Skip to main content
GullySystem

Tender pricing and quotations for utility work

A utility contractor prices new work from its own item rates for trenching, ducting, jointing and pole erection. Each quotation keeps every revision, and the list shows which are open, won or lost. Planners build the price. Owners decide which tenders deserve a second look.

Who prices a tender and who signs it off

Tender work moves from the planner who builds the price to the owner who signs it off. Once won, it reaches accounts and the foreman. Each needs a different view of one quotation. The price is built once.

For planners building the price

Planners pick item rates for trench metres, duct runs, joints and pole erections, enter quantities from the tender documents and name the client. Each saved version becomes a new revision. An earlier price stays on file.

For owners choosing tenders to chase

The owner reads the list by status, open, won or lost, and sees which client each quotation was priced for. Open ones await an answer. Lost ones show where the next talk about rates begins.

For accounts checking the rates

Accounts compare the rates on a won quotation with the schedule of rates that will govern its bill. A mismatch is easier to correct before work starts than at the first stage bill. It is a short check.

For foremen briefed on won work

A foreman sees the scope that was priced, so the trench lengths and joint counts expected are known before the crew arrives. The priced quantities are a guide. Measured quantities on site are what the bill follows.

Lines and revisions inside a tender price

A price is only worth defending if the firm can show how it was built. The quotation keeps the client, the item lines, the quantities and each earlier revision. When a client questions a figure, the build-up is on screen. Nothing is rebuilt from memory.

Item lines from your own rates

Each line is a trenching metre, a duct run, a joint or a pole erection, priced from the firm’s own item rates. Nobody copies a figure from an old sheet. The rate is the one on file.

Quantities taken from the tender

Quantities are entered for each line, such as trench length, ducts laid or joints made, from the documents the network owner sent. The line total follows from quantity and rate. Either can be altered and the effect seen.

The revision trail of a quotation

Every revision is saved with its date and keeps its own lines. When the client asks for a changed route, the first price is still there beside the second. Nothing is overwritten. The history can be opened at any time.

Status and the client’s answer

Each quotation is open, won or lost, with the client it was priced for. The status is changed when the answer arrives. The list is then a plain record of what was offered and what came of it.

A tender week at the planning desk

A network owner sends an enquiry for a new feeder and asks for a quotation for the cable, ducts and joints. Over the week the planner prices it, revises it after a question and hears the result. The open list stays in view.

Enquiry for a new feeder

Reading the enquiry carefully, a planner opens a new quotation for the client. The scope is cable laying, ducting and joints. The planner lists the item lines and enters the quantities taken from the drawings supplied.

Pricing a trench run

The planner prices the trench by the metre and the reinstatement by the area, using the firm’s item rates. The total builds as lines are added. A change in surface type alters one line and the total follows.

A revision after the client’s query

The client asks for a shorter duct run. A planner saves a revision with the new quantity and keeps the first one on file. Both go to the owner, who sees what moved and by how much.

Marking won work

The answer arrives and the planner marks the quotation won in the system. It shows on the won list. The firm then logs the job as an order and looks at crew capacity before naming a start.

Pricing rules to agree before the first quotation

Prices rest on rules. A quotation is only as steady as the rules behind it. Settle these with the owner and the planner before the first tender is priced, because every later revision inherits them.

Whose rates price the tender

Choose whether tender lines use the firm’s own item rates, the network owner’s schedule of rates, or a mix of the two. The choice shapes every comparison later. Ask accounts which one the stage bill will use.

How revisions are numbered and kept

Decide whether every saved change counts as a new revision or only the ones a client has seen. Frequent saves bury the sent price. Agree that a revision is made once a client has seen a figure, and keep a note of why it changed.

Who signs off a tender

Name the person who approves a tender before it goes to the client. For small jobs that may be the planner. Larger tenders may need the owner. The approval should be recorded against the quotation.

When a tender counts as lost

Lost may mean the client said no, or the validity ran out with no reply. Choose which applies for each client. Otherwise the open list fills with stale quotations that nobody is chasing any longer.

Limits of tender pricing for line work

Tender pricing builds the quotation from your item rates and keeps its revisions. It does not take quantities off drawings, because drawing and mapping software is not part of the system. Margin, risk and whether to bid at all remain the owner’s call. Judgement stays with people. Contract wording and tax treatment belong with an adviser. A firm quoting a handful of small jobs from a printed price list can keep using that list.

What a quotation hands on and takes in

A tender is the start of the chain. Its item rates, scope and client carry forward when the work is won. What the firm already holds in the yard or on the crew calendar also shapes what it quotes. The links below show where it meets the rest.

  • Work order intake receives a won quotation as a new order
  • Measurement and stage bills reuse the same item codes and units
  • Crew and vehicle scheduling shows free capacity before a bid
  • Yard material issue shows stock that need not be bought
  • Supplier orders and receipts cover long lead items priced in
FAQ

Frequently asked questions

Can a quotation use a different rate for each client?

Item rates are loaded per client, laid out as that owner expects on a bill. Picking the client comes first. The lines then follow that client’s rates, so a trench metre may price differently for each owner.

What happens to the old price when we revise a tender?

It stays on file. Each revision is saved with its own lines and date, so the planner and the owner can open the first price beside the latest. That settles it when a client says a figure has moved.

Can the owner see which tenders were won?

The list separates open, won and lost quotations by client, so the owner counts them straight from it. No win rate is promised. A rate depends on how carefully status is kept up to date.

Does a quotation include material from our yard?

Item rates cover the lines you price, such as poles erected or cable laid. How material is priced into those rates is the firm’s decision. The yard record shows what is on the shelf. Pricing itself stays with the planner.

Can the quotation be sent to the client from the system?

A quotation can go out by email, which is among the listed integrations. A tender portal run by a network owner is not connected. Planners key such tenders in by hand. The record stays here.

Where it fits

How this feature fits the system.

Utility Contractor Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

Work order intake

Each order from a network owner is logged with scope, location, priority and target date, and tied to the schedule of rates that governs its bill.

Work Order Management

Quotations and tender pricing

Tender prices are built from the firm’s own item rates, every revision is kept, and open, won and lost quotations stay in one list.

Estimate/Quotation Management

Crew and vehicle scheduling

Linemen, jointers, drivers and vehicles are placed against each day’s orders, so free capacity is visible when an urgent fault call comes in.

Technician Scheduling
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements