Work order intake for utility contractors

Work order intake gives a utility contractor one list for every job, whether it came by email, portal or phone call to the depot. Each order is logged with its source, location, scope, priority and target date, then linked to the schedule of rates behind its bill. Planners log the orders and foremen read them.

A new work order, seen from four desks

An order from a network owner reaches the planner first, then the foreman, the yard and the owner of the firm. The entry is the same for all four. Each role reads its own part of it.

For planners logging each order

Planners enter the source, whether email, portal or phone call, then the location, scope, priority and target date. A schedule of rates is picked once. One shared list lets the planner spot an order already logged before booking it twice.

For foremen opening the order

Each foreman opens the order on a phone and sees the scope, the location and the target date. Its schedule of rates tells the foreman which item codes to record quantities against. The crew’s next order sits beneath it.

For yard staff reading the scope

Yard and store staff read the scope on each order to see which poles, drums or joint kits will be drawn. Priority tells them what to load first. Dates show what can wait on the shelf.

For owners watching the list

The owner reads open, closed and overdue orders by client, and sees which are waiting on a permit. The source on each entry shows which client uses email, which uses a portal and which rings the depot. Late orders stand out.

Fields kept on every incoming order

A job that arrives by email, portal or phone call needs the same few facts written down on the day. Each entry holds where it came from, where the work is, what it covers and when it is due. Foremen read it later.

Source and named requester

The route the order took is stored, whether email, portal or phone call to the depot. So is the name of the person at the network owner who raised it. A later query is answered there.

Location and scope of works

The street, pole number or substation goes in, with a description of the work such as trenching, ducting, jointing, pole erection or a service connection. A second crew sent to the same address can see what was asked. The scope is written once.

Priority and target date

Each order carries a priority and a target date set when it was logged. A routine cable extension and a job wanted before a road closes sit at different places on the list. Priority decides which comes first.

Governing schedule of rates

Every order points to the schedule of rates that will govern its bill, since each network owner has its own items, units and rates. The link is made at intake. The item codes the foreman records against come from that schedule.

Intake across a utility contractor’s week

Monday brings an emailed job from one network owner, a portal notice from another and a call to the depot from a third. All three go onto one list. The depot desk is not the only place an order lives.

Email asking for a pole replacement

On Monday a planner opens an email about a pole replacement and logs it with the street, the scope and a target date. The client’s schedule of rates is attached to the entry. It joins the open list for the day.

Phone call about a leaning pole

A network owner rings the depot about a leaning pole. Whoever picks up logs the location, notes the priority and sets the source to phone call. A leaning pole cannot wait. Planners see it when the day’s jobs are sorted.

Portal job copied across

A third client posts its jobs on a portal of its own. A planner copies each one across and keeps the client’s own reference on the entry, so the two lists can be matched later. Source is set to portal.

Friday look at overdue orders

On Friday the owner opens the orders that are past their target date, grouped by client. Some are waiting on a permit and others have no crew booked yet. The owner asks the planner about each.

Intake rules to agree with the planning desk

Intake looks simple until two clients ask for different things. Settle these choices with the planner and the owner in the room, before the first order goes in. Little of this is technical.

Source names on the intake list

Decide which routes appear in the source field, such as email, portal, phone call or a main contractor’s site visit. A fixed list keeps counts honest. A free box lets two names appear for one route.

One order or one per street

A network owner’s letter may cover poles in several streets. Decide whether that is one order or several. The answer sets how a foreman records quantities and how the schedule of rates is applied to each visit.

Whose date is the target date

Choose whether the target date is the client’s date, the date the firm promised to the client, or both. The overdue count by client reads differently under each choice. Settle it before orders in hand are loaded.

Priority labels and their meaning

Agree what urgent, normal and planned mean for each client, since one network owner’s urgent is another’s routine. A label is worthless if the planner and the foreman read it differently. Note the meanings beside the entry.

What order intake leaves to other hands

Work order intake logs and sorts the jobs. It does not price them, grant permits, pick crews or judge whether an order is worth taking. Those steps sit in quotations, permits and scheduling. Contract terms with each network owner stay with the firm’s owner and an adviser. A lone electrician with a few domestic jobs a week can manage with a phone and a paper diary instead.

Where an order goes once it is logged

The entry starts every job. Each later feature takes the order number and the facts set at intake, so nobody has to retype the street or the client. Below are the features that read from the entry and the ones that feed it in return.

  • Permits and outage approvals attach to the order number
  • Crew and vehicle scheduling books against the target date
  • Yard material issue draws stock against the same order
  • Measurement and stage bills use the linked schedule of rates
  • Won quotations from tender pricing are keyed in as orders
FAQ

Frequently asked questions

Can one order cover several sites or streets?

Some firms log one order per client letter and others one per site. Rates and the foreman’s quantities work either way, but the overdue count changes with the choice.

How do we avoid logging the same order twice?

Every order goes onto one shared list with its source and the client’s own reference. A planner looks through that list before logging a new entry from an email or portal. The system does not read emails by itself.

What does a foreman see when opening an order?

A foreman sees the scope, location, target date, priority and the item codes from the linked schedule of rates that governs the bill. Quantities are then recorded against those codes from the phone. Entries wait offline until signal returns.

Can jobs from a main contractor be logged too?

Subcontract work for a main contractor is logged like any network owner’s order, whether it is substation or grid work. It carries its own source and rates. The client name tells the two apart on the overdue list.

Who decides which schedule of rates an order uses?

The network owner’s contract decides it, and the firm’s owner or adviser confirms it. The planner picks the schedule when logging. Rates are loaded by GullySystem at set-up and changed by its staff on request.

Where it fits

How this feature fits the system.

Utility Contractor Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

Work order intake

Each order from a network owner is logged with scope, location, priority and target date, and tied to the schedule of rates that governs its bill.

Work Order Management

Quotations and tender pricing

Tender prices are built from the firm’s own item rates, every revision is kept, and open, won and lost quotations stay in one list.

Estimate/Quotation Management

Crew and vehicle scheduling

Linemen, jointers, drivers and vehicles are placed against each day’s orders, so free capacity is visible when an urgent fault call comes in.

Technician Scheduling
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements