Job costing for patio and walling contractors

Job costing sets materials, skip and plant hire, subcontract work and labour against each hardscaping job. It reads that cost beside what has been billed. The owner sees whether a patio or a retaining wall is making money while the job is still running. A thin margin shows before the next quote is written.

What a hardscaping job cost record holds

A job cost record gathers every outgoing on one job under plain headings, whoever supplied it. Each line shows the item and the date. Set beside the invoices, the lines show the margin changing as the job goes on. Late invoices are keyed in as they arrive.

Materials from deliveries

Materials come from the deliveries received on the job, at the price paid. Sub-base, sand, pavers and kerbs are costed by what arrived, not by what the quote assumed. A rejected load does not count.

Skips, plant hire and spoil

Skip hire, spoil removal and plant hire days are set against the job. A mini digger hired for the dig and a skip for the spoil each become a cost line. Scheduled days feed the plant lines.

Subcontract work and labour

Subcontract work, such as a drainage run or a wall footing, is set against the job as one line. Labour is costed by crew days at the firm’s own rate. Both sit beside the materials.

Cost beside what has been billed

At any point the cost to date sits beside the amount billed and the contract total. The gap is the margin so far. It shows on every job, including those not yet finished, so no one waits for the last invoice.

Reading the cost of a patio and a wall

Cost makes sense only with a real job in front of you. Four moments show how a hardscaping firm reads it, from a Wednesday on site to the next quote. Each starts from the same record. None needs a separate sheet.

Wednesday, a skip is added

A crew leader reports from site that the dig produced more spoil than the quote allowed for, with a photograph. Back at the desk, an extra skip is added as a cost line against the job. Margins move at once.

A retaining wall runs thin

Halfway through a retaining wall, the owner opens the cost beside the billing. Block, footing aggregate and hired plant have taken more than the quote allowed, and the report shows the gap. A talk about a variation starts early.

Subcontract invoice arrives

A drainage subcontractor’s invoice arrives. Coded to the job as a subcontract line, it makes the cost to date rise. Billing for the job is unchanged until the next stage is signed off, so the gap narrows in the meantime.

Pricing the next wall

An estimator about to price a similar wall opens the cost record of the last one, still on file. The real cost of block, labour and plant sits beside what was quoted. Rates are then adjusted from facts.

Who reads job costs in a hardscaping firm

Cost is the owner’s concern, but everyone who records a delivery, a day or a bill builds it. Each sees the figures that suit the work in hand.

Owners judge margin by job

Owners read the cost of each job beside what has been billed and judge where a margin is thin. They compare jobs of the same kind. Decisions on price, crew or supplier follow from the figures.

Estimators test their rates

Estimators compare quoted cost with actual cost after each job, by line, materials, plant, labour and skips. Where a rate was wrong, they ask for the catalogue or rate list to change. Their next quote improves.

The office records costs

The office keys in supplier bills, skip invoices and subcontract invoices and codes them to jobs. Deliveries and plant days arrive by themselves. A cost coded to the wrong job is moved across, and the margin on both jobs corrects.

Crew leaders add what they see

Crew leaders report extra skips, wasted loads and days lost to rain from site, with photographs. Their notes and photographs explain a cost line when the owner asks why a job ran over. Facts reach the office quickly.

Costing decisions to settle for hardscaping jobs

Costing is only as good as the headings it is built on. Settle four points with the owner and the accountant before the first job is costed. GullySystem staff then set up the headings.

Who may edit cost lines

Decide who may add, move or delete a cost line, and whether the owner is told when one changes. A moved line changes two margins. Limit this to the office, and agree how each move is explained.

What counts as job cost

Settle which costs belong to a job and which are overheads, such as yard rent, vans or the office phone. Overheads stay in the accounts. Where the line falls is for the owner and the accountant.

Bringing across past jobs

Costs for jobs already under way are keyed in as lump sums to date, under the headings the firm wants. Finished jobs need not come across. Someone in the office checks the opening figures against the books.

Costing report to open first

Begin with the cost of each job beside what has been billed, because it answers the owner’s main question. Pick one finished job and walk through it with the owner and the estimator. Fix the headings before reading further reports.

How job costing connects to other features

Costing is where the other records meet. Deliveries supply materials, the schedule supplies plant and crew days, and invoices supply what was billed, so the figures are read, not retyped. Variations change both sides of the margin at once. The accepted quote is the yardstick for all of them.

  • Received loads in supplier orders and deliveries supply materials cost
  • Plant hire days come from crew and plant scheduling
  • Billed amounts come from stage invoices and retentions
  • Extra costs and prices follow variations and approvals
  • The accepted quotation is the yardstick for the margin

Where hardscaping job costing stops

Job costing sets recorded costs beside recorded billing. It does not value stock, spread overheads, cost the owner’s own time or tell the firm what to charge. Those choices belong to the owner and the accountant. What the margin shows is only as true as the costs keyed in, so late bills and unlogged days leave gaps. A firm with a few jobs a year can use a spreadsheet.

FAQ

Frequently asked questions

Can cost be compared with the quote line by line?

Quoted materials, plant and labour sit beside the actual costs under the same headings. A thin margin on a wall can be traced to its line. A line that ran over stands out. The comparison is a guide, not a verdict.

How are labour costs entered?

Labour is costed from crew days at the firm’s own rate. The schedule supplies the days, and the owner supplies the rate. Wages and payroll are handled elsewhere. Where a subcontractor is paid by the job, the invoice is entered as a cost line instead.

Can costs be seen before the job is billed?

Cost to date can be read while a job is still on site, with the amount billed beside it. Margin so far is the gap. Costs not yet entered, such as a late skip invoice, are not in it.

Does job costing include overheads?

Direct costs go on the job. Overheads such as yard rent stay in the accounts unless the owner and accountant decide otherwise. A margin before overheads is still worth reading.

Can we cost a job done by a subcontractor?

Yes. A subcontractor’s invoice is set against the job as a cost line, beside materials and plant, like any other cost. Subcontracting a whole job leaves the margin as billing less that invoice. Staff key the invoice in.

Where it fits

How this feature fits the system.

Hardscaping Contractor Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

Quotations by area and material

Measured areas and depths multiply your unit rates into a quote, and each revision the customer saw stays on file.

Estimate/Quotation Management

Supplier orders and deliveries

Orders for aggregate, block and pavers are raised per job, and each delivery is received against its order.

Purchase Order Management

Supplier orders and deliveries

A drop is checked on arrival against its delivery note, so short or damaged pallets are noted before the driver leaves.

Goods Receipt (GRN)
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements