framing and railing rates, with each revision kept beside the one before it.

Estimate/Quotation Management

Supplier orders and deliveries

Orders to decking and lumber suppliers are raised against a job, so the quantity, board colour and delivery date are written down in one place.

Purchase Order Management
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements