Skip to main content
GullySystem

Remodelling Contracts and Change Order Control

A signed scope sits beside every change order, each with its price, markup, effect on the schedule and approval date. When a wall opens and a sistered joist or a moved pocket door appears, the contract value moves only after the homeowner approves. Office staff and owners read one current figure.

Who prices, approves and reads a change order

A change order starts on site and ends with a signature. Along the way it passes through the project manager, the office and the owner. Each of them sees it differently. The homeowner decides it.

For project managers finding the change on site

A wall comes open and shows a rotten sill. The project manager writes the change order with the extra work, the price and its effect on the schedule. Work on that wall waits. Nothing proceeds on a spoken yes.

For the office pricing the extra work

The office adds the cost items and the markup to the change order and sends it to the homeowner for signature. Beside it, the signed contract stays untouched. Totals before and after the change are both visible.

For owners watching change order exposure

Owners read change orders by status and value across every project, then see which sit waiting for the client. Unapproved extras are money at risk. Only what the homeowner has accepted shows in the contract value.

For homeowners approving or declining

The homeowner is shown the price and the effect on the schedule before approving, and the approval date is recorded in the portal. A declined change stays on file as declined. The original scope carries on.

Records kept for the signed scope and each change

The contract is the fixed point. Every change order moves away from it, and the record has to show by how much and on whose say. A site decision needs a date, a price and an approval, or it becomes an argument at final payment.

Signed scope and contract value

The signed scope is held as the baseline, with the contract value and the date the homeowner signed it. Later changes sit beside it and do not overwrite it. The starting figure is never lost.

Price and markup of each change

Every change order carries its own price and markup, built from cost items such as extra framing or a beam. The header that needs a beam is priced as a line. It is never a figure said aloud.

Schedule effect and approval date

Each change states which stages it moves and by how far, such as drywall following new framing for a pocket door. The date the homeowner approved sits beside that. Both facts are on the order, in one place.

Status of every change order

A status such as waiting for client approval or approved sits on each change order, with a value. Open ones are easy to find. A declined change keeps its status too. Reports group them by status and value.

When a wall opens on a remodelling job

Remodelling hides its surprises. Behind the plaster sit rotten sills, an undersized header and a pipe in the wrong wall. The day one appears, the contract needs a companion record. The moments below show how it is built while the crew waits.

Demolition day: the rotten sill

The crew lifts the window trim and finds a sill softened by water. The project manager photographs it, drafts a change order for the repair and tells the homeowner it needs approval. Work at that window pauses.

Framing: a sistered joist

Under the new bathroom floor, a joist is cracked. The estimator prices a sistered joist as extra framing with markup. The schedule effect is entered. Approval from the homeowner follows, and the date goes on the order.

Mid-job: moving the pocket door

At the framing stage the homeowner asks to move the pocket door to the other wall. The change is written, priced and sent. Drywall will follow the new framing, and the schedule shows it. Nobody cuts before the signature.

Month end: reading unapproved changes

At month end, the owner opens the change orders waiting for client approval. Some sit with homeowners. The office rings those clients. Nobody argues price at final payment, because each change already has a date.

Rules to agree before the first change order

Change orders decide the margin. How they are priced and approved should be fixed before the first wall opens. Settle the rules with the owner and the project managers before the first job.

Who may price a sistered joist

Choose whether the project manager can price a change on site or only the office, and which cost items may be used. A quick price on the spot risks missing the markup. A slow one stalls the crew.

Markup rule for extra work

Agree whether change orders carry the original markup or their own rate, and whether it differs for labour and materials. The rule goes in beside your contract wording. Staff then price extra work the same way each time.

Whether work may start before approval

State what happens when a homeowner is slow to sign. Some firms pause the affected wall until the order is approved. Others allow urgent protection work and record it as such. Crews should not guess.

How a declined change is kept

A homeowner may say no to a change. Decide whether the declined order stays on the file with its price and date, who sees it and what the crew is told. Declined orders show later what was offered.

Where change order control stops

The feature records the scope, the change and the approval. Fairness is not its job. It gives no legal advice on contract wording, and a legal adviser settles what a clause means. Tax on extra work follows the settings agreed at set-up. Disputes with a homeowner stay between the firm and an adviser. A job with no changes needs only the signed estimate.

Contract value feeding the rest of the job

A contract and its change orders sit in the middle of the project file. Their total sets the figure that draws are called against, and their effect on dates reaches the schedule. A signed change reaches every desk. One current figure replaces three versions. No desk keeps a private copy.

  • Signed estimate becomes the baseline contract scope
  • Approved changes raise the contract value that draws use
  • Schedule effects move dependent stages and booked trades
  • Added items pass to selections and purchase orders
  • Change values appear in job costing against estimate
FAQ

Frequently asked questions

Does the contract value change when a change order is approved?

The contract value updates when the homeowner accepts the change. A pending change does not alter it. Pending ones are listed separately by status, so the owner reads a figure that includes only what the client has agreed on that project.

Can a change order show its effect on the schedule?

A change states which stages it moves. The schedule reflects it. A pocket door that adds framing pushes the drywall stage, and the trades booked after it. The calendar follows the order, so the new dates are visible to every trade booked.

What does the homeowner see before approving a change?

The price and the schedule effect, with the work described in plain words on the order, before anything is signed. After approval, the date is recorded. A recorded approval replaces a spoken yes that each side remembers differently.

Can a declined change order be kept?

Declined orders stay on file. Each keeps its price and the date the homeowner said no. The report of change orders by status and value still lists it. Later, the firm can show what was offered and what was refused.

How are change orders grouped for the owner?

The report groups them by status and value. Orders waiting for client approval are separate from approved ones. Exposure shows across projects. Any order can be opened from the list to read the work behind it.

Where it fits

How this feature fits the system.

Remodelling Contractor Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

Leads and consultations

Each homeowner enquiry is logged with its source, rooms and budget, and the site visit notes and photographs stay with the prospect.

Lead Management

Estimates and proposals

An estimate is built from your cost items and takeoff quantities with allowances for open choices, then sent as a proposal with every revision kept.

Quote & Proposal Management

Contracts and change orders

A change order goes to the client with its price and schedule effect, and nothing proceeds until the approval is recorded with a date.

Workflow and Approvals
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements