Job Costing and Reports for Remodelling Contractors

Job costing sets actual cost against the estimate while a remodel is still open, by cost item and by trade. Supplier bills, trade invoices, labour, dumpster hire and permit fees all land on the project. Owners read where a kitchen is running over before the final draw, not after it.

Who reads cost against estimate, and when

Cost figures are read by the owner for margin, by the project manager for control and by the estimator for next time. They read different cuts of the same numbers. Nobody should rebuild them from a pile of bills.

For owners watching margin

Owners open actual cost against estimate by project and see which jobs are tracking and which are over. A kitchen can look fine until cabinets, a dumpster and a permit land together. The view shows it early.

For project managers controlling a job

The project manager reads cost by trade while the project is open and sees that the plumbing is already past its estimate. A change order or a talk with the trade follows. Control starts while there is time.

For estimators correcting the next quote

Estimators compare estimate and actual by cost item after a job. If tile labour ran over on several jobs, the rate for that cost item is reviewed before the next proposal goes out. Pricing follows evidence.

For the office posting costs

The office posts supplier bills, trade invoices and fees such as the dumpster and the permit to the project and its cost item. A bill filed apart from its project leaves a gap in the figures. Posting closes the gap.

Cost lines, trade totals and variance figures

Costing is a comparison. Each figure needs two sides. The estimate gives one, and everything paid or owed on the project gives the other. The record keeps both at the level of the cost item and the trade, so the difference can be traced.

Estimate figures by cost item

The estimate’s cost items and quantities become the baseline for each project, from demolition to trim, as counted at takeoff. Allowances and the contingency line sit in it too, each as its own row. The baseline does not drift.

Actual costs posted to the project

Supplier bills, trade invoices, labour hours and fees are posted against the project and a cost item. Dumpster hire and permit fees count like any other line. Each posting names its source and its date.

Variance by item and by trade

The difference between estimate and actual is shown by cost item and by trade. That view is there while the project is open, so a problem shows before the next stage starts. A figure above or below sits against each line. Reading it is quick.

Reports that draw on other features

Cost is one of several reports. The others read change orders, allowances used, deliveries late or damaged, draws and retainage, and open punch list items. Each pulls from its own feature. Reports can be read side by side.

Reading a kitchen job while the project is open

Profit on a remodel is decided in the middle, not at the end. By the time the final draw is paid, nothing can be changed. A cost view read during the job lets the firm act. Here are four moments in one kitchen.

Cabinets land and the bill is posted

The cabinet bill is posted against the cabinet cost item for that project. It is higher than the estimate, because extra filler panels were needed. The line moves. The estimator sees it and notes the reason.

A second dumpster is hired

Demolition produces more waste than expected, so a second dumpster is hired. The hire fee is posted to the project. Owners see the waste line pass its estimate and ask why. The daily log answers.

The framer’s invoice comes in under

The framer’s invoice arrives lower than the estimate. The saving appears beside the trade’s line. Owners see where a job is gaining as well as losing, so a small overrun elsewhere is read in context.

Before the final draw is called

Before the last draw is called, the owner reads the project’s cost against estimate in full, by cost item and by trade. A permit fee still unposted is found. The figures are corrected, and the project closes on real numbers.

Cost codes and posting rules to fix first

A costing view is only as good as the habits behind it. Cost items and posting rules decide what the owner can read. Fix them before the first project is posted. The estimators should be beside you.

Whether estimate and cost share one code list

Use the same cost items for estimating and for posting actual cost, so the two line up. If the estimator says tile and the office posts flooring, the variance means nothing. Match the lists. Keep one name for each item.

Where labour hours are recorded

Decide whether the firm’s own labour is costed by hours on each stage or as a flat allowance. A crew’s time left unposted makes the project look cheaper than it was. Choose one method for every project.

Who posts bills and how soon

Name who posts supplier bills and trade invoices to the project, and how soon after they arrive. A bill left in a drawer corrupts the view. A named person fixes it. Dumpster and permit receipts count too.

How change orders enter the baseline

Decide whether an approved change order lifts the estimate baseline or is read as a separate line. The choice changes the variance an owner sees. A moved baseline hides an overrun that a separate line would show. Settle it with the owner.

Limits of cost figures and project reports

It shows what has been posted. Postings must be complete. It does not capture a bill nobody entered, and a figure is only as good as the entries behind it. It is a management view, not a set of accounts. Statutory accounts, tax filings and audit work stay with the accountant. Judging whether a variance is acceptable stays with the owner. A single small job can be tracked in a notebook.

Cost reports fed from every other feature

Every other feature finishes at job costing. Estimates give it a baseline. Nothing has to be keyed in twice. Purchase orders and trade invoices give it actuals. Change orders move the baseline, and draws show what has been billed against it. The owner reads one comparison.

  • Estimates and proposals supply the cost baseline
  • Supplier orders and bills post to cost items
  • Trade invoices post against the trade and stage
  • Approved change orders move the project baseline
  • Draws and receipts show billing against cost
FAQ

Frequently asked questions

Can we see cost against estimate during the job?

Actual cost is compared with the estimate while the project is open, by cost item and by trade. Nobody waits for final payment. Dumpster and permit fees are included in the comparison, along with labour hours.

Where do dumpster and permit fees go?

They are posted to the project. Each goes against a cost item set up for it, like any other cost. The fees then appear in the comparison with the estimate, and a missing permit fee shows as a gap.

Which reports does the owner get?

Owners read reports on enquiries and proposals, change orders and allowances used. Others cover actual cost against estimate, deliveries late or damaged, draws and retainage, and punch list items open. Each reads from its own records.

Can cost data go to our accountant?

Accounting software export is one of the integrations, so invoices and costs can pass to your books. The fields and the software are settled at set-up with your accountant. Accounts and filings remain the accountant’s work.

What if our own labour is not posted?

The variance misleads. The project then looks cheaper than it was. The firm decides how its own crew’s time is recorded, by hours on each stage or as an allowance. The system shows only what is posted.

Where it fits

How this feature fits the system.

Remodelling Contractor Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

Leads and consultations

Each homeowner enquiry is logged with its source, rooms and budget, and the site visit notes and photographs stay with the prospect.

Lead Management

Estimates and proposals

An estimate is built from your cost items and takeoff quantities with allowances for open choices, then sent as a proposal with every revision kept.

Quote & Proposal Management

Contracts and change orders

A change order goes to the client with its price and schedule effect, and nothing proceeds until the approval is recorded with a date.

Workflow and Approvals
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.