Skip to main content
GullySystem

Materials catalogue for paving and walling firms

The materials catalogue lists every aggregate, sand, block, paver, stone, kerb and edging the firm buys. Each has a unit, a supplier price and coverage per tonne or pallet. Quotes and orders draw on it. Offcuts and wastage are allowed for once, in the catalogue, not guessed job by job.

What a hardscaping material entry holds

Each entry describes one product the firm buys and lays. It carries a name, a unit, a supplier and a price, and it says how far one unit goes. Quotes and orders read the same entry. A sub-base aggregate and a pallet of pavers sit in one list, each in its own unit.

Units and conversions

Aggregates and sand are held per tonne, pavers and block per pallet or per area, and kerbs and edging per length. Both the buying unit and the quoting unit are named on the entry. Buying and quoting units can differ.

Supplier names and prices

Every material carries the supplier it comes from and the price paid, with a line for each supplier if two yards sell the same sand. Prices can be brought in from a supplier’s price list. A price change is entered once.

Coverage per tonne or pallet

Coverage says how much area a tonne of sub-base or a pallet of pavers will lay at a stated depth or bond. Estimators use it to turn measured areas into tonnes and pallets. The figure is the firm’s own.

Offcuts and wastage allowance

Cut paving, curved edging and broken block waste material, so each entry carries an allowance for offcuts and wastage. A patio with a curved edge and a plain straight path then order differently. The allowance is adjusted as real jobs teach.

A materials catalogue in daily hardscaping use

Whenever someone prices, orders or checks a delivery, the catalogue is touched. Four moments show it in use, from the estimator’s desk to the paving gang. Each reads the same entry. A figure keyed in once is used by everyone who reads that entry afterwards.

Adding a new paver

Back at the yard office, a new porcelain paver is added after a supplier visit, with its size, unit, price and coverage per pallet. Estimators can use it in the next quote. Old quotes keep the price they were built on.

A supplier’s new price list

A supplier sends a new price list and the office imports it, then reads the changed lines before accepting them. Open quotes built on old prices are the firm’s to revisit. Closed jobs are untouched.

Choosing a stone at the desk

An estimator weighing natural stone against porcelain looks at both prices and coverage side by side. The dearer stone may cover less per pallet, which changes the order. The choice is made with real figures.

Yard staff checking an entry

A crew leader about to unload sand or a kerb pallet opens the entry to confirm the unit and the expected coverage. A delivery that looks short against that figure is raised at once. The check takes a moment.

Who reads the hardscaping materials catalogue

Reading happens far more than editing. Estimators and the office use it daily, crew leaders look things up and the owner watches what buying costs. Four views follow, one for each person.

Estimators choose materials

Estimators pick materials, see the rate and coverage and let the quote do the arithmetic. They compare stones, sands and edgings on price and coverage before choosing, with the supplier named. Entry changes follow the permission set.

The office keeps prices current

Keying in supplier prices, the office also imports price lists, adds new products and retires old ones. It sees which suppliers sell each material. An entry is checked by a second person before the first quote uses it.

Crew leaders check coverage

On site, crew leaders read the unit and coverage for the material in front of them and see how much the quote allowed for that job. Running short is told to the office. Photographs support the report.

Owners watch purchasing costs

Owners see what aggregates, pavers and kerbs cost from each supplier and compare yards selling the same sand. A price that has crept up is noticed at the catalogue, before it thins a margin on a job. Purchasing decisions stay with them.

Catalogue decisions before hardscaping set-up

Entering the catalogue comes first, because everything else prices from it. Decide four points while the supplier invoices are still to hand. GullySystem staff then key in what was agreed.

Who may edit prices

Choose who may change a supplier price, a unit or a coverage figure. A wrong coverage figure misprices every quote. One named person making edits keeps the list dependable, while others propose changes to that person.

What stays out of the list for Materials catalogue

Leave out one-off items bought for a single job, such as a special feature stone, unless the firm will buy it again. Plant hire and labour belong with the rates, not here. A short list is quicker to search.

Bringing across current prices

Supplier price lists and coverage figures are brought in from your spreadsheets and the suppliers’ own price lists. Someone in the office reviews the result before a quote uses it. Obsolete products are left behind.

Which report matters first for Materials catalogue

Begin with the report of aggregates, pavers and kerbs ordered, delivered and used per job, once a few jobs have run. It shows whether coverage figures and wastage allowances match what jobs consume. Adjust the catalogue where they do not.

How the catalogue connects to the hardscaping product

Underneath quoting and buying sits the catalogue. It gives the quotation its rates and coverage and gives supplier orders their product names and units. Job costing takes its price per unit from it when cost is set against billing. A change made here is read by the next quote and order.

  • Quotations by area and material read rates and coverage
  • Supplier orders take product names, units and prices
  • Deliveries are compared with quantities the catalogue implied
  • Job costing sets purchased materials against the quoted figures
  • Measured areas from site surveys convert into tonnes and pallets

Where the materials catalogue stops

Here, a material is recorded by what it is, what it costs and how far it goes. It is a price book, nothing more. It does not count stock in the yard, negotiate with suppliers or tell the firm which stone suits a client. Supplier terms, discounts and rebates stay with the owner and the accountant. A firm buying from a single yard may manage with a printed price list.

FAQ

Frequently asked questions

Can the catalogue hold two suppliers for one sand?

Yes. Each material can carry a price from more than one yard, and the office picks which supplier an order goes to. Quotes use the price the firm chooses to quote from. Both prices stay on record.

How is wastage on cut pavers set?

An allowance for offcuts and breakage is entered by the firm on each entry. An entry used on curved work may deserve a higher allowance than one used on plain rectangles. Review the figure against quantities ordered, delivered and used. Adjust it after real jobs.

Can we import a supplier’s price list?

Supplier price list import is among the connections offered, and it is agreed with you at implementation. The office reviews the imported lines first. A spreadsheet from the supplier can be the starting file for the first import.

Does the catalogue track stock in our yard?

No. It holds products, units, prices and coverage, and deliveries are recorded against jobs, not against shelves. Counting the yard is a separate task. Use your accounting software or a simple stock sheet for that.

Who adds a new material to the catalogue?

Each firm names the people who may add a material to the list. A request from an estimator goes to that person with the supplier and the price attached. GullySystem staff can also change rates on request.

Where it fits

How this feature fits the system.

Hardscaping Contractor Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

Quotations by area and material

Measured areas and depths multiply your unit rates into a quote, and each revision the customer saw stays on file.

Estimate/Quotation Management

Supplier orders and deliveries

Orders for aggregate, block and pavers are raised per job, and each delivery is received against its order.

Purchase Order Management

Supplier orders and deliveries

A drop is checked on arrival against its delivery note, so short or damaged pallets are noted before the driver leaves.

Goods Receipt (GRN)
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements