Skip to main content
GullySystem

Gates and hardware records for fencing firms

A gate is the part of a fence that is handled every day. This feature records the width, leaf type, hinges, latch and drop bolt fitted at each opening. A sliding gate keeps its track length too. A later repair then starts with the right part in the van.

What a gate and hardware record holds

Each opening on the fence has its own entry. It names the gate, the leaf and every fitting on it, as fitted on the day, not as quoted. It is short, yet a repair depends on each line. Four details matter.

Gate width and opening position

The width of the opening is recorded with its place along the run, such as beside the lane. A double gate holds two leaves. The position helps a fitter find the right gate on a long boundary.

Leaf type and frame

The leaf type is entered in the trade’s words, such as a close-board leaf, a mesh leaf or a steel frame. A pedestrian gate and a vehicle gate differ. The entry says which one stands at each opening.

Hinges, latch and drop bolt

Each fitting is listed as fitted, namely the hinge set, the latch and the drop bolt, each with its size or type. Hinge bolts are noted too. A repair visit then starts with the same part, not a guess.

Track length for a sliding gate

A sliding gate also keeps its track length. The figure is stored beside the opening width and the leaf type for that gate. Repair work then begins with the track in mind, not a tape measure.

Gate details through a fencing job

Gate details are first noted at the site visit and priced in the quotation. The crew then fits them, and a repair call may recall them years later. From one moment to the next, the entry carries them. Four such moments follow.

Measuring the farm gateway

At a farm, the estimator measures the gateway and notes that it needs a double gate. Width and position go onto the file. The quotation adds the gate and its hinge set as separate lines.

Fitting the gate on the day

The crew hangs the leaf and fixes the latch and drop bolt. The leader notes what was actually fitted. A part may change on site, and the record then shows the true fitting, not the quotation.

A repair call on a sagging gate

A client rings about a sagging gate that drags on the ground each time it opens. The office opens the fence and reads the leaf type, hinge set and width. The right hinge bolts go in the van.

Adding a sliding gate to a run

A school asks for a steel sliding gate at the front entrance, with a run of mesh beside it. The track length is recorded with the gate. The record stays on the file for any later call.

Who reads the gate record and why

Whoever has to bring the right part to a site needs the gate details. That person is not always the one who wrote the record. Each role reads a different line. Four roles are covered.

For estimators

Estimators record the width of each opening and the gate type wanted, and note the posts either side. The same details feed the quotation. Their notes decide which gate and hinge set the crew meets on site.

For crew leaders

Leaders confirm each fitting from a phone once the gate is hung. If a latch or hinge differs from the order, they correct the record before leaving the site, and add a short reason. That keeps the file true.

For the office

Office staff take the repair call and open the original fence. They read the gate record and tell the fitter which hinge set and latch to load. A missing detail is added after the visit.

For yard staff

Yard staff read the record to pick the right hinge set, latch or drop bolt from stock before the van is loaded. They issue the parts against the repair job. Unused fittings come back with a note.

Gate record decisions before set-up

Gate records reward early agreement on wording. Settle four choices with the lead estimator and a crew leader, so that details stay comparable from the first job. Write the answers on the first page of the rate list.

Who may edit a fitted gate

Decide whether only the crew leader may change what was fitted, or whether the office may correct it later. The repair part is chosen from this entry. A wrong entry sends a wrong part. Name the person who holds that right.

What is left out of the record

Choose the fields that matter to a repair visit and leave out the rest. Width, leaf type, hinges, latch, drop bolt and track length are the core. Paint colour and screw counts clutter the entry.

How older gates come across

Gates fitted before the first day of use are not in the record. Decide whether to key in only the gates under warranty or every gate on running jobs. Others can wait for a call.

Which gate list matters first

Pick the first look at gate trouble. Agree who reviews it. Fence types ranked by repair calls shows where repair calls gather. Gate entries then explain why, down to the hinge set and the latch.

How gate records link to other features

Details of each gate start at the visit and end at a repair call. Along the way they feed the quotation, the job sheet, the yard stock and the repair ticket. Each handover is a line below. The gate entry is written once. Fitters and the office both rely on it.

  • Gate lines come from the quotation by run
  • Hinge sets and latches are issued from yard stock
  • The fitted gate is recorded on the job sheet
  • Repair tickets open with the gate entry beside them
  • Fittings used on repairs are booked back to the job

What gate records do not cover

The record holds what was fitted and where. It does not test a gate, certify a safety rating or decide whether an automatic gate meets local rules. Those checks stay with the installer, the maker and any adviser the client uses. The motor and controls of an automatic gate sit outside this record. A lone installer fitting very few gates can note them on the invoice.

FAQ

Frequently asked questions

Where does the track length of a sliding gate go?

It is kept with the gate entry for that opening, beside the width and leaf type. The fitter then knows how much track to expect before the van leaves the yard. No tape is needed first.

What if the gate fitted differs from the quotation?

The leader records the part actually fitted, and the entry shows it, with a short note on why the part changed. The quotation keeps the figures the client was given. Any repair call reads the fitted entry.

Does the record cover automatic gate motors?

It keeps the opening, leaf, hinges, latch and drop bolt. A motor, control box or remote sits outside it. A free note can say that an automatic gate was added. Servicing those parts stays with their supplier.

How does a repair visit use the gate entry?

The office opens the fence the call is about and reads the gate line before anyone sets out. The fitter loads the matching part. The part used is recorded on the repair ticket once the visit is done.

Are drop bolts and latches worth recording?

Yes, because they are small parts and a repair visit is easily sent out without the right one. A missing latch size means a second trip to the yard. Entering them at fitting avoids the trip.

Where it fits

How this feature fits the system.

Fencing Contractor Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

Enquiries and site visits

Each fence enquiry is logged with source and address, the site visit is booked, and run measurements and boundary photographs stay on the client record.

Lead Management

Quotations by run and gate

Quotations are priced by the metre from the firm’s rates for each fence type, gate and fitting, and every revision stays in the open list.

Estimate/Quotation Management

Fence jobs and crew schedule

A job sheet gathers the runs, gates, material and crew for one fence, with locator marks and boundary notes the leader reads before digging.

Work Order Management
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements