Work order intake for utility contractors
Work order intake gives a utility contractor one list for every job, whether it came by email, portal or phone call to the depot. Each order is logged with its source, location, scope, priority and target date, then linked to the schedule of rates behind its bill. Planners log the orders and foremen read them.
A new work order, seen from four desks
An order from a network owner reaches the planner first, then the foreman, the yard and the owner of the firm. The entry is the same for all four. Each role reads its own part of it.
Fields kept on every incoming order
A job that arrives by email, portal or phone call needs the same few facts written down on the day. Each entry holds where it came from, where the work is, what it covers and when it is due. Foremen read it later.
Intake across a utility contractor’s week
Monday brings an emailed job from one network owner, a portal notice from another and a call to the depot from a third. All three go onto one list. The depot desk is not the only place an order lives.
Intake rules to agree with the planning desk
Intake looks simple until two clients ask for different things. Settle these choices with the planner and the owner in the room, before the first order goes in. Little of this is technical.
What order intake leaves to other hands
Work order intake logs and sorts the jobs. It does not price them, grant permits, pick crews or judge whether an order is worth taking. Those steps sit in quotations, permits and scheduling. Contract terms with each network owner stay with the firm’s owner and an adviser. A lone electrician with a few domestic jobs a week can manage with a phone and a paper diary instead.
Where an order goes once it is logged
The entry starts every job. Each later feature takes the order number and the facts set at intake, so nobody has to retype the street or the client. Below are the features that read from the entry and the ones that feed it in return.
- Permits and outage approvals attach to the order number
- Crew and vehicle scheduling books against the target date
- Yard material issue draws stock against the same order
- Measurement and stage bills use the linked schedule of rates
- Won quotations from tender pricing are keyed in as orders
Frequently asked questions
Can one order cover several sites or streets?
Some firms log one order per client letter and others one per site. Rates and the foreman’s quantities work either way, but the overdue count changes with the choice.
How do we avoid logging the same order twice?
Every order goes onto one shared list with its source and the client’s own reference. A planner looks through that list before logging a new entry from an email or portal. The system does not read emails by itself.
What does a foreman see when opening an order?
A foreman sees the scope, location, target date, priority and the item codes from the linked schedule of rates that governs the bill. Quantities are then recorded against those codes from the phone. Entries wait offline until signal returns.
Can jobs from a main contractor be logged too?
Subcontract work for a main contractor is logged like any network owner’s order, whether it is substation or grid work. It carries its own source and rates. The client name tells the two apart on the overdue list.
Who decides which schedule of rates an order uses?
The network owner’s contract decides it, and the firm’s owner or adviser confirms it. The planner picks the schedule when logging. Rates are loaded by GullySystem at set-up and changed by its staff on request.
How this feature fits the system.
Utility Contractor Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.
Work order intake
Each order from a network owner is logged with scope, location, priority and target date, and tied to the schedule of rates that governs its bill.
Work Order ManagementQuotations and tender pricing
Tender prices are built from the firm’s own item rates, every revision is kept, and open, won and lost quotations stay in one list.
Estimate/Quotation ManagementCrew and vehicle scheduling
Linemen, jointers, drivers and vehicles are placed against each day’s orders, so free capacity is visible when an urgent fault call comes in.
Technician SchedulingTell us what you need.
Tell us what your team does today, where work gets stuck and what you want to change.
What happens after you share your requirements
- We review your brief and the systems you already use.
- We clarify the workflow, missing information and the work to consider first.
- The proposed scope sets out the deliverables, responsibilities and dependencies.
- Review the scope and commercial terms before deciding whether to proceed.
Start with your requirements
Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.
Share your requirements