Measurement and stage bills for utility contractors

Measured quantities become stage bills against the client’s schedule of rates. Approved variations and retention show on each bill, so the network owner can check every line. Foremen record what went in. Accounts then turn it into a bill that follows the contract and the agreed rates.

Who measures, who prices and who checks the bill

Each stage bill is the work of several people, and the network owner checks every line. The foreman measures. Planners price from the schedule, accounts raise the bill and the owner reads what is held back.

For foremen recording quantities

A foreman records trench lengths, poles erected and joints made against the item codes on the order. Each figure is entered from the phone as the work is done. The bill is built on these quantities.

For planners preparing the bill

Planners check measured quantities against the schedule of rates for that order and add approved variations. A line with no matching item code is queried before the bill is built. Preparation sits with planners in the office.

For accounts raising the stage bill

Accounts build the bill from approved measurement, with variations and retention on separate lines so each can be checked. Each line can be traced to a quantity and a rate by the network owner. Receipts follow later.

For owners reading retention held

The owner sees the stage bills raised and the retention held back from each one. When release dates approach, the owner knows what money is due and from which network owner or main contractor. Cash planning starts there.

Quantities, variations and retention on each bill

A stage bill is a chain of facts. It starts with what the foreman measured and ends with what the client agrees to pay. The record keeps each link, so a query can be traced back to the trench on the day.

Measured quantities by item code

Each quantity is held against an item code from the client’s schedule of rates, such as trench metres, duct metres or pole erections. The unit and rate come from the schedule. Measurement and price do not drift apart.

Approved variations only

A variation is added to the bill once it has been approved. An unapproved change in scope stays off the bill. That keeps the network owner’s check short and the firm out of argument. Approval comes first.

Retention shown on each bill

Retention is held back from each stage bill and shown as its own line. The total held is visible for every client. A release date is tracked until the money comes back from the client.

Stage and bill status

Each bill records its stage, its date and whether it was raised, agreed or paid. The list shows which stage bills are waiting for the client to agree them. Bills the client has not agreed show plainly.

From trench metres to a checkable stage bill

A cable job runs through several stages, and billing waits for measurement. This follows a job from the first quantities on the phone to the stage bill that goes out. Retention stays behind. A bill the client can check goes out.

Foreman records the quantities

At the end of a shift a foreman enters the trench metres dug, the duct laid and the joints made, each against its item code. Offline entries wait. They send when the phone is online again.

The planner reviews the measure

Planners compare the foreman’s figures with the order and the schedule of rates. A quantity larger than the order allows is queried with the foreman. The correction is made before billing. Nothing goes out unchecked.

A variation is approved

The client agrees an extra length of duct on site. The planner records the approval, and the variation joins the bill as its own line. Without approval it would stay off. The approval is noted beside it.

Accounts raise the stage bill

Accounts build the stage bill from approved lines, show the retention held and send it to the client. The network owner’s checker finds each line, its quantity and its rate. The checker can follow every line.

Billing choices to fix with the owner and accounts

Every network owner has its own rules for measuring and certifying work. These decisions are particular to stage billing. Settle them with accounts and the planner before the first bill. Hurried rules cost cash.

Who measures the work

Decide whether the foreman’s quantity is final or whether a planner re-measures. Using the foreman’s figure is faster. Using a second figure catches errors. Pick one and apply it to every client and every work type.

When a variation counts as approved

Agree what proof makes a variation billable, such as a signed instruction or a written message from the client. Record the evidence against it, with the date. An unapproved variation should never be on a bill.

Showing retention on stage bills

Choose how the held-back amount is shown on each stage bill and how its release date is recorded. Accounts and the network owner should read it the same way each time. The contract sets the terms.

Stages each work type bills at

Fix the stages for each work type, such as trenching complete, cable laid and jointed, and reinstatement. A bill raised at the wrong stage invites a dispute with the client. Match them to the contract. Check each against it.

Billing matters this feature leaves with advisers

This feature builds the bill from measured quantities and shows variations and retention. It does not agree the measurement with the client, decide what the contract allows or work out tax. Those points belong to the owner, the accountant and the adviser. The system sends nothing to the network owner automatically. A single lump-sum job needs only one invoice.

Billing in relation to the other features

Stage billing draws on almost every part of the product. It takes its rates from the order, its evidence from the closing pack and its stock figures from the yard. Its totals then go on to the invoice. The links below are short and plain.

  • Work order intake supplies the schedule of rates for the bill
  • Site records and as-built packs prove the measured quantities
  • Yard material issue gives the material drawn for each order
  • Invoices, receipts and dues take the approved bill forward
  • Quotations and tender pricing use the same item codes and units
FAQ

Frequently asked questions

How are quantities turned into a stage bill?

Quantities are recorded by the foreman against the item codes on the order. A planner reviews them, approved variations are added, and accounts build the stage bill from the schedule of rates with retention shown. The steps are few.

Can each client have its own schedule of rates?

Each network owner’s items, units and rates are loaded and laid out as that owner expects on a bill. The order points to the right schedule. Rates for a main contractor are held apart from a network owner’s.

What happens to a variation that is not approved?

It stays off the bill. Once approved, the variation is recorded and becomes a line of its own. Approval and its evidence are recorded against the variation by the planner. That keeps disputed work out of the claim.

Can retention be released on a later bill?

Retention held back is tracked until its release date, and the release is raised when due. The amount held is shown on each bill. Release terms follow the contract. Your adviser confirms them for each client.

Does the bill go straight to the network owner?

The bill can be emailed from the system. Where the owner insists on a portal, accounts enter it there by hand. The system does not submit bills to a portal on its own. Accounts review the bill before it leaves.

Where it fits

How this feature fits the system.

Utility Contractor Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

Work order intake

Each order from a network owner is logged with scope, location, priority and target date, and tied to the schedule of rates that governs its bill.

Work Order Management

Quotations and tender pricing

Tender prices are built from the firm’s own item rates, every revision is kept, and open, won and lost quotations stay in one list.

Estimate/Quotation Management

Crew and vehicle scheduling

Linemen, jointers, drivers and vehicles are placed against each day’s orders, so free capacity is visible when an urgent fault call comes in.

Technician Scheduling
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements