Skip to main content
GullySystem

Home services · Software for remodelling contractorsHold every selection, change order and trade visit on one project record.

Remodelling contractors rebuild kitchens, bathrooms, basements and whole interiors for homeowners who are living through the work. The software holds each project with its estimate, tile and cabinet selections, change orders, trade schedule and payment draws. The client sees what was agreed, and the office sees what has been spent against it.

At a glance

A remodel is a small construction project inside somebody’s home. The scope shifts when the drywall comes off, the client swaps a backsplash tile, and three trades want the same room in the same week.

Most firms hold this scattered across an estimate file, a text thread, a supplier portal and a notebook left on the dashboard of the site truck. When a dispute starts, nobody can show which version of the scope the homeowner actually signed.

How the work runs today

A homeowner asks for a new kitchen, a bathroom, a finished basement or a rear extension. The firm visits, measures, discusses a budget and prepares an estimate with allowances for items the client has not yet chosen, such as tile, vanities and cabinet doors. After contract signing, the office orders long lead items and books the trades. Demolition comes first. Then framing, plumbing and electrical rough in, inspection, insulation, drywall and trim.

Every week brings small decisions. Midway, the client picks a quartz worktop instead, the plumber finds galvanised pipe behind the wall, or the building inspector asks for blocking in the stud bay. Each is a change order that needs a price and a signature before work continues. Payment is released in draws as stages finish. At the end a punch list is walked and signed. Warranty calls follow months later.

Where it breaks

What goes wrong for remodelling contractors without a proper system.

Change orders live in text messages

A client says yes on the phone and the carpenter carries on. At final payment the homeowner remembers a different figure for the moved doorway.

Selections run late

A custom cabinet takes weeks to arrive and the client has not yet chosen the pulls. The finish carpenter waits, and the schedule slips without a record of why.

Allowances are spent without a running total

Tile, light fittings and plumbing fixtures are each given an allowance. Nobody adds up what the client has actually chosen until the closing walk.

Trades collide in the same room

The electrician, the plumber and the tiler are booked separately by phone, so one of them arrives to find the room still full of another trade’s unfinished work. Hours are lost.

Costs and billing sit apart

Lumberyard bills, trade invoices and client draws sit in different files. Profit on a job is known only after it has closed.

What changes

What remodelling contractors gain from one system.

Not a feature list. These are the moments in the working day that go differently once the records sit together.

Change orders signed before the work starts

When a homeowner asks to move a vanity or add recessed lights, the change order is priced and signed on the project record. The crew sees the approved version. Nobody starts demolition on a text message, and the final bill matches what the client agreed.

Allowances tracked as they are spent

Tile, vanity and cabinet allowances show the amount set in the contract and the selection made so far. The project manager tells the homeowner before the shower tile exceeds its line. Surprises arrive early, while the choice can still be changed. Late choices show in red.

Selections chased before they delay the trades

Each selection has a due date tied to its lead time and the day a trade needs it. The office sees which choices are late and which room will stall. The homeowner receives one list of what is outstanding instead of four reminders from four people. Nobody learns it at demolition.

Trades booked so they stop colliding

The schedule holds plumbers, electricians, the drywall crew and the tile setter by room and day. A rough-in inspection that slips pushes the following trades with it. The project manager sees the clash before two crews arrive in the same bathroom. The clash shows first.

Job cost beside the draw schedule

Purchase orders, trade invoices and labour sit against the project’s budget, next to the draws billed. The owner sees whether the kitchen is running ahead of or behind its payments. A draw request leaves when the stage is complete and the cost is known. Costs and payments meet.

What the software does

What we would build for remodelling contractors.

Named the way your team already talks about the work. We start with whichever part the audit shows is costing you most.

Consultations and estimates

Log each enquiry and measure-up visit, then build an estimate from your own cost items with allowances for choices still to be made.

Selections and allowances

Record each cabinet, tile and fixture the client picks, with its price and lead time, and see what remains of every allowance as the list fills.

Contracts and change orders

Hold the signed scope and every change order with its price and approval, so the contract value is always the current figure.

Trade and project schedule

Lay stages on a calendar, book each trade into the sequence, and move the dependent stages when an inspection slips.

Purchase orders and deliveries

Order lumber, cabinets and fixtures from suppliers, record what arrives and what is damaged, and match each delivery to the project.

Daily logs and site photographs

Record who was on site, what was done and what was found behind the wall, with photographs attached. A client can be shown the file.

Draws, invoices and job costing

Bill each stage draw under the contract, post what clients pay, and set actual cost beside the estimate while the project is still under way. The margin is visible early.

Permit and inspection tracker

Every permit is logged with its application date, the inspector’s visits and the result. The project manager sees which inspection holds up the next trade. Failed items get a fix list.

Punch list and handover

At the end the client and site lead walk the home and list small fixes by room. Every fix names a trade and a date. Final payment waits for the list to close.

Warranty and service calls

A cracked grout line after handover is logged against the project, the trade and the warranty end date. The office books the return visit. Past claims stay on file.

Before you talk to a supplier

A requirements checklist for remodelling contractors.

What to cover, which reports to ask for and what to put to every vendor, ready to print or save as a PDF.

Open the checklist
Solutions inside

The business modules remodelling contractors use most.

Each one is also available on its own, or inside a system built for you.

Lead Management

Homeowners asking about a kitchen, bathroom or basement are logged with the room, the budget and the preferred start. The consultation is booked from the same record. Lost leads keep the reason given.

Learn more

Quote & Proposal Management

The proposal lists demolition, framing, plumbing, electrical, tile and cabinets, with allowances for items the client has not yet picked. Options are priced as add-ons. A signed version is locked.

Learn more

Workflow and Approvals

A change order, such as moving a sink or adding a window, goes to the homeowner for a signature before the crew starts. The project manager sees which approvals are pending. Work on that item waits.

Learn more

Project Timelines with Gantt Charts

Demolition, rough in, inspection, drywall and trim are laid out as bars, with the cabinet delivery date marked. A late tile order moves the tiler. The client sees the new finish date.

Learn more

Purchase Order Management

Cabinets, vanities, tile and fixtures are ordered against the job, with the supplier’s lead time and the delivery address. The site lead sees what has arrived. Backordered items show against the schedule.

Learn more

Project Document Management

Signed contracts, permits, floor plans, selection sheets and subcontractor invoices sit in each home’s folder. The office finds the approved drawing for a bathroom wall. Photos of hidden pipework are kept.

Learn more

Invoice Management

Draws are invoiced at agreed stages, such as demolition done or cabinets installed. Every draw shows any amount held back until the punch list clears. Receipts are matched to the right draw.

Learn more

Client Portal

The homeowner signs in to see the schedule, the selections still due, the change orders waiting and the photographs from site. Questions go to the project manager. Nothing is lost in text messages.

Learn more
AI by department

Where AI can help remodelling contractors.

Each one reads records you already keep, and a person approves every decision.

Services

The services behind it.

How it works

How the work runs from Bengaluru for your city.

  1. 1

    The audit, by call

    A screen-share and a look at the sheets, accounting reports and WhatsApp groups your team uses. No travel needed.

  2. 2

    A written proposal

    Scope, what we build first and the cost, agreed in writing before anything starts.

  3. 3

    Build in short rounds

    Working screens shared every few weeks. Your team tests them from your own office.

  4. 4

    Go-live, in person when it helps

    For data migration and training we can come to your city. Travel is agreed in advance.

  5. 5

    Support online

    Fixes, changes and hosting handled remotely by the same team that built it.

Make an informed decision

Check the difficult cases before choosing software.

Use examples from your own records to test the workflows that matter in your business.

Consultations and estimates

Which assumptions stop being valid when the quotation changes?

For “Consultations and estimates”, compare an accepted version with a later revision. Identify changed quantities, exclusions and validity dates before the revised amount is used downstream.

Background reading: ERPNext: quotation terms

Costs and billing sit apart

Can you explain the balance from its original documents?

Select a partly settled example in “Costs and billing sit apart”. Ask for the invoice, allocated receipts and remaining balance to be shown together before agreeing the opening figures.

Background reading: ERPNext: outstanding invoices

Common questions

Questions remodelling contractors ask before they call.

Can clients approve change orders online?

Yes. Each change order goes to the homeowner with its price and its effect on the programme, and their approval is dated and kept. The contract value updates when it is accepted.

Does it handle design and build work?

Yes. Design drawings and selections are attached to the project record alongside the estimate. Drawing and modelling software itself is not part of the system.

Can we see profit while a job is running?

Yes. Supplier bills, trade invoices and labour are recorded against the project, so cost can be read beside the contract value and the amount billed so far.

Can trades see their own bookings?

Yes. Each tradesperson opens their own dates and site addresses on a phone, then accepts the booking or turns it down with a reason the office can read. The office does not chase each one by phone.

How is a remodelling firm quoted?

Live jobs, trades with logins, and the client portal for change orders all shape it. Purchase orders and job costing are separate parts. One of your kitchen estimates, allowances included, is demonstrated, and costs follow.

What does a remodeller need to hand over to start?

Gather an estimate with allowances, a selections list, a signed contract with change orders, a trade schedule, daily logs and a draw invoice. Name a project coordinator and a site lead to review. Remodelling contractors start with real paperwork.

Do job costs and change orders stay ours on exit?

Estimates, selections, schedules, daily logs and draws are the contractor’s data, available as open files. The remodelling contractor holds the code. Those who built it stay on for repairs.

What happens after I share my requirements?

We review your brief and clarify the work with you. We then look at the software, spreadsheets and WhatsApp groups your business runs on today and write down what works, what slows your team down and what is missing. A demo login, a screen-share or a few screenshots are enough. You get a short written summary ordered by priority, with no obligation to hire us afterwards.

How much will the software cost?

We don’t publish a price, because it depends on what the system has to do. That first review settles the scope, and the cost goes into a written proposal before any work starts.

Category

Part of a wider group.

Talk to us

Tell us how your business runs today.

A few lines on your spreadsheets, software and WhatsApp groups is enough. We reply the same working day.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements