Site records and as-built packs for cable work
Photographs, megger results and markups are attached from a phone as the work goes in. The closing pack for a cable or pole job builds up while the trench is still open. The foreman adds the records. The office reads the gaps before the order is closed.
The closing pack from the trench to the desk
A closing pack passes through four hands before the network owner accepts it. The foreman adds to it and the office checks it. Owners read what is missing. Accounts wait for it before a bill is released.
Photographs, test sheets and markups on file
Utility work disappears under the ground, so the proof of it must be made on the day. Each pack keeps the pictures, the readings and the drawings, each tied to the order and the item it proves. Trenches do not stay open.
Building a pack as the trench is backfilled
The old way was to gather photographs and test sheets weeks later from phones, paper and email, after the crew had moved on. Here the pack is built on the day. This follows one cable job from the open trench to acceptance.
Pack contents to agree for each work type
What a network owner demands varies by client and by job. These choices fix what the pack contains and who closes it. Make them with a foreman and the office before the first order. Late changes confuse crews.
Limits of the closing pack for cable jobs
Closing packs gather and check files. It is not a test instrument. Whether a megger reading is good is a question for a qualified engineer. Whether a network owner accepts the work is the owner’s decision, not the system’s. Drawing and mapping software is separate. For one small job, a shared photo folder may do.
Where closing records meet billing and stock
A closing pack depends on what was planned and releases what is waiting to be billed. It borrows its checklist from the order and sends its status to accounts. These links decide whether a job closes cleanly or drags on. Each one is a handoff between two desks.
- Work order intake sets the documents each work type needs
- Permits and outage approvals copies are filed with the pack
- Measurement and stage bills wait for a complete closing pack
- Equipment and safety records show the test instrument’s inspection date
- Yard material issue compares joint kits issued with joints photographed
Frequently asked questions
Can a foreman attach photographs from a phone?
Photographs, test results and markups go in through the phone browser. Where there is no signal in a trench or a rural lane, entries wait and send when the phone is back online. A phone browser is enough.
How does the system know what a pack should contain?
Each work type lists the documents a network owner demands, such as test sheets, photographs and markups. GullySystem enters these at set-up, following your clients’ rules. Each pack is checked against that list. Gaps show before closing.
Can drawings be stored as part of the pack?
Markups and drawings are attached to the order as files, in whatever format your office already uses. The system does not draw or map. If your drawings come from other software, export them and attach the file.
Can the pack be sent to the network owner?
A pack is held on the order and can be shared by email, which is a listed integration. Some owners use portals of their own. Uploading there is done by hand. The record of what was sent stays here.
Who can see an order’s test sheets?
The office, the foreman and the owner see the pack attached to the order. Access by role is set at implementation. The quotation states how site records are returned to you. Ask for a role list at the first workshop.
How this feature fits the system.
Utility Contractor Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.
Work order intake
Each order from a network owner is logged with scope, location, priority and target date, and tied to the schedule of rates that governs its bill.
Work Order ManagementQuotations and tender pricing
Tender prices are built from the firm’s own item rates, every revision is kept, and open, won and lost quotations stay in one list.
Estimate/Quotation ManagementCrew and vehicle scheduling
Linemen, jointers, drivers and vehicles are placed against each day’s orders, so free capacity is visible when an urgent fault call comes in.
Technician SchedulingTell us what you need.
Tell us what your team does today, where work gets stuck and what you want to change.
What happens after you share your requirements
- We review your brief and the systems you already use.
- We clarify the workflow, missing information and the work to consider first.
- The proposed scope sets out the deliverables, responsibilities and dependencies.
- Review the scope and commercial terms before deciding whether to proceed.
Start with your requirements
Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.
Share your requirements