Skip to main content
GullySystem
Home services · Hardscaping Contractor Management Software

One connected system for surveys, quotes, materials, crews and stage bills.

Manage hardscaping surveys, quotations, material orders, crew and plant schedules, variations and stage bills in one system. A job carries its measured areas, deliveries and remaining balance from the first site visit through to final payment. On a phone, a crew leader opens only the day’s own jobs, while the office watches what each one is costing.

  • Your rate list, material catalogue and job types keyed in as you price work
  • Live customers, jobs and outstanding bills brought over from your files
  • GullySystem staff make rate and stage changes on request

Patios, walls and paved yards go from survey to final bill in Hardscaping Contractor Management Software, which GullySystem configures around quotes, material orders, crews and stage bills. Each job carries its measured areas, the materials ordered and delivered, the crews and plant booked and the invoices raised. Variations are priced and approved on the same record.

Where it breaks today

What goes wrong before the software.

Measurements are keyed in twice

Areas, depths and falls go in a notebook on site and are retyped into the quote at the office. The material order is then built from figures that have already drifted.

Bulk deliveries are not reconciled

Tonnes of sub-base, sharp sand and pallets of paver arrive in drops from several suppliers. Delivery notes are filed and never compared with the quote, so a short load goes unnoticed.

Crews and plant are rebooked by phone

Rain moves one job and every other date shifts with it. Mini diggers, dumpers and crews are re-planned in calls, and customers hear late.

Variations are agreed on site

Extra excavation, a changed paver, added steps or a coping stone upgrade are agreed in conversation. The price appears only when the final bill is argued.

Stage bills trail the work

A sub-base is compacted and the stage invoice follows weeks later. Money for work already done stays unpaid.

Job cost is known only at the end

Spoil removal, skip hire, plant hire and labour sit in different places. Whether a patio made money is clear only after the last invoice.

How it runs

How the work flows through it, step by step.

  1. 1

    Enquiry and survey

    An enquiry is logged and a survey booked. Measured areas, depths, levels, falls, drainage and access are recorded with photographs, and the neighbour’s boundary wall is noted.

  2. 2

    Quotation

    A quote is built from measured quantities and your own rates for labour, plant and materials, so a patio or a retaining wall prices from one list. The customer accepts, asks for changes or declines.

  3. 3

    Orders and scheduling

    Aggregates, pavers and kerbs are ordered by job and crews and plant are booked. Delivery dates are planned around the stages of work.

  4. 4

    Build

    Excavation, geotextile, sub-base, bedding, laying and jointing are recorded as stages complete. Weather stops are noted, and the programme is re-planned.

  5. 5

    Billing

    Deposit, stage and final invoices are raised from work recorded. Approved variations are added, and receipts are posted.

  6. 6

    Handover and aftercare

    The customer inspects, snags are closed and the job is signed off. Aftercare visits such as joint sanding or sealing are booked.

Modules

What is inside.

Every module can be switched on, left out or changed to match how your team already works.

Enquiries and site surveys

Record the source of each enquiry and book the survey slot, then log areas, depths, levels, falls, access and photographs against the job. Nothing is kept in a notebook.

Quotations by area and material

Build quotes from measured areas and depths using your own rates for labour, plant and materials, so a driveway or a patio prices from the same list. Every revision is kept.

Materials catalogue

Keep aggregates, sharp sand, block, pavers, natural stone, kerbs and edging with units, supplier prices and the coverage per tonne or pallet. Offcuts and wastage are allowed for.

Supplier orders and deliveries

Order against each job, record every delivery of sub-base, sand and paver, and compare quantities received with what the quote assumed. A short pallet is spotted at the gate.

Crew and plant scheduling

Plan crews, mini diggers, dumpers, compactor plates and saws by job and day, and re-plan quickly when rain or wet ground moves the programme. Plant hire days follow.

Job stages and progress

Track each job through excavation, sub-base, bedding, laying, jointing and handover, with photographs and notes at every stage. The office sees progress without a call.

Variations and approvals

Price each change on the job, such as added steps or a different paver, send it for approval, and carry the accepted figure to the next bill.

Stage invoices and retentions

Raise deposit, stage and final invoices with tax set per country, track receipts, and hold retentions for commercial customers. Each stage is billed when the stage is signed off.

Job costing

Set materials, skip and plant hire, subcontract work and labour against each job and read cost beside what has been billed. A thin margin on a wall shows before the next quote.

Handover and aftercare

Record the final inspection, snags and sign-off, then schedule aftercare visits and keep workmanship warranty terms with the job. Jointing and sealing dates are diarised.

Solutions inside

The business modules it is built from.

Each one is also available on its own, or inside a system built for you.

  • Estimate/Quotation Management

    Measured areas and depths multiply your unit rates into a quote, and each revision the customer saw stays on file.

  • Purchase Order Management

    Orders for aggregate, block and pavers are raised per job, and each delivery is received against its order.

  • Goods Receipt (GRN)

    A drop is checked on arrival against its delivery note, so short or damaged pallets are noted before the driver leaves.

  • Resource Allocation

    Crews and plant are shown by day, so a free excavator or a crew without a job is visible before dates are promised.

  • Project Timelines with Gantt Charts

    Each job lays its stages on a calendar, and a weather delay moves the dependent stages and deliveries with it.

  • Workflow and Approvals

    A change is priced, sent for the customer’s approval and added to the bill only once it has been accepted in writing.

  • Invoice Management

    Deposit, stage and final invoices are raised from work recorded, with tax set per country and retentions tracked.

  • Project Management Reports

    Materials, plant hire and labour are set against each job, so cost can be read beside what has been billed.

Services

How we would put it in.

Setup, data migration, integrations and anything built on top.

Who uses it

One system, each person sees their part.

For owners

Watch jobs in progress, quotes awaiting answers, deliveries due and stage invoices still unpaid, with job cost set beside billing.

For estimators

Record surveys, measure areas and falls, build quotes from rate lists and follow each quote to a decision.

For crew leaders

Open the day’s jobs on a phone, mark stages complete, record aggregate deliveries and add photographs.

For the office

Place orders, book plant and skips, raise invoices, post receipts and chase variations awaiting approval.

For customers

Receive quotes and variations to approve, and see progress, invoices and aftercare dates for their own job.

Reports

The numbers the owner asks for.

  • Quotes still open, won and lost
  • Jobs by stage and by crew, with days lost to rain
  • Aggregates, pavers and kerbs ordered, delivered and used per job
  • Cost of each job beside what has been billed
  • Variations pending and approved
  • Stage invoices raised and received, with retentions held
  • Outstanding balances per customer, oldest at the top
Good fit

Who this is built for.

  • Contractors who build patios, paths, driveways and paved yards for homes
  • Firms that construct retaining walls, steps, terraces and outdoor kitchens
  • Landscaping companies with a separate hardscape crew and plant
  • Contractors who work for developers, builders and garden designers as subcontractors
  • Businesses that order stone, block, sub-base and sand in bulk from several suppliers
Honest answer

When it is not the right choice.

  • A contractor who lays only a few patios a year is well served by a spreadsheet and an invoice template.
  • Firms that mostly plant, mow and maintain gardens will find Landscaping Management System closer, and general builders may prefer Construction Project Management Software.
Made to fit

Adapted to your business before it goes live.

You are not handed a login and left to it. The product is set up around your records, your people and the tools you already use.

Your rates and materials

Labour rates, plant hire, aggregates, pavers, stone and edging are entered first, with units and supplier prices as you buy them.

Job stages and billing terms

Excavation, sub-base, laying and jointing become the stages on each job, with the deposit and stage payments worded as your contracts ask.

Units and currency

Metric or imperial measures, currency and tax lines follow your country’s rules, and they are reviewed during implementation.

Existing customers and jobs brought over

Your spreadsheets of clients, live jobs, suppliers and outstanding bills are brought over, so work in progress carries on.

Messages and payments

Quote links, variation approvals and payment reminders go over email, SMS or WhatsApp, and card payments connect to your provider.

Hosted by GullySystem

GullySystem keeps the platform online, so the office and every crew leader open the same job records. Edits to rates and stages come from GullySystem staff.

Works alongside

  • Email
  • SMS
  • WhatsApp or other messaging
  • Card payment gateway
  • Accounting software export
  • Supplier price list import
Common questions

Questions owners ask before a demo.

Can quotes be priced by area, depth and tonne?

Yes. Rates are entered per unit for each material, for labour and for plant. A quote multiplies them by the measured areas and depths, and every revision is kept.

Can several deliveries be tracked for one job?

Yes. Each order can receive many deliveries of sand, sub-base or pavers. Quantities received are compared with the quote, so a shortfall or an excess shows before the job closes.

Does it cope with weather delays?

Yes. A job can be paused and its crews, plant and deliveries re-planned in one place. Customers are told of new dates by message from the job record.

Can customers approve variations?

Yes. A variation, such as added steps or a deeper dig, is priced on the job and sent by email or message. The accepted figure is added to the next stage bill.

Can it handle retentions on commercial work?

Yes. Retention terms are held per contract, and the amount withheld and its release date are tracked. The terms themselves are set with you.

Is the crew leader’s view usable from a phone on site?

Yes. They open the day’s jobs, mark stages complete and add photographs. Entries made on a remote site reach the office once signal returns.

Can we bring over jobs in progress and bills still owed?

Yes. Your customer list, live jobs, supplier accounts and outstanding bills can be brought in from spreadsheets. Someone in your office reviews the result before the first quote goes through it.

Who owns the data?

You do. Your job and material records are yours to take out, and the export format is settled in the quotation.

What does it cost?

Estimator and crew leader numbers matter, as does the way you build paving and wall jobs. You first see a live walkthrough using a patio or retaining wall job. The proposal that follows gives the figure.

Wondering what it costs? Six questions give you a written scope and the buckets any quote should separate.

Book a demo

See Hardscaping Contractor Management Software with your own data.

Tell us how you run things today. We’ll show you the parts that matter to you and say plainly what would need changing.

  • No obligation
  • A reply within one business day
  • Your details stay private

Start with your requirements

Seven short steps that tell us what you need. An engineer reads them before getting in touch.

Share your requirements