Field Services · Utility Contractor Management SoftwareOne system for utility work orders, permits, crews, materials and stage billing.
Manage utility work orders, permits and outage approvals, crew and vehicle schedules, yard material issue, as-built records and stage bills in one system. Each order carries its scope, its materials and its paperwork from the day the network owner issues it to the day it is paid. Foremen record the work from a phone.
- Schedules of rates, item lists and work types entered the way you bill
- Open orders, yard stock and unpaid bills migrated
- Changes to rates and work types made by GullySystem staff on request
Utility Contractor Management Software, configured by GullySystem, carries work orders, permits, crews and bills for firms that lay cable, set poles and maintain lines. Each order holds its approvals, the material drawn from the yard, the crew assigned and the as-built pack. Stage bills follow measured quantities against the agreed schedule of rates.
What goes wrong before the software.
How the work flows through it, step by step.
- 1
Order received
A work order arrives from the network owner or a main contractor. It is logged with its location, scope, priority and the schedule of rates it falls under.
- 2
Planning and approvals
Wayleaves, road openings, isolation slots and outage windows are requested and tracked. A crew, vehicles and materials are reserved for the planned date.
- 3
Yard issue
Poles, cable drums, conductor, joint kits and meters leave the yard against the order. Returns of part drums and spare joints are booked when the vehicle comes back.
- 4
Work on site
The foreman records quantities installed and removed, trench lengths, backfill and reinstatement, adds photographs and test results, and notes anything left for another crew.
- 5
Closing pack
As-built markups, megger test sheets, earthing readings and sign-offs are gathered into one pack and checked for gaps before the order closes.
- 6
Billing and collection
Measured quantities become a stage bill or a final bill. Receipts are posted, and retention is tracked until it is released.
What is inside.
Every module can be switched on, left out or changed to match how your team already works.
The business modules it is built from.
Each one is also available on its own, or inside a system built for you.
- Work Order Management
Each order from a network owner is logged with scope, location, priority and target date, and tied to the schedule of rates that governs its bill.
- Estimate/Quotation Management
Tender prices are built from the firm’s own item rates, every revision is kept, and open, won and lost quotations stay in one list.
- Technician Scheduling
Linemen, jointers, drivers and vehicles are placed against each day’s orders, so free capacity is visible when an urgent fault call comes in.
- Stock Tracking and Alerts
Poles, conductor, cable drums and meters are logged as received, issued to an order and returned, with reorder levels set for the common sizes.
- Goods Receipt (GRN)
What arrives on a delivery is entered against the purchase order, so a short drum or a damaged pole is caught at the gate.
- Project Document Management
Photographs, test results and markups are attached to the order from a phone, and the closing pack shows what is still missing.
- Invoice Management
Tax invoices are raised from approved measurements, receipts are posted against them, and each client’s balance lists the oldest bill first.
- Ticket Management
Every fault becomes a ticket with an owner and a target time, so the nearest crew is sent and repairs are billed apart from planned work.
How we would put it in.
Setup, data migration, integrations and anything built on top.
Explore moreBrowse business and AI solutions
Looking for another part of your workflow? Browse the modules by business function.
- Applicant Tracking (5)
- CRM (8)
- Finance & Accounting (10)
- Helpdesk (4)
- Human Resources (13)
- Inventory Management (5)
- Project Management (7)
- Manufacturing (6)
- Procurement (4)
- Sales and Distribution (6)
- Field Service (5)
- Statutory and Compliance (4)
- Retail and POS (4)
- Bookings and Appointments (3)
- Subscriptions (2)
- Assets and Fleet (4)
- Platform (6)
- Analytics (2)
- Documents (1)
- All business solutions
One system, each person sees their part.
For owners
Watch open orders, permits at risk, crew load, retention held and what each client owes, and see which network owner pays slowest.
For planners and the office
Log orders, book permits and isolation slots, schedule crews and vehicles, and prepare quotations and bills against each client’s schedule of rates.
For foremen and supervisors
Record quantities, photographs and test results on site, and see the next order for the crew. Missing closing items show before the van leaves.
For yard and store staff
Book in drums and poles on delivery, draw them against orders, and log what comes back on the truck, including part drums and unused joints.
For accounts
Build stage bills from measured work, post receipts and follow retention until each release date, with variations approved before they are billed.
The numbers the owner asks for.
- Work orders open, closed and overdue by client
- Wayleaves and permits expiring this month
- Material issued against each order
- Crew and vehicle days used by order
- Closing packs incomplete by missing item
- Stage bills raised and retention held
- Money owed per network owner, longest overdue first
Who this is built for.
- Contractors who lay underground cable and build overhead lines for network owners
- Firms that install transformers, meters and service connections
- Street lighting and public lighting contractors
- Subcontractors working under a main contractor on substation or grid projects
- Firms that keep fault repair and storm response crews on call
When it is not the right choice.
- A lone electrician on a few domestic jobs a week can manage with a phone and a paper diary, or a notebook.
- Firms that mostly wire buildings or fit solar arrays are better served by Electrical Contractor Management Software or Solar Installation Management Software.
Adapted to your business before it goes live.
You are not handed a login and left to it. The product is set up around your records, your people and the tools you already use.
Works alongside
- SMS
- WhatsApp or other messaging
- Accounting software export
- Payment gateway
- Spreadsheet import
Checks to bring to your product demo.
Review these scenarios against the product configuration and record anything that still needs to be agreed.
Invoices, receipts and dues
Can the same receipt be allocated without counting the money twice?
Take an unallocated amount in “Invoices, receipts and dues” and apply it to the intended balance. Review the remaining amount and the original receipt reference together.
Background reading: ERPNext: payment allocation
Supplier orders and receipts
Does receiving less than ordered leave the correct quantity open?
Bring a short delivery to the “Supplier orders and receipts” walkthrough. Separate what arrived, what was accepted and what remains due before checking the supplier’s bill.
Background reading: ERPNext: purchase receipts
Questions owners ask before a demo.
Does it cover planned work and fault repairs?
Yes. Planned orders and fault calls are separate record types. Both draw on the same crews, vehicles and yard stock, so a repair call shows its effect on the plan.
Can billing follow a schedule of rates?
Yes. Items and rates are loaded for each client, and measured quantities turn into a stage bill. Variations and retention are shown on the bill.
Can we track permits and shutdown approvals?
Yes. Each permit has a type, an issuing office, a start and an expiry date. Staff see what is about to lapse before a crew is sent.
Does a foreman need anything beyond a phone?
No. Quantities, photographs and test results go in through the phone browser. Where there is no signal in a cable trench or a rural lane, entries wait until the phone is back online.
Can it hold as-built drawings?
Yes. Markups and drawings are attached to the order as files. Drawing or mapping software itself is not part of the system.
Can it feed the accounts package we already use?
Invoices, receipts and balances can be exported for your bookkeeper. A live link to one named package is priced as an extra and settled at the first workshop.
Can open work orders and stock be loaded?
Yes. Orders in hand, stock on the yard shelves and bills still owing are imported from your spreadsheets, and a planner compares a sample with the originals before dispatch.
Who owns the data?
You do. The quotation states how permits, site records and crew timesheets are returned to you.
What does it cost?
Staff numbers and the range of work types you run shape the quotation. Scope grows with each client’s rate schedule, the permit offices dealt with, the payment gateway and the link to accounts. Orders in hand, yard stock and unpaid bills imported add work. No price is published. A demo built around one trade comes first.
How soon could foremen record quantities from the trench?
Work order intake, permits and outage approvals, crew and vehicle scheduling, and yard material issue would likely start the work, because a lapsed permit or short drum stops a crew. Site records, supplier orders and stage billing follow. Every stage is given a date within the proposal.
What do planners and the yard need ready?
Have ready each network owner’s rate schedule and item list, the closing documents each work type needs, permit types and issuing offices, orders in hand, yard stock, and bills still owing. A work order, a permit and a stage bill serve as samples. Planning, the foremen, the yard and accounts each name a contact.
Wondering what it would cost? Share your requirements and an engineer will come back with a scope.
Every part, on its own page.
Each page covers one part of the system: what it records, who uses it and what it hands on.
- Work order intake for utility contractors
- Tender pricing and quotations for utility work
- Permits and outage approvals for utility crews
- Crew and vehicle scheduling for line contractors
- Yard material issue for utility contractors
- Supplier orders and receipts for line contractors
- Site records and as-built packs for cable work
- Measurement and stage bills for utility contractors
- Invoices, receipts and dues for utility contractors
- Fault and emergency calls for line contractors
- Equipment and safety records for line crews
Built for.
The trades this product is set up for. Pick yours to see how the work runs there.
See Utility Contractor Management Software set up around your records.
Tell us how you run things today. An engineer reads it and writes back with what fits as it is, what would need changing, and what we would start with.
What happens after you share your requirements
- We review your brief and the systems you already use.
- We clarify the workflow, missing information and the work to consider first.
- The proposed scope sets out the deliverables, responsibilities and dependencies.
- Review the scope and commercial terms before deciding whether to proceed.
Start with your requirements
Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.
Share your requirements