Skip to main content
GullySystem

Home services · Software for masonry contractorsKeep every wall measured, every delivery checked and every stage billed on one job record.

Masonry software for contractors holds each job as one record. Measured quantities of brick, block, stone and mortar, the material delivered to site, the mason crews on each day and the stage bills all sit together. Repair and restoration work, such as repointing and chimney rebuilds, is logged beside new construction.

At a glance

A masonry contractor builds walls, piers, arches, chimneys, paving and stone facing, and repairs old work that has failed. Quotes come from measured quantities, and bills follow what has been laid.

The facts sit in a site engineer’s notebook, a supplier’s delivery slips and a foreman’s attendance list. The software keeps them on the same job.

How the work runs today

The call comes from a builder, an architect, a homeowner or a property manager. Someone visits, measures the walls or the area to be repaired, and notes the material: common brick, facing brick, concrete block, natural stone or reclaimed stone. The quote lists quantities, mortar type, scaffolding, labour and waste. Restoration work needs more care, with sketches and photographs of what is there before it is touched.

Bricks, blocks and sand come from yards and quarries, and each load is counted against the order when the truck unloads. A foreman assigns masons and labourers, and the day’s work is recorded as lengths, areas or counts. Weather stops work, so the schedule moves. Bills go in stages, raised against a measurement. Retention is held back by the client. At the end come snags, and a call-back months later when a joint fails.

Where it breaks

What goes wrong for masonry contractors without a proper system.

Quantities drift between documents

The quote, the material order and the final bill each carry a wall area copied by hand. When they differ, nobody knows which one is right.

Deliveries are not checked

Bricks, blocks and sand arrive by the load. Short or broken loads go unseen until the wall stops.

Weather breaks the schedule

A rainy week moves every job. Without one schedule, crews are left idle on one site and short on another.

Subcontractor work is poorly recorded

Stone cutters, scaffold hirers and plasterers are paid by the job. What each was promised and what is owed sits in a notebook.

Old repair work has no history

A chimney stack or retaining wall fails years later. The mix, the stone and the crew who did the repair were never written down.

What changes

What masonry contractors gain from one system.

Not a feature list. These are the moments in the working day that go differently once the records sit together.

One wall area across quote, order and bill

The measured area from the site visit feeds the quotation, the brick and mortar order and the stage bill. When a figure changes, every document shows the revision. The site engineer stops copying numbers by hand. Nobody asks which wall area is right. The estimator checks the latest revision first.

Short loads caught at the gate

When a truck of bricks or sand unloads, the foreman counts against the order and records any shortfall or breakage on the spot. The supplier sees it the same day. A wall no longer stops for missing material that nobody noticed. Claims for broken bricks carry a date and a count.

Crews moved when rain moves the jobs

A wet week shifts every site, and the schedule shows which crews are idle and which job is short of masons. The supervisor reassigns a team in minutes. Weather stops are logged against the job, so a client dispute over delay has a record behind it.

Subcontractor work billed from site records

Stone cutters and scaffold hirers appear on the job with the days worked and the area done. The contractor pays against that record and bills the client for it. A claim from a subcontractor is checked against a measurement, not a recollection. Pay follows the measured area.

Restoration jobs with before photographs

A chimney rebuild or a repointing job starts with sketches and photographs of what stood there. Those stay on the record as the work proceeds. When an owner questions the cost of lifting old stone, the contractor shows the original state. The photographs settle that argument.

What the software does

What we would build for masonry contractors.

Named the way your team already talks about the work. We start with whichever part the audit shows is costing you most.

Site visits and measured quantities

Log each enquiry, record the visit with measurements and photographs, and keep the quantities on the job so the quote, order and bill all read the same figure.

Estimates from your own rates

Build estimates by area, volume or count from your rates for material, labour, scaffolding and waste. Revisions are kept beside the original.

Material orders and delivery checks

Place orders with yards and quarries under the job, tick each load off against the order, and log what came short or went back.

Crews, attendance and schedule

Assign masons and labourers to jobs, mark attendance, work out daily or piece-rate wages, and move the schedule when weather stops work.

Stage bills and retention

Invoice each stage from the measured work, follow the retention the client holds back until the defects period ends, and match every payment received to the bill it clears.

Repairs, restoration and call-backs

Log repair jobs and later call-backs against the structure they concern, with the mix, the stone and the crew recorded for next time.

Scaffolding and equipment hire

Logs scaffold sets, mixers and cutting saws on site, with the hire rate, the date out and the date back. The foreman sees what is still standing on each job. Hire is charged to the job it served.

Mortar mix and sample approvals

Keeps the approved mortar ratio, brick sample and joint finish agreed with the architect for each job. The foreman checks it before laying begins. A disputed wall is compared with the signed sample.

Rain delay and idle day log

Notes days lost to rain, late material and blocked access on each site, with a photograph and the crew left idle. The contractor uses it to support an extension of time. Idle labour cost is visible.

Piece-rate gangs and subcontractors

Holds each piece-rate gang and subcontractor with the walls built, the measured quantity and the advance paid. The site accountant settles against measured work. The balance owed to each gang is shown.

Before you talk to a supplier

A requirements checklist for masonry contractors.

What to cover, which reports to ask for and what to put to every vendor, ready to print or save as a PDF.

Open the checklist
Solutions inside

The business modules masonry contractors use most.

Each one is also available on its own, or inside a system built for you.

Lead Management

Enquiries arrive from builders, architects, homeowners and property managers, each wanting a different kind of wall. Repointing leads are tagged apart from boundary wall builds. Site visits are booked from the lead.

Learn more

Estimate/Quotation Management

A quote for a boundary wall lists brick count, mortar, scaffolding, labour and an allowance for breakage. Reclaimed stone carries its own rate. Revised quantities after the site visit replace the earlier figures.

Learn more

Work Order Management

A job order sends a crew to a site with the wall to build, its height and the bond pattern. Foundation, plinth and lintel stages are ticked off. Rework is logged against the stage.

Learn more

Purchase Order Management

Brick, block and sand orders go to yards and quarries with quantity, rate and drop date. Every truck is counted on arrival. Short loads are noted before the driver leaves.

Learn more

Stock Tracking and Alerts

Bricks, cement bags and sand piles on each site are counted against what was issued to the crews. A site short of blocks shows before masons stand idle. Surplus moves to the next job.

Learn more

Attendance & Time Tracking

Masons, helpers and labourers are marked present site by site, with half days and overtime for rain-delayed work. A foreman marks it on the phone at the site gate. Wages are drawn from these marks.

Learn more

Vendor Management

Brick kilns, sand suppliers, scaffolding hirers and stone yards each have one record with rates, delivery performance and payment terms. A kiln that sent under-burnt bricks is flagged. The next order sees the history.

Learn more

Invoice Management

Stage bills are raised as foundation, walls and plastering are completed, with measured quantity against the agreed rate. Retention held by the client shows separately. The balance due is clear at each stage.

Learn more
AI by department

Where AI can help masonry contractors.

Each one reads records you already keep, and a person approves every decision.

Services

The services behind it.

How it works

How the work runs from Bengaluru for your city.

  1. 1

    The audit, by call

    A screen-share and a look at the sheets, accounting reports and WhatsApp groups your team uses. No travel needed.

  2. 2

    A written proposal

    Scope, what we build first and the cost, agreed in writing before anything starts.

  3. 3

    Build in short rounds

    Working screens shared every few weeks. Your team tests them from your own office.

  4. 4

    Go-live, in person when it helps

    For data migration and training we can come to your city. Travel is agreed in advance.

  5. 5

    Support online

    Fixes, changes and hosting handled remotely by the same team that built it.

Make an informed decision

Check the difficult cases before choosing software.

Use examples from your own records to test the workflows that matter in your business.

Estimates from your own rates

Which assumptions stop being valid when the quotation changes?

For “Estimates from your own rates”, compare an accepted version with a later revision. Identify changed quantities, exclusions and validity dates before the revised amount is used downstream.

Background reading: ERPNext: quotation terms

Deliveries are not checked

Can a partial delivery be distinguished from a completed order?

For “Deliveries are not checked”, follow an example that leaves in more than one trip. Compare the quantity handed over with the quantity still owed before closing the order.

Background reading: ERPNext: delivery notes

Common questions

Questions masonry contractors ask before they call.

Can we estimate by wall area, volume or brick count?

Yes. Rates can be entered for each basis and mixed in one estimate. The measured quantities stay on the job and feed the quote, the order and the bill.

Does it cover restoration and chimney work?

Yes. Repair and restoration jobs carry before-and-after photographs, the material and mix used, and the crew. Call-backs are logged against the same structure.

Can we track subcontractors?

Yes. Stone cutters, scaffold hirers and other subcontractors are held as vendors with their agreed rates, work done and balance owed. Payment terms are set with you.

Can foremen use it from site?

Yes. Foremen open their own jobs in a phone browser, mark attendance, record work done and add photographs. The office sees the same record without a call.

How is a mason contractor’s system quoted?

Active jobs and crews, the estimators, foremen and billing people who sign in, and the choice to start with restoration records and call-backs all define the scope. An accounts package to link adds more. Prices are set per part in the quotation.

What does a masonry contractor need ready before we start?

Prepare a recent site measurement with its quote, your material rate list, delivery counts from yards, a crew attendance sheet and a stage bill with retention. A foreman and an estimator each need time to check screens.

If the contractor leaves the system, do job and measurement records remain ours?

They do. The code and the records of measurements, deliveries, crew days and bills belong to the contractor, with spreadsheet exports available on request. Building and support stay in one group. GullySystem hosts it, or another host can.

What happens after I share my requirements?

We review your brief and clarify the work with you. We then look at the software, spreadsheets and WhatsApp groups your business runs on today and write down what works, what slows your team down and what is missing. A demo login, a screen-share or a few screenshots are enough. You get a short written summary ordered by priority, with no obligation to hire us afterwards.

How much will the software cost?

We don’t publish a price, because it depends on what the system has to do. That first review settles the scope, and the cost goes into a written proposal before any work starts.

Talk to us

Tell us how your business runs today.

A few lines on your spreadsheets, software and WhatsApp groups is enough. We reply the same working day.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements