Measurement and stage bills for utility contractors
Measured quantities become stage bills against the client’s schedule of rates. Approved variations and retention show on each bill, so the network owner can check every line. Foremen record what went in. Accounts then turn it into a bill that follows the contract and the agreed rates.
Who measures, who prices and who checks the bill
Each stage bill is the work of several people, and the network owner checks every line. The foreman measures. Planners price from the schedule, accounts raise the bill and the owner reads what is held back.
Quantities, variations and retention on each bill
A stage bill is a chain of facts. It starts with what the foreman measured and ends with what the client agrees to pay. The record keeps each link, so a query can be traced back to the trench on the day.
From trench metres to a checkable stage bill
A cable job runs through several stages, and billing waits for measurement. This follows a job from the first quantities on the phone to the stage bill that goes out. Retention stays behind. A bill the client can check goes out.
Billing choices to fix with the owner and accounts
Every network owner has its own rules for measuring and certifying work. These decisions are particular to stage billing. Settle them with accounts and the planner before the first bill. Hurried rules cost cash.
Billing matters this feature leaves with advisers
This feature builds the bill from measured quantities and shows variations and retention. It does not agree the measurement with the client, decide what the contract allows or work out tax. Those points belong to the owner, the accountant and the adviser. The system sends nothing to the network owner automatically. A single lump-sum job needs only one invoice.
Billing in relation to the other features
Stage billing draws on almost every part of the product. It takes its rates from the order, its evidence from the closing pack and its stock figures from the yard. Its totals then go on to the invoice. The links below are short and plain.
- Work order intake supplies the schedule of rates for the bill
- Site records and as-built packs prove the measured quantities
- Yard material issue gives the material drawn for each order
- Invoices, receipts and dues take the approved bill forward
- Quotations and tender pricing use the same item codes and units
Frequently asked questions
How are quantities turned into a stage bill?
Quantities are recorded by the foreman against the item codes on the order. A planner reviews them, approved variations are added, and accounts build the stage bill from the schedule of rates with retention shown. The steps are few.
Can each client have its own schedule of rates?
Each network owner’s items, units and rates are loaded and laid out as that owner expects on a bill. The order points to the right schedule. Rates for a main contractor are held apart from a network owner’s.
What happens to a variation that is not approved?
It stays off the bill. Once approved, the variation is recorded and becomes a line of its own. Approval and its evidence are recorded against the variation by the planner. That keeps disputed work out of the claim.
Can retention be released on a later bill?
Retention held back is tracked until its release date, and the release is raised when due. The amount held is shown on each bill. Release terms follow the contract. Your adviser confirms them for each client.
Does the bill go straight to the network owner?
The bill can be emailed from the system. Where the owner insists on a portal, accounts enter it there by hand. The system does not submit bills to a portal on its own. Accounts review the bill before it leaves.
How this feature fits the system.
Utility Contractor Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.
Work order intake
Each order from a network owner is logged with scope, location, priority and target date, and tied to the schedule of rates that governs its bill.
Work Order ManagementQuotations and tender pricing
Tender prices are built from the firm’s own item rates, every revision is kept, and open, won and lost quotations stay in one list.
Estimate/Quotation ManagementCrew and vehicle scheduling
Linemen, jointers, drivers and vehicles are placed against each day’s orders, so free capacity is visible when an urgent fault call comes in.
Technician SchedulingTell us what you need.
Tell us what your team does today, where work gets stuck and what you want to change.
What happens after you share your requirements
- We review your brief and the systems you already use.
- We clarify the workflow, missing information and the work to consider first.
- The proposed scope sets out the deliverables, responsibilities and dependencies.
- Review the scope and commercial terms before deciding whether to proceed.