Tracking deck permits and inspections

Drawings, permit approval status and each footing, framing and final inspection date are kept with the deck job. Crews see what must be signed off before the next stage starts. Nothing is assumed. The office sees which inspection is booked and which is not, for every deck.

What a deck permit record keeps

Every deck that needs approval carries a short file on its job. It holds the paperwork, the status and the dates. Nothing sits in a diary. The record is read before each stage begins, by whoever is about to start it.

Drawings and permit papers

The drawings submitted for approval and the permit papers sit on the job as attached files. Revised drawings are added beside the earlier ones. Crews opening the job on site find the current set at once.

Permit approval status

The permit shows its status as the firm records it: prepared, submitted, approved or held. A note can say what the building authority asked for. Status is one line. The owner sees which decks are still waiting for approval.

Footing, framing and final dates

Each inspection has its own date field: footing, framing and final. The date booked and the date passed are both kept. A gap shows where an inspection has not been booked. That gap is easy to see.

Inspection sign-off notes

After an inspection, the result is written against it, with any item the inspector wanted corrected. A photograph of the fix can be attached. Crews read the note before the next stage starts, so a correction is not forgotten.

Permits and inspections through a build

Paperwork starts before the first footing. It finishes after the last rail is fixed. Four moments show how permits and inspection dates are used by the office, the site lead and the crew along the way. Each one is a real step in a build.

Preparing the paperwork

Once the deposit is invoiced, the office attaches the drawings and sets the permit status to prepared. Submission follows. The job now carries a visible open item. It cannot be forgotten before the build starts.

Approval comes back

The permit is approved, and the office updates the status. The footings stage becomes workable on the calendar. Until then, the job shows approval as outstanding, so no crew is sent to dig by mistake.

Booking the framing inspection

As joist framing nears completion, the office books the framing inspection and enters the date. The crew can see it. Boarding is held until the inspector has passed the framing and the result is recorded on the job.

Final inspection and handover

When railings are fixed, the final inspection is booked. The pass is written on the job with the date. Handover begins only then. The warranty record is opened for the finished deck, with its terms and first visit date.

Who checks approvals and who acts on them

A permit touches the owner’s risk, the office’s paperwork and the crew’s next move. Each role below reads the same record, whether on the office screen or a handset.

What owners see for permits and inspections

Owners see footing and framing inspections due this week and the decks still waiting on a permit. Risk is easy to read. A deck built ahead of its approval is a risk. This view shows it early, while the date can still move.

What estimators and sales see

Estimators see whether a deck they sold is cleared to start, so they can give clients an honest answer about dates. They do not edit approval status. They read it to avoid promising a start too soon.

What the office sees for permits and inspections

Office staff enter permit status, attach revised drawings and book each inspection. They know which footing inspection is booked and which is not. That list is their working list for the day. It stays short.

What site leads and crews see

On a handset, a site lead sees whether the next stage is cleared. Footing, framing and final inspections are shown against the stage. If a sign-off is missing, the crew waits and takes up other work. Nobody has to guess.

Decisions to settle before permit fields go live

Rules differ by region, so the fields are set with you during implementation rather than assumed. A few choices need your answer first. Settle them with GullySystem before the first deck goes on the system.

Who may mark a status

Decide who can set a permit to approved or record an inspection as passed. These entries release the next stage. Keep them with the office or a named person. Crew members read them but do not set them.

What the stages leave out for permits and inspections

Your building authority’s permit stages and inspection checkpoints become the fields on the job. Anything that does not apply to your region is left off. You approve the list of stages. That happens before the first deck goes in.

How running permits come across

Decks already under way are entered with their permit status and the inspections passed so far. Some rows are compared with the original register. Old permits for finished decks are not brought in unless you ask. Choose what you need.

Which report matters first for permits and inspections

Footing and framing inspections due this week is the report to read first. It shows what must be booked or chased. Agree which person reads it on the first working morning of the week. One name is enough.

How permits and inspections touch the other features

Permits and inspections sit between the paperwork and the build. They take drawings and measures from earlier records and hand sign-offs to the calendar. One missed inspection can hold a whole deck. Every other feature reads that fact. The hold shows everywhere, on the calendar and on the job.

  • Site measures feed the drawings for approval
  • Stages on the calendar wait for sign-offs
  • Delayed inspections move crew and lumber dates
  • Passed inspections support stage invoices being raised
  • The final pass opens the warranty record

Where permit and inspection records stop

This feature records what happens. It does not prepare drawings, file anything with an authority or decide whether a deck meets local rules. Those steps stay with the firm, the designer and the building authority. Legal and regulatory advice comes from your adviser. A small firm that builds the odd deck without any permit needs no such records.

FAQ

Frequently asked questions

Does it file permit applications for us?

No. It keeps the drawings, the status and the dates with the job. The application itself is made by your firm, in the way your building authority requires. The system keeps the record. It does not do the filing.

Can crews see which inspection must come first?

On the job a site lead sees footing, framing and final inspections against the stages they belong to. A stage waiting on a sign-off is shown plainly. The crew sees what comes first. Other work waits.

What if our region has extra inspection steps?

The inspection checkpoints are set with you during implementation. Extra steps are added as fields on the job record, each with its own date. You approve the list of stages before the first deck goes in. Nothing is missed.

Can we attach a revised drawing later?

A revised drawing is attached beside the earlier one, and both stay on the job. The current set is easy to find. Crews on site open the latest version. A stale print in a truck is no longer a risk.

How do I see inspections coming up this week?

Open the report of footing and framing inspections due this week. It lists each deck and the date. Any inspection with no date shows as unbooked. The office can then chase it before the crew is due.

Where it fits

How this feature fits the system.

Deck Contractor Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

Enquiries and site visits

Every deck enquiry is logged with its source and address, the site visit is booked, and measures and photographs stay on the client record.

Lead Management

Quotations and rate lists

Quotations are priced by area from the firm’s own board, framing and railing rates, with each revision kept beside the one before it.

Estimate/Quotation Management

Supplier orders and deliveries

Orders to decking and lumber suppliers are raised against a job, so the quantity, board colour and delivery date are written down in one place.

Purchase Order Management
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements