Skip to main content
GullySystem

Home services · Software for fencing contractorsKeep fence runs, gates, material orders and crew days on one record per job.

Fencing software for contractors holds each fence as one job. The job carries its measured runs, the posts, panels, rails and gates priced for it, the crew days spent installing, and the invoices raised. Boundary notes and utility marks stay with the job. Repair calls after installation are logged against the same fence.

At a glance

A fencing contractor prices by the run. Length, height, material and number of gates decide the quote. Once it is accepted, the crew sets posts, hangs panels and hinges gates on site. Height changes the price. A crew that finds a disputed boundary, a marked cable or a steeper slope than the quote assumed loses the day, and the office needs to know before booking the next job.

Jobs are short. They are also numerous. Paperwork slips, and a missed gate or an unrecorded extra length of rail only shows up when the customer queries the final invoice weeks afterwards. The software keeps each fence as a record that the office and the crew leader both read. Share your requirements, and one fence is traced from its first visit to its final invoice so the record fits how your crews work.

How the work runs today

An enquiry comes from a homeowner, a farm, a school, a builder or a facilities manager. An estimator walks the boundary and measures each run, notes slopes, corners and obstacles, and marks where gates will sit. The client has to confirm the boundary line with a neighbour or a survey before the estimator can commit to a final length and the posts it needs. The quotation lists posts, rails, panels or mesh, concrete, gates, hardware and labour, priced from supplier rates.

After approval, material is ordered and delivered, or taken from stock. A crew sets posts, hangs panels and fits gates, and a dry day with ground clear of rock, roots and old footings keeps it to one visit. Some jobs ask for removal of an old fence first, which means a skip, a second crew visit and a disposal charge that the quotation has to carry from the start. Disposal costs follow. Slopes add time, and a long run over uneven ground can need extra posts, stepped panels or a raking fence that the first measure never allowed for. Utility locations are checked before any post hole is dug. Gas first. Water next. Then power. The invoice follows the finished run, with a deposit taken earlier on larger jobs. Storm damage and vehicle impacts bring repair calls, each priced separately.

Where it breaks

What goes wrong for fencing contractors without a proper system.

Runs are measured once and retyped at every step

Length, height and gate positions are noted in the field. The quote, the order and the crew sheet each carry a copy, and a copy can drift from the original.

Material is ordered by the pallet without a check

Panels, posts and rails arrive in counts that suit the supplier. When the crew runs short, nobody can say which job used the balance.

Boundary and utility notes are not with the job

A client agrees the line, and a locator marks a cable. Both facts sit in a message or on a card. Neither is on the work order.

Short jobs hide labour cost

A crew may finish several fences in a week. Hours are written down when the van is parked, if at all. The cost of one job is not known.

A leaning post has no history

A client rings about a leaning post. The office cannot say which crew installed it, what concrete was used or whether the work is still covered.

What changes

What fencing contractors gain from one system.

Not a feature list. These are the moments in the working day that go differently once the records sit together.

Measured runs entered once

The estimator measures each run, notes slopes and corners and marks the gates once. Quotation, material order and crew sheet all draw from those measurements. Retyping stops. The installer sees the same lengths the client was quoted. One measurement serves all. A wrong length is caught once, not at the pallet.

Material ordered to the quoted run

Posts, panels, rails and gates are ordered against the job. Stores sees what is already in the yard before another pallet is bought. The supplier gets one order. Leftover stock is credited to the next job. Overbuying is spotted before the order is placed, not after.

Boundary and utility notes kept with the job

The boundary line confirmed with a neighbour and the utility marks stay in the job record. The crew reads them on site. A disputed line is settled with the note and a photograph. Final lengths are committed knowingly. Nobody on site is surprised by a buried cable.

Short jobs with their true labour days

Crew days are recorded against each job, however small. The owner sees which small repairs cost more labour than they earned. Pricing for the next quote reflects that record. Invoices, deposits and receipts follow the job. Quotes for small jobs are then built on recorded days, not hope.

Repair history for a leaning post

A repair call after installation links to the original job. The office sees the post, the date, the gate and the warranty status. The crew arrives knowing what was fitted. Callbacks are answered with facts. The warranty question is answered before the crew leaves the yard.

What the software does

What we would build for fencing contractors.

Named the way your team already talks about the work. We start with whichever part the audit shows is costing you most.

Site visits and measured runs

Log each enquiry, schedule the visit, and record the length, height, slope, gate positions and photographs for every run.

Quotations by run and gate

Price by the metre or foot from your own rates for each fence type, plus gates, hardware and removal of the old fence.

Material orders and stock

Order posts, panels, rails and fittings against a job, record what arrives, and keep a count of items held in the yard.

Installation jobs and crew schedule

Plan each job on a crew’s calendar, with site notes, utility marks and the client’s boundary confirmation attached.

Invoices, deposits and receipts

Raise a deposit and a final invoice from the quoted total. Post each receipt and keep the balance owed by every client.

Repairs and warranty record

Raise a ticket for each repair, link it to the original fence and show the materials and crew behind it.

Boundary consent record

The client’s confirmation of the boundary line, with the neighbour’s agreement or the survey note, is filed against the job. The estimator sees whether the line is settled before final lengths are priced. Disputes are dated.

Gate and hardware register

Every gate on a job lists its width, type, hinges, latch and any automation. Orders go to the supplier from this list. Installers check the fitting against it.

Site photos and sign-off

Photos taken before, during and after each fence run are filed with the job. The client signs off on completion. Disputes about line or height are answered from these pictures.

Concrete and delivery schedule

Concrete, posts and panels are booked to arrive on set days at each site. Crews see what lands and when. A missed delivery moves the next day’s plan.

Before you talk to a supplier

A requirements checklist for fencing contractors.

What to cover, which reports to ask for and what to put to every vendor, ready to print or save as a PDF.

Open the checklist
Solutions inside

The business modules fencing contractors use most.

Each one is also available on its own, or inside a system built for you.

Lead Management

Enquiries from homeowners, farms, schools and builders are logged with the fence type and the site address. A site visit is booked from the lead. Quotes not answered are chased.

Learn more

Estimate/Quotation Management

Measured runs, corners and gates go in, and posts, rails, panels and labour are priced from supplier rates. A slope or obstacle changes the line. Clients see the quote run by run.

Learn more

Work Order Management

After approval, an install job is issued with the runs, post counts, materials and crew days. Crew leaders tick off runs finished. Extras requested on site are added to the same order.

Learn more

Purchase Order Management

Posts, rails, mesh and concrete are ordered against the job from the approved quote. Supplier prices are compared before placing the order. Deliveries are matched against what was ordered.

Learn more

Stock Tracking and Alerts

Spare posts, gate hardware and fixings in the yard are counted by size. Low rail stock triggers a reorder. Surplus from a finished job returns to the shelf.

Learn more

Attendance & Time Tracking

Crew days are logged against each fence job, with start and finish times. Day rates for casual labourers are recorded. Actual days sit beside the quoted days for each job.

Learn more

Invoice Management

A deposit is invoiced at approval and the balance on completion. Extra runs and gate upgrades appear as separate lines. Payments settle the invoice they were paid against.

Learn more

Ticket Management

A client reports a panel that has blown loose after a storm. The ticket records the fence, the age and the warranty status. A repair visit is booked from it.

Learn more
AI by department

Where AI can help fencing contractors.

Each one reads records you already keep, and a person approves every decision.

Services

The services behind it.

How it works

How the work runs from Bengaluru for your city.

  1. 1

    The audit, by call

    A screen-share and a look at the sheets, accounting reports and WhatsApp groups your team uses. No travel needed.

  2. 2

    A written proposal

    Scope, what we build first and the cost, agreed in writing before anything starts.

  3. 3

    Build in short rounds

    Working screens shared every few weeks. Your team tests them from your own office.

  4. 4

    Go-live, in person when it helps

    For data migration and training we can come to your city. Travel is agreed in advance.

  5. 5

    Support online

    Fixes, changes and hosting handled remotely by the same team that built it.

Make an informed decision

Check the difficult cases before choosing software.

Use examples from your own records to test the workflows that matter in your business.

Invoices, deposits and receipts

Can the same receipt be allocated without counting the money twice?

Take an unallocated amount in “Invoices, deposits and receipts” and apply it to the intended balance. Review the remaining amount and the original receipt reference together.

Background reading: ERPNext: payment allocation

Quotations by run and gate

Which assumptions stop being valid when the quotation changes?

For “Quotations by run and gate”, compare an accepted version with a later revision. Identify changed quantities, exclusions and validity dates before the revised amount is used downstream.

Background reading: ERPNext: quotation terms

Common questions

Questions fencing contractors ask before they call.

Can one job hold several fence types?

Yes. A property might need a timber run at the back, mesh along a side and a metal gate at the front. Each run has its own measurements and rate. All of them roll up into one quotation.

Can the crew see their jobs on a phone?

Yes. On a phone, the crew leader opens the day’s fences, reads the site notes and marks each job done. The office sees the update without a phone call.

Does it track the stock held in our yard?

Yes. Posts, panels and rails coming in, going out to jobs and coming back are all recorded, with reorder levels for the sizes you use most. A stock count can be keyed in to correct the figures.

Do small fencing firms need it?

Not always. One crew with a handful of jobs a month may get by on a notebook and a spreadsheet. A firm with several crews, mixed timber, mesh and metal work, and a quote book that keeps growing will notice the difference within a few weeks. Notebooks stop coping.

What makes one fencing quotation differ from another?

Base size depends on how many crews, estimators and office users there are. Measured runs, material orders, yard stock, crew schedules, deposits and repairs are modules, each priced apart. Linking an accounting package adds scope, and so does carrying over past customers. Ask for any module to be left out.

What should a fencing firm bring first?

Gather a few measured run sketches, a supplier price list, a sample quotation, the yard stock count and a repair or warranty note. An estimator and a crew leader should have time to look at the screens. That is all.

If we stop, do we keep measured runs and warranty history?

Yes. Code and records belong to the firm, and runs, quotations, jobs, invoices and repairs leave as ordinary files whenever the firm wants them. Support carries on from the developers, and GullySystem hosts it unless another arrangement suits you better, and they answer questions about the quotes and jobs held there.

What happens after I share my requirements?

We review your brief and clarify the work with you. We then look at the software, spreadsheets and WhatsApp groups your business runs on today and write down what works, what slows your team down and what is missing. A demo login, a screen-share or a few screenshots are enough. You get a short written summary ordered by priority, with no obligation to hire us afterwards.

How much will the software cost?

We don’t publish a price, because it depends on what the system has to do. That first review settles the scope, and the cost goes into a written proposal before any work starts.

Category

Part of a wider group.

Talk to us

Tell us how your business runs today.

A few lines on your spreadsheets, software and WhatsApp groups is enough. We reply the same working day.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements