Skip to main content
GullySystem

Recording each client’s deck material choices

At the first meeting a client picks a composite or timber board, a colour, a baluster style, post caps and perhaps lighting. This feature saves those choices on the deck record. They travel from the quotation into the supplier order, so the order is not raised from memory.

What a material selection record holds

A selection is a short list of decisions that the client makes, each one tied to a line on the quotation. It is a plain record. Together the entries say what the finished deck will look like and what the supplier must send to site.

Board type and colour

The record names the composite or timber board and the colour the client chose, with the range it belongs to. A colour that is later swapped replaces the entry. The earlier choice stays visible beside it.

Baluster style and railing

Baluster style and the railing finish are noted against the railing run on the quotation. Where a client wants a plain rail on one side and a feature rail on the other, both are written down. Neither is guessed.

Post caps and lighting

Post cap style and any lighting the client asked for are saved as their own entries. Each has a quantity that matches the post count and stair run. The office reads them when the order is raised. Counts are never guessed.

Who chose and when

Each selection carries the date it was made and the name of the person who recorded it. If a client changes their mind, the change is dated. A dispute over colour has a record behind it. Dates settle the question.

From first meeting to delivered boards

Material choices are made early and checked late. That gap is where mistakes creep in. Between those two points the same entries are read by the estimator, the office, the supplier’s delivery driver and the crew. These four moments follow one deck through that path.

The first meeting

Sitting with the client, the estimator shows board samples and records the choice there and then: board, colour, baluster style, post caps. The entries are saved on the client’s page. They appear on the quotation.

A change of colour

A week later the client prefers a darker board colour. Estimators edit the selection, and the quotation shows a new version. The first colour is kept beside the second one. The price difference is plain to see.

The order is raised

Office staff open the accepted quotation and raise the supplier order. Board, colour, balusters and post caps arrive on the order lines already filled in. Nobody types them from memory. The list is already right.

The delivery arrives

When boards are unloaded, the crew checks the colour against the selection on the job. One board colour awaiting confirmation can be flagged before anything is cut. A wrong colour is caught at the gate.

Who reads the choices and how

A material choice matters to the client first. It then matters to a chain of people who turn it into lumber on a truck. Each role below reads the same entries but acts on them differently.

What owners see for material selections

Owners see the selections attached to each live job and any deliveries with a colour still to be confirmed. That is useful when a client is hesitating. A job held up by an undecided colour shows plainly.

What estimators and sales see

Estimators record the choices at the first meeting and revise them when a client changes their mind. They see the earlier version beside the current one. The quotation follows the new selection each time, whoever made the edit. History is kept.

What the office sees for material selections

Back-office staff read the selections when raising the supplier order and again when a delivery is ticked off. They check that the colour delivered is the colour chosen. Any difference is written on the delivery note.

What site leads and crews see

A site lead opens the job on a handset and reads board type, colour, baluster style and post caps before unloading. It is a quick check. A wrong delivery is raised before boards are fixed down.

Decisions to settle before selections go live

Selections are simple records. A few rules decide how reliable they are. Settle these with GullySystem before the first live deck. Write them down for the estimators and the office.

Who may change a choice

Decide whether an estimator may alter a selection once the quotation is accepted, or whether the office must approve it. After supplier orders are raised, a change affects money. Name the person who signs it off.

What the record leaves out for material selections

Choose which wishes are not recorded as selections, such as a verbal hope for a finish missing from the rate list. Leave them out. The entries then stay in step with what can be ordered.

How earlier choices come across

Selections on running jobs can be copied from your job register or spreadsheet. Some rows are checked against the originals first. Finished decks need no selection record at all, only the warranty details. Leave them out.

Which report matters first for material selections

Lumber, composite boards and hangers ordered, delivered and used by job is the first view to watch. It shows whether what arrived matches what was selected. Agree who reads it. Do this before the first delivery.

How material choices reach the rest of the product

Selections are written once and read again and again. They begin on the quotation, pass to the supplier order, appear again at delivery and are visible to the crew on site. A change made in one place shows in every other place. Nobody holds a stale copy.

  • Choices are first entered during the quotation
  • Supplier order lines are filled from the selections
  • Deliveries are checked against the chosen colour
  • Crews read the selections on the job record
  • Change orders cover swaps made after approval

Where material selections stop

This feature records what the client chose. It does not hold the physical sample, and it does not know whether a supplier has a colour in stock. Manufacturer guidance on fading, weathering and care stays with the manufacturer. Whether a choice suits the site is a call for the builder and the client. A client who picks only one board and one rail needs little more than a note.

FAQ

Frequently asked questions

Can a client change the board colour after the quotation?

Yes, before the order goes out. Edit the selection and save the quotation again. The earlier colour and price stay on file beside the new one. Once orders are raised, a change order records any extra cost.

Do selections reach the supplier order automatically?

The chosen board, colour and baluster style travel from the quotation onto the order lines. The office checks the lines and sends the order to the supplier. Nothing is retyped from an email or a note. Each line stays exact.

Can lighting and post caps be recorded too?

Yes, both are recorded. They are kept as separate lines. Composite or timber board, colour, baluster style, post cap and lighting each have their own entry. Quantities follow the post count and stair run. The order then matches the deck.

How does the crew check a delivery against choices?

A site lead opens the job on a handset and reads the selected board, colour and balusters. The delivery is ticked against the order. A mismatch is noted on the delivery before boards are cut.

Are samples or photographs of choices stored?

Photographs can be attached to the client’s page like any other site picture. The system holds your description of the sample. It cannot hold the sample itself. Physical samples stay with the estimator or the client.

Where it fits

How this feature fits the system.

Deck Contractor Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

Enquiries and site visits

Every deck enquiry is logged with its source and address, the site visit is booked, and measures and photographs stay on the client record.

Lead Management

Quotations and rate lists

Quotations are priced by area from the firm’s own board, framing and railing rates, with each revision kept beside the one before it.

Estimate/Quotation Management

Supplier orders and deliveries

Orders to decking and lumber suppliers are raised against a job, so the quantity, board colour and delivery date are written down in one place.

Purchase Order Management
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements