Skip to main content
GullySystem

Masonry estimates built from your own rate lists

Estimates and rate lists lets a masonry firm price a wall, a building or a repair from its own rates. Quantities are taken by area, volume or count, and material, labour, scaffolding and waste are priced from the list. Each revision is kept, and every open estimate sits in one list.

What a masonry estimate and rate list keep

A rate list holds the firm’s own prices for brick, block and stone, mortar, labour, scaffolding and waste. An estimate picks from that list and adds the quantities. Both stay on record, and each can be read again later.

Material and mortar rates

Brick, block and stone types are each priced as you price them now, with mortar mixes listed beside them. GullySystem staff change a price on request. Each type keeps its own line, so facing brick never shares a price with common brick.

Labour, scaffolding and waste rates

Labour is priced by the day or by the unit of work laid, matching how the crew is paid. Scaffolding has its own line. Waste is a rate too, set apart for cut stone and for common brick.

Quantity by area, volume or count

Each line takes its quantity by area for a wall face, by volume for a foundation, or by count for lintels and copings. The unit decides which rate applies. Quantities are keyed from the supervisor’s visit notes.

Revisions and open estimates

Each revision is saved beside the original figure, so an earlier price can be read again. All open estimates sit in one list, showing the client, the site, the revision and the total. Won and lost ones are marked.

Pricing a wall, a stack and a repair

An estimator’s week is not one kind of job. A boundary wall, a chimney rebuild and a restoration quote all start from the same rate list. One list prices them all. These moments show it at work, from the desk to the client’s gate.

Pricing a block boundary wall

After a visit, the estimator keys the wall’s length and height as an area. Block type and mortar mix come from the list, with scaffolding and waste added. The total is read before it goes out.

Quoting a chimney rebuild

A chimney rebuild mixes units. Brick is priced by volume, while pots and cap stones are priced by count. A tall stack adds scaffolding as its own line. Estimators read the total with that line visible.

Revising after the client replies

A client on the phone asks to swap common brick for facing brick on a house front. The estimator opens the estimate, changes the line and saves a revision. The old figure stays beside the new one.

The owner reading the open list

On Friday the owner reads the open estimates in one list, with client and total on each line. Quotes that have waited longest get a call. Won and lost estimates are marked, so the list stays short.

Who works with masonry estimates and rate lists

Estimating is office work, but the rates come from site knowledge. Four roles touch the list. Owners approve the price, the office builds it, supervisors supply the quantities and store keepers know what material really costs.

For the office

Builds each estimate from the rate list, enters quantities from the visit notes, saves each revision and sends the figure to the client. Open estimates are chased from one list. Won work moves on to a site job.

For the owner

Read open, won and lost estimates and see which job types win work. Sign off the rates before they go on the list. A rate is the owner’s decision. Margin on a job starts as the gap between rate and cost.

For foremen and supervisors

Supply measured lengths, heights and counts from site. Open an accepted estimate on a phone to see the quantities the job was priced on. A gap is raised with the office before the first course is laid.

For store keepers

Tell the office when a yard’s price for brick, block or sand has moved. GullySystem staff then update the rate on request. Estimates raised after that pick the new rate. Store keepers deal with the yards, so the news arrives first.

Rate list decisions before you start estimating

The rate list sits under every figure. Agree it before the first estimate. These four points are settled with you during the build, and the office works to them afterwards.

Who may change a rate for estimates and rate lists

Decide who may add or edit a rate, and who may only read it. A changed rate moves every later estimate. Name one person, perhaps the owner, to approve it. Revisions to an open estimate follow the same rule.

What is left out of rates

Decide what stays off the list, such as a carved sill or reclaimed stone bought for one job. Standing rates suit repeat buys. Agree how one-off items are priced and noted on the estimate, so the client sees the line.

Bringing in current rates

Brick, block and stone types, mortar mixes, labour rates and quoted job types go in first, priced as you price them now. Bring a recent estimate. The office checks the list against it, line by line.

First report to read for estimates and rate lists

Estimates open, won and lost is the first report to open. Decide whether it is read by client, by type of job or by site, and who reads it first. Lost estimates should carry a reason.

How estimates connect to jobs and bills

An estimate holds the first figures a job ever has. It starts from the enquiry, the site address and the visit notes taken by the supervisor. When the client accepts, it becomes the job. Later features compare work laid and work billed with those first figures. These are the links.

  • Takes site address and measurements from Enquiries and site visits
  • Hands an accepted estimate to Masonry site jobs and work orders
  • Gives Material orders and delivery checks the quantities priced
  • Sets the figures Measurements and stage bills are read against
  • Shares job types with Repairs, restoration and call-backs

Where masonry estimating stops

This feature prices work from the rates you enter. It does not set those rates. Nor does it judge whether a price will win the job or advise on margin. Tax lines, contract terms and what a client may withhold stay with the owner and the accountant. One mason pricing a few small jobs a month can keep rates in a notebook.

FAQ

Frequently asked questions

Can an estimate price a repair as well as a new wall?

Yes, a repointing job or a chimney repair is priced from the same rate list, with its own job type. Lines are shorter and count-based. Fewer quantities need keying. Photographs from the visit stay with the enquiry, ready for the estimator.

What happens to the old figure when we revise?

It stays beside the new one. Revisions are saved with their own totals, so the client’s earlier price can be read whenever a discussion starts. The open list holds one line per estimate, so a revised quote is never counted twice.

How do we price a job by volume rather than area?

Pick the unit for the line. A foundation or fill is entered by volume, a wall face by area and items such as copings by count. Each rate on the list carries a matching unit.

Can the rate list hold different waste allowances?

Yes, waste is a rate of its own. A firm can enter one allowance for common brick, another for cut stone and another for reclaimed brick. Each is picked line by line, so the estimate reflects the material.

Who changes brick or stone prices in the list?

Price changes for brick, block and stone are made by GullySystem staff on request. Send them the new figure with the rate’s name. The owner decides who may ask for a change. Estimates raised afterwards use it.

Where it fits

How this feature fits the system.

Masonry Contractor Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

Enquiries and site visits

Each enquiry is logged with its source and address and a visit is scheduled, so builders and homeowners are followed up from one list.

Lead Management

Estimates and rate lists

Estimates are built from the firm’s own material, labour, scaffolding and waste rates, with each revision kept beside the original figure.

Estimate/Quotation Management

Site jobs and work orders

Every wall, building or repair runs as a job with stages, crew, material and schedule, from the first course to the final finish.

Work Order Management
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements