Site records and as-built packs for cable work

Photographs, megger results and markups are attached from a phone as the work goes in. The closing pack for a cable or pole job builds up while the trench is still open. The foreman adds the records. The office reads the gaps before the order is closed.

The closing pack from the trench to the desk

A closing pack passes through four hands before the network owner accepts it. The foreman adds to it and the office checks it. Owners read what is missing. Accounts wait for it before a bill is released.

For foremen photographing the trench

A foreman attaches photographs of the open trench, megger readings and markups from the phone before the crew leaves. A missing item shows on screen. It can be fixed while the van is still on site.

For the office checking the pack

Planners and office staff see each order’s pack against the list its work type demands. A pack with a test sheet missing is held back from the network owner. The office chases the foreman first.

For owners reading what is incomplete

Owners read the closing packs incomplete by missing item. Test sheets absent from several orders may point to one crew or one habit. The owner then knows where to look. Weak spots show early, before a client complains.

For accounts waiting on sign-off

Accounts see whether a pack is complete before a stage bill or final bill goes out. A network owner will not pass a job without the documents. Billing waits for the same reason. The bill follows the pack.

Photographs, test sheets and markups on file

Utility work disappears under the ground, so the proof of it must be made on the day. Each pack keeps the pictures, the readings and the drawings, each tied to the order and the item it proves. Trenches do not stay open.

Photographs of the open trench

Pictures of the cable in the trench, the duct bank and the backfill are attached from the phone and tied to the order. Photographs are taken before the trench closes. They show what the as-built markup claims.

Megger and earthing results

Insulation test sheets and earthing readings are attached as files against the order, each with its reading. The date and the crew that took them are kept with the sheet. A missing sheet shows plainly.

Markups of the route

As-built markups are attached as files, showing where the cable or pole actually went. Drawing software is not part of the system. The markup is a file the office can open on any desk. Revisions stay in order.

Sign-offs and the pack checklist

Each work type lists the documents a network owner demands before accepting the job. The checklist ticks as items arrive. The sign-off is the last item and is added once the gaps are closed. An empty tick is plain to see.

Building a pack as the trench is backfilled

The old way was to gather photographs and test sheets weeks later from phones, paper and email, after the crew had moved on. Here the pack is built on the day. This follows one cable job from the open trench to acceptance.

Photographs before backfill

The crew finishes laying the cable, and the foreman photographs the whole trench before it is backfilled. The pictures go onto the order from the phone. Backfill then begins. The photographs are dated and kept with the order.

A jointer uploads the megger result

After a joint is made, the jointer tests the cable and the megger reading goes on the order. The date is recorded. Where there is no signal, the entry waits until the phone is back online.

The office finds a gap

The next morning an office clerk opens the pack on the order and sees that the earthing reading is missing. The clerk messages the foreman. The gap is closed before the job is claimed as finished.

The network owner accepts the pack

Once complete against the list for that work type, the pack goes to the network owner as one set. Nothing is hunted from a phone or an email thread. Acceptance is the network owner’s decision.

Pack contents to agree for each work type

What a network owner demands varies by client and by job. These choices fix what the pack contains and who closes it. Make them with a foreman and the office before the first order. Late changes confuse crews.

Photographs each work type needs

List the pictures every work type must carry, such as the trench before backfill, the joint and the reinstated surface of the road. Too few pictures leave the network owner unsatisfied. Too much wastes the crew’s time.

Naming and filing each markup

Agree how each markup file is named, so the office finds the right revision. A route marked up twice needs a rule to say which is current. Otherwise the pack carries both. Pick the rule now.

Who signs a pack as complete

Choose whether the foreman, the planner or the owner marks a pack complete. The person who signs is the one a network owner will ask. Record the name against it. Name them whenever a network owner asks.

What happens when a test fails

Decide how a failed megger reading is recorded and how the re-test is attached. Deleting the first sheet hides the history. Keep both and mark which one passed. The network owner may ask for the failed one.

Limits of the closing pack for cable jobs

Closing packs gather and check files. It is not a test instrument. Whether a megger reading is good is a question for a qualified engineer. Whether a network owner accepts the work is the owner’s decision, not the system’s. Drawing and mapping software is separate. For one small job, a shared photo folder may do.

Where closing records meet billing and stock

A closing pack depends on what was planned and releases what is waiting to be billed. It borrows its checklist from the order and sends its status to accounts. These links decide whether a job closes cleanly or drags on. Each one is a handoff between two desks.

  • Work order intake sets the documents each work type needs
  • Permits and outage approvals copies are filed with the pack
  • Measurement and stage bills wait for a complete closing pack
  • Equipment and safety records show the test instrument’s inspection date
  • Yard material issue compares joint kits issued with joints photographed
FAQ

Frequently asked questions

Can a foreman attach photographs from a phone?

Photographs, test results and markups go in through the phone browser. Where there is no signal in a trench or a rural lane, entries wait and send when the phone is back online. A phone browser is enough.

How does the system know what a pack should contain?

Each work type lists the documents a network owner demands, such as test sheets, photographs and markups. GullySystem enters these at set-up, following your clients’ rules. Each pack is checked against that list. Gaps show before closing.

Can drawings be stored as part of the pack?

Markups and drawings are attached to the order as files, in whatever format your office already uses. The system does not draw or map. If your drawings come from other software, export them and attach the file.

Can the pack be sent to the network owner?

A pack is held on the order and can be shared by email, which is a listed integration. Some owners use portals of their own. Uploading there is done by hand. The record of what was sent stays here.

Who can see an order’s test sheets?

The office, the foreman and the owner see the pack attached to the order. Access by role is set at implementation. The quotation states how site records are returned to you. Ask for a role list at the first workshop.

Where it fits

How this feature fits the system.

Utility Contractor Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

Work order intake

Each order from a network owner is logged with scope, location, priority and target date, and tied to the schedule of rates that governs its bill.

Work Order Management

Quotations and tender pricing

Tender prices are built from the firm’s own item rates, every revision is kept, and open, won and lost quotations stay in one list.

Estimate/Quotation Management

Crew and vehicle scheduling

Linemen, jointers, drivers and vehicles are placed against each day’s orders, so free capacity is visible when an urgent fault call comes in.

Technician Scheduling
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.