Job stages and progress for hardscaping crews

Job stages and progress follow each hardscaping job through excavation, sub-base, bedding, laying, jointing and handover. From a phone, crew leaders mark a stage complete and add photographs and notes. Back at base, staff see where every job stands without ringing the site, and customers see progress on their own job.

What a hardscaping stage record keeps

One stage is one step of the build. It runs from the dig to the final joint, and each has a date, a status, photographs and notes, held in one place. Together they tell the story of a job from the ground up.

The stages on each job

A patio job runs through excavation, geotextile, sub-base, bedding, laying and jointing, then handover and the final snag walk. A retaining wall has its own list. The stage names are the firm’s, set with GullySystem at implementation.

Status and dates per stage

Each stage holds its planned dates and its status, not started, in progress, paused or complete, as the firm words them. Paused for weather? The stage says so. The date a stage was marked complete is kept for later billing.

Photographs at every stage

A photograph of the open excavation, the compacted base, the screeded bed and the finished joints is added at each stage from a phone. They are dated and sit under the stage they belong to. Later questions are answered from them.

Notes and sign-off

Notes on each stage record what was found, such as a soft patch or a buried pipe, and what was done about it. Sign-off on a stage is recorded when the customer or office accepts the work. It lets that stage’s invoice be raised.

A patio job from dig to jointing

Follow one patio, stage by stage. From the dig to the final joint, the crew leader marks each status, takes photographs and leaves a note. Meanwhile the office watches the job move without a call to site, and nobody has to ask for an update.

Excavation signed off by photograph

The dig reaches formation level. At that point the crew leader takes photographs of the open ground and its depth, notes any soft patch and marks excavation complete. Staff see it before the sub-base lorry is due.

Sub-base laid and compacted

Sub-base goes down in layers. The compactor plate runs over each. Photographs show the compacted layers and a note records the depth laid. The base stage closes, and the stage invoice for it can follow.

Laying and jointing

Pavers go down on the screeded bed, and cuts are made around drains, kerbs and edges, with photographs at day’s end. Then the crew moves to jointing. Each of the two stages is marked as it ends.

Weather stops mid-stage

Rain stops the laying half-way. The crew leader marks the stage paused, notes the reason and adds a photograph of the wet bed. The remaining stages and deliveries move on the calendar, and the customer’s dates follow.

Who sees stage progress on a hardscaping job

Everyone wants stage progress, but each person wants a different part. Crew leaders enter it, the desk reads it, owners read the summary and customers see their own job. Each sees only what they need.

Crew leaders mark and photograph

Crew leaders open the day’s jobs on a phone, mark stages complete, add photographs and write a note about anything unusual. Entries made out of signal wait on the phone. They reach the office once signal returns.

The office watches without calling

Staff see which jobs are in which stage, which are paused and which are waiting for sign-off. A call to site is needed only for something the record cannot say. Stage invoices are raised from what it shows.

Owners read jobs by stage

Owners read the report of jobs by stage and by crew, including days lost to rain. A job stuck at sub-base while another races ahead is easy to see. Conversations with customers begin from the same facts.

Customers follow their own job

Customers see progress on their own job, stage by stage, with the invoices raised and the aftercare dates to come. They do not see other jobs. A homeowner stops ringing to ask whether the base is down yet.

Stage settings to agree for hardscaping jobs

Stage names drive billing and scheduling, so they are worth agreeing before the first job is entered. GullySystem staff set them up as the firm words them, and change them on request. Four decisions need an owner.

Who may mark a stage complete for Job stages and progress

Decide whether only crew leaders mark a stage complete, or whether the office and the owner may do so as well. Marking a stage complete in error can lead to an invoice too early. Agree who corrects a mistake.

What stages leave out

Leave out tasks that need no photograph, bill or decision, such as tidying the site each evening or loading the skip. A patio needs more stages than a path. Snag items found at handover have their own place.

Bringing jobs part-way across

Jobs already under way are entered at the stage they have reached, so the first week of use is not spent re-recording finished work. Someone in the office checks each against the site. Earlier photographs are optional.

The stage report to read first

Read jobs by stage and by crew first, because stuck or paused stages show there, and so do jobs nobody has touched. Check that every active job has a stage marked in progress. A job with none may have been forgotten.

How stages connect to the rest of the product

Stages are the spine of a hardscaping job. Orders are timed to them, the schedule is built around them and invoices are raised when they are signed off. The same photographs and notes then serve handover and aftercare, so one record does the work of several files.

  • Stage dates set delivery dates in supplier orders and deliveries
  • Crew and plant scheduling books people and machines per stage
  • A signed-off stage lets a stage invoice be raised
  • A variation attaches to the stage it changes
  • Stage photographs support the final inspection and handover

Where hardscaping stage tracking stops

Stage tracking records that work was done and shows photographs of it. It does not inspect the work, certify its quality or decide whether a base is good enough to lay on. Where an engineer or inspector must see the work, the firm arranges that visit. A single small patio can be tracked with a few phone photographs.

FAQ

Frequently asked questions

Can stage names differ for walls and patios?

Yes. Each job type carries its own stages. A wall can run footing, courses and coping while a patio runs dig, base and laying. GullySystem staff set the lists up and change them on request.

What if a stage is only partly finished?

Until it is marked complete, a stage stays in progress, with a note on what remains and when the crew returns. Partial work can be photographed. Billing for part of a stage depends on your contract terms.

Can the office see photographs without visiting?

Yes. Photographs added from the phone appear on the job under the right stage, so the office can read them at the desk. A blurred or missing picture can be asked for at once. Nobody drives out to check.

Do customers see stage photographs?

Customers see progress on their own job and nothing from other jobs, whether on a phone or a laptop. What is shown beyond the stage status, such as photographs, is agreed during implementation. Internal site notes stay internal.

How does a paused job affect invoices?

A paused stage is not complete, so its stage invoice waits. Earlier signed-off stages are billed as normal. The paused job shows on the list, so the office can tell the customer why the next bill is delayed.

Where it fits

How this feature fits the system.

Hardscaping Contractor Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

Quotations by area and material

Measured areas and depths multiply your unit rates into a quote, and each revision the customer saw stays on file.

Estimate/Quotation Management

Supplier orders and deliveries

Orders for aggregate, block and pavers are raised per job, and each delivery is received against its order.

Purchase Order Management

Supplier orders and deliveries

A drop is checked on arrival against its delivery note, so short or damaged pallets are noted before the driver leaves.

Goods Receipt (GRN)
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements