Crew and vehicle scheduling for line contractors

Linemen, jointers, drivers and vehicles are assigned to each day’s orders, and winches and tensioners are booked like vehicles. Free capacity shows before an urgent call is accepted. The planner builds the day, the foreman reads the crew’s next order, and the owner sees the days each order used.

The day’s board as four people read it

One board serves the planner who builds it and the foreman who works from it. The yard loads to it and the owner reads its totals. Each opens the same booking. Each looks for something different.

For planners shuffling the morning

Planners place linemen, jointers, drivers and vehicles against each order for the day’s work. A fault call at noon shows at once who is free to take it. Moving a booking leaves the other days untouched.

For foremen reading the next order

A foreman opens the phone and sees the crew’s orders for today, who is on the crew and which vehicle and winch it holds. When the day changes, the crew’s next order changes with it. The board is the crew’s list.

For yard staff loading the vans

Yard staff read the day’s bookings at the depot and load each vehicle for the orders it is assigned. A cable pulling winch booked to one crew is not handed to another. The loading list follows the board.

For owners reading crew load

The owner sees the crew days and vehicle days each order has used, and the capacity left. Before agreeing to an urgent call, the owner can check what would have to move. The figures come from bookings.

People, plant and bookings the schedule holds

Any schedule is only as good as what it knows about the crews and the plant they use. It holds each worker with a trade, each vehicle and piece of equipment, and each booking against an order and a date. Three lists feed it.

Crew members and their trades

Each person is entered as a lineman, jointer, driver or other trade the firm uses. A jointing job can call for a jointer and the planner sees who has that trade free. Absence is marked against the person.

Vehicles, winches and tensioners

Vans, cable trucks, winches and tensioners are listed as bookable items. A winch is booked like a vehicle, so two crews cannot hold it for the same morning. Plant that is away for inspection is marked.

Daily assignment against an order

Each booking links a crew, its vehicles and its plant to one order on one date. The assignment is the record of who was where on the day. It feeds the days used by that order.

Free capacity for the day

What remains unbooked is held for each trade and vehicle. A planner reading it before an urgent call sees whether a crew is free or whether another job must be moved. The figure comes from the bookings.

Crews and vans on a day that goes wrong

A day starts with a plan for pole replacement and cable laying, and a fault call rewrites it. A schedule keeps up where a whiteboard cannot. This follows one day from the first booking to the last. It starts at the depot.

First booking at the depot

At the depot, two crews are assigned to the day’s orders, and each gets a van, a driver and the plant it needs. Jointers go to the cable job and linemen to the pole replacement. Both foremen see their orders on signing in.

Winch wanted by two crews

Two crews both need the cable pulling winch on the same morning. The booking shows it is held, so the planner sees the clash on screen before either crew has left the depot. One job moves to the afternoon.

A fault call at midday

A fault comes in at noon. Planners read free capacity and find a driver and a lineman at the end of a short job nearby. They are sent, and the plan changes with them. The day is redrawn at once.

Counting days at week’s end

By Friday each order shows the crew days and vehicle days it has used. The owner reads those figures against what was priced. Slow jobs show up at once. The next tender is priced with that in mind.

Booking rules to fix before the board goes live

A schedule that nobody trusts soon goes back to the whiteboard and the morning shouting. These choices belong to this trade. Settle them with the planner and a foreman before bookings are entered.

What counts as one crew

Decide whether a crew is a named gang that stays together or a pool the planner draws from each morning. The record of days used by order depends on the answer. Keep it the same for every job.

Which trades each job must have

Agree which orders need a jointer, a second lineman or a banksman on the day, and which can go with one of each. Any short booking shows at once. Rules for each work type save repeated argument at the depot.

Moving a booking mid-shift

Choose whether only the planner can move a crew once the day has started, or a foreman may too when the street demands it. Site moves must be recorded. Otherwise the board and the street disagree.

Fault calls against planned orders

Decide whether a fault call displaces a planned order or simply waits for free capacity. The answer differs for a storm and a routine repair. Settle it with the owner. Record the order of priority.

Limits of the booking board for line crews

The schedule shows who is booked and who is free. It does not track vehicles by satellite. Nor does it tell a foreman how to run a crew. Whether a worker holds the right competence for a task stays with the owner and the safety adviser. Payroll is handled elsewhere. A firm with one crew and one van can plan from a paper diary.

Bookings and the features that feed them

A booking is the point where an order, a permit, a vehicle and a yard load all meet on one day. It reads what other features say. It passes back what the crews used. Each of these links changes what the planner does next on the board.

  • Work order intake supplies orders waiting for a crew
  • Permits and outage approvals decide which days a crew can go
  • Yard material issue loads each van to the day’s bookings
  • Fault and emergency calls draw the nearest free crew
  • Equipment and safety records show gear that is out of date
FAQ

Frequently asked questions

Can a winch or tensioner be booked like a van?

Winches and tensioners are booked like vehicles, so a planner sees whether one is already out on another job. Two crews cannot hold the same winch for the same slot unseen. The clash shows on the board.

How does the planner see free capacity?

Bookings are held per person and per vehicle, so what remains unbooked is visible for the day. Before accepting an urgent call, the planner reads who is free and what would have to move. Free capacity is visible there.

Will the foreman see changes made after the morning?

A foreman reads the crew’s orders from the phone, so a changed booking appears there. Changes made at the depot reach the phone. Where there is no signal in a trench, the update arrives once the phone is back online.

Can leave and absence be recorded for a crew member?

Absence can be marked against the person, so the planner does not book that lineman or jointer for that day or the days that follow. Payroll stays elsewhere. Wages and leave pay belong with the firm’s own payroll arrangements.

Does it show where each vehicle is right now?

It shows where each vehicle and crew is booked, not a live position. Tracking hardware is not part of the system. The foreman’s update from the phone is the real-time check. A call to the driver settles anything urgent.

Where it fits

How this feature fits the system.

Utility Contractor Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

Work order intake

Each order from a network owner is logged with scope, location, priority and target date, and tied to the schedule of rates that governs its bill.

Work Order Management

Quotations and tender pricing

Tender prices are built from the firm’s own item rates, every revision is kept, and open, won and lost quotations stay in one list.

Estimate/Quotation Management

Crew and vehicle scheduling

Linemen, jointers, drivers and vehicles are placed against each day’s orders, so free capacity is visible when an urgent fault call comes in.

Technician Scheduling
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements