Skip to main content
GullySystem

Material orders and delivery checks for masons

Material orders and delivery checks lets a masonry firm raise orders to brick yards and quarries against a job. Each delivery is then checked against what was ordered. Shortages, damage and returns are written down on the day, so the yard and the site agree on what arrived.

What a masonry order and delivery record keeps

An order names the yard or quarry, the job it is for and every line wanted. A delivery record sits against it. Together they hold what was asked for, what arrived, what was damaged and what went back to the yard.

Order lines by job

Each order is raised against a job and lists bricks, blocks, stone, sand or cement with a quantity and a unit. The yard or quarry is named once. Units follow the yard’s own way of selling: pallets, tonnes or loads.

Delivery booked against the order

When a lorry arrives, the delivery is booked against its order, line by line, with the date and the driver’s note. The quantity ordered and the quantity received sit side by side on one screen. A gap shows at once.

Shortages and damage

A short delivery is recorded with the line, the quantity missing and a note, such as two pallets of facing brick short. Breakage and chipped stone go on the same record, with the load it came from. The note is dated.

Returns to the yard

Material sent back is recorded against the order with its quantity and the reason. Whether the yard credits the return stays a matter between the firm and the yard, settled outside the system. The return stays on the order.

Ordering and checking material through a week

Material moves all week between yards, quarries and sites. These moments follow one block job, one stone order, one short delivery and one cracked batch. Each is a few entries at the desk, at the gate or on a phone. Entries are brief.

Monday order for a block wall

Office staff raise an order to the block yard against the new job. They list block, cement and sand with units, and send it by the firm’s usual route. The order stays open until delivery is booked.

Quarry order for facing stone

A stone order goes to a quarry for a facing job. Lines show the stone type, the dressed size and the number of loads. The office notes the quarry’s promised day against the order. That day is checked on arrival.

A lorry arrives at the gate

The store keeper walks the load against the written order. Two pallets of facing brick are short, so the line is booked at the quantity received and the gap is noted. The driver hears of it before leaving.

A cracked batch goes back

A pallet of blocks is found cracked. The foreman records the damage on the order, and the return is booked. The office raises the matter with the yard, with the record in hand and the date of the delivery beside it.

Who raises orders and who checks deliveries

Ordering and checking are held by different people. The desk raises, the gate checks and the site confirms. The owner reads the pattern across all of them, job by job.

For the office

Raise orders against jobs, send them to yards and quarries, and read the open orders still waiting for delivery. Short deliveries come back to the office. The desk sees every order in one list, whichever job it serves.

For store keepers

Book in deliveries from yards, line by line, against the written order. Record shortages and breakage before the driver leaves. Hand-outs to jobs follow once the delivery has been checked and booked into the site store.

For foremen and supervisors

Confirm on site what reached the wall and read the orders for the job to see what is still due. Flag damage found when laying starts. A foreman need not ring the office to ask.

For the owner

Read material ordered, delivered and issued by job. A job where far more arrived than was ordered, or far less, stands out. Yards whose loads run short again and again are easy to see at a glance.

Decisions to settle before ordering goes live

Ordering rules are cheap to set at the start and awkward to change later. These four points are agreed with you during the build. Settle them before the first order is raised.

Who may raise or change orders for Material orders and delivery checks

Decide who may place orders, who may change one after it is sent and who may only check deliveries. Foremen may request material without raising the order. Agree whether the owner approves large orders, and above what size.

What is left out of orders

Decide which purchases stay off orders, such as a bag of cement bought at a counter for a small repair. Agree how it is recorded. A written rule stops those costs slipping off the job’s record.

Bringing in yards and open orders

Yards and quarries you buy from are entered once, with the unit each one sells by. Orders still open at the start are keyed in by the office, so the first delivery meets a real order. Pick a cut-off date.

First report to read for Material orders and delivery checks

Material ordered, delivered and issued by job is the first report to open. Decide whether it is read by yard, by job or by material. Short deliveries deserve the first look. Name one reader for it.

How orders link to other masonry features

An order starts from a job and ends in the store. Five links matter. Quantities come from the estimate, deliveries move into the site store, and the cost of what arrived sits beside the job’s billing. The lines below name each link in that chain.

  • Takes priced quantities from Estimates and rate lists
  • Raises every order against a Masonry site job
  • Hands checked deliveries to Material issue and site store
  • Passes yard balances to Subcontractors and vendors
  • Gives Measurements and stage bills material cost beside billing

Where ordering and delivery checks stop

It does not negotiate with yards, collect a claim or decide whether a short load is the driver’s fault. Payment to the yard, its tax invoice and any dispute stay with the owner and the accountant. A mason buying a few bags for one small repair can note it by hand.

FAQ

Frequently asked questions

Can we order from a quarry by the load?

Yes, units are set per supplier, so a quarry can be ordered in loads or tonnes and a block yard in pallets or counts. Each line carries its unit. The delivery check uses the same unit.

What if a delivery is partly right and partly wrong?

Each line is checked on its own. Correct lines are booked in full, the short line is booked at what arrived, and the damaged line is noted. The order stays open for the balance still due.

Can we see everything ordered for one job?

Open the job and read the orders raised against it, with what arrived and what was returned. The material report shows the same by job. Owners can set it beside the estimate before a stage is billed.

Does it track what we owe each yard?

Orders and checked deliveries show what each yard has supplied. Balances owed to suppliers are held with subcontractors and vendors, beside agreed rates. Paying the yard stays with the owner. The accountant records each payment.

Can a foreman check a delivery from a remote plot?

A foreman on a remote plot can record what reached the wall from a phone, while the store keeper books in deliveries from yards. Both records sit against the same order. The differences show up.

Where it fits

How this feature fits the system.

Masonry Contractor Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

Enquiries and site visits

Each enquiry is logged with its source and address and a visit is scheduled, so builders and homeowners are followed up from one list.

Lead Management

Estimates and rate lists

Estimates are built from the firm’s own material, labour, scaffolding and waste rates, with each revision kept beside the original figure.

Estimate/Quotation Management

Site jobs and work orders

Every wall, building or repair runs as a job with stages, crew, material and schedule, from the first course to the final finish.

Work Order Management
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements