Yard material issue for utility contractors
Poles, conductor, cable drums, joint kits, bollards and meters are recorded as they arrive, leave against an order and return on the truck. Reorder levels mark the sizes that go fastest and need buying first. Movements are booked by store staff. Planners and foremen read what is on the shelf.
Yard stock through four pairs of eyes
Someone in the yard keeps the book, but four people depend on it. One books stock in and out. One plans against it. One draws from it on site, and one pays for what runs short.
Movements and levels the yard book keeps
Stock in a utility yard moves in, out and back again. The record follows all three and knows which order took each pole or drum. Without that, counts drift and nobody can say why. Purchases then repeat for items already on hand.
From the yard gate to the van and back
Each morning there is a list of orders to supply, each with its permit and its start date. Poles go onto one truck, a cable drum onto another, and the evening brings back what was not used. A day at the yard looks like this.
Stores questions to answer before the first issue
A yard book that disagrees with the shelf soon stops being used. These choices suit cable, pole and joint stock. Make them with the store staff who will book the movements each day.
Limits of the yard book for stock control
Material issue keeps the count of what came in, went out and returned. It does not scan barcodes or fit any hardware, because hardware is not part of the system. Buying is raised separately. A small yard with only a few items can run on a handwritten book.
How stock movements link to other work
Material is drawn against an order, bought through a supplier and compared with what was billed. Stock information sits between those, taking from some features and handing to others. These links show where it goes next in the yard and in the office. It moves both ways.
- Work order intake names the order each issue is drawn against
- Supplier orders and receipts add delivered stock to the shelf
- Crew and vehicle scheduling decides which vans are loaded today
- Fault and emergency calls draw spares from the same shelf
- Measurement and stage bills compare issued quantities with installed ones
Frequently asked questions
Can we set a reorder level per pole length?
Each fast size can have a level, such as a common pole length or conductor. When the count reaches it, the owner and the yard see the item is low. Slow sizes need none at all.
What happens to a drum that is only partly used?
The part drum is booked back in when the van returns, against the order it came from. The remaining length stays on the shelf record. How you count it is a set-up choice. Decide it early.
Can we see what an order has drawn from the yard?
Each order shows the material issued against it. A planner or an accounts clerk can read what a job consumed. That reading is also the basis for comparing material with measured work. It needs no separate sheet.
How does a shelf count agree with the book?
A storekeeper counts a size on the shelf and compares it with the book. A gap sends them to the issues and returns for that size. Each issue names its order. The search is short.
Who may issue material from the yard?
The storekeeper books each issue. Whether a foreman may also draw without a storekeeper is a rule you set at implementation. The record shows who booked each movement and when. A drawn drum is never anonymous.
How this feature fits the system.
Utility Contractor Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.
Work order intake
Each order from a network owner is logged with scope, location, priority and target date, and tied to the schedule of rates that governs its bill.
Work Order ManagementQuotations and tender pricing
Tender prices are built from the firm’s own item rates, every revision is kept, and open, won and lost quotations stay in one list.
Estimate/Quotation ManagementCrew and vehicle scheduling
Linemen, jointers, drivers and vehicles are placed against each day’s orders, so free capacity is visible when an urgent fault call comes in.
Technician SchedulingTell us what you need.
Tell us what your team does today, where work gets stuck and what you want to change.
What happens after you share your requirements
- We review your brief and the systems you already use.
- We clarify the workflow, missing information and the work to consider first.
- The proposed scope sets out the deliverables, responsibilities and dependencies.
- Review the scope and commercial terms before deciding whether to proceed.
Start with your requirements
Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.
Share your requirements