Skip to main content
GullySystem
Home services · Software for roofing contractors

One record per roof for pitch, purlin spacing, sheet order, crew days and stage bill.

Roofing software holds each roof as one job. The job carries its plan area and pitch, plus the tiles, profiled sheets or membrane ordered for it. Crew days and before and after photographs sit beside them. Stage bills follow the area measured. A leak call after handover is logged against the same roof, so whoever answers the phone sees the warranty position.

At a glance

A roofing contractor prices a roof from its plan area, its pitch and its covering. Once the quote is accepted, material is ordered, crews go up in batches, and the work is billed in stages as it is measured. Simple to say. Hard to track across six roofs at once.

Most of it sits in an estimator’s notebook, a merchant’s delivery slips and a camera roll. Roofing software puts the measurements, orders, crew days and money on one record per roof, so the office and the supervisor read the same figures for a garage or a warehouse.

How the work runs today

The enquiry comes from a homeowner, a builder, a property manager or a factory owner. An estimator visits, measures the plan area and the slope, photographs the existing covering and notes access for ladders, scaffold towers and lifting gear. The quotation lists covering, underlayment, battens or purlins, flashing, fasteners, ridge cap, gutter work and labour, priced from that week’s merchant rates. A firm sends revised quotations until the client agrees.

After approval, material is ordered and delivered to site. Crews are booked around the weather, and a job that loses a day to rain has to move without disturbing the next one. The supervisor records the area completed and any extra work found once the old covering is lifted, such as rotten decking or a split rafter. Stage bills follow the measurement. After handover, leak calls and warranty visits come back to the same roof. Whoever answers must know what was fitted there, who fitted it, which warranty applies and whether the original fixings were changed during a later repair.

Where it breaks

What goes wrong for roofing contractors without a proper system.

Measurements live in notebooks

The estimator measures once, the supervisor measures again, and the bill is written from a third figure. Nobody can say which area the client agreed to. Disputes follow.

Weather moves the whole schedule

A wet week pushes crews from one site to the next. The calendar sits in a message group, clients hear late, and the next roof in the queue shifts again unseen.

Extra work is not recorded

Rotten decking, extra flashing or a moved ridge line turns up once the roof is open. If the client has not signed it, the cost is hard to bill, and the supervisor is already on the next roof.

Material is ordered twice or short

Orders go to the merchant by phone and message, and deliveries arrive in part. Nobody checks them against the area measured, so a shortfall of ridge tiles is found on the ladder with the crew waiting.

Warranty calls have no history

A leak is reported two winters later. The covering, the fixings and the crew who fitted the valley gutter are not found without a search through old files.

What the software does

What we would build for roofing contractors.

Named the way your team already talks about the work. We start with whichever part the audit shows is costing you most.

Roof inspection and measurement

Record the site visit with plan area, pitch, covering type, access notes and photographs, kept under the client and the address. Every later figure starts here.

Quotations from your rate list

Build quotes from your own rates for sheets, tiles, battens, flashing and labour. Revised quotes are saved beside the first one. You can always show what was originally offered.

Material orders and deliveries

Raise orders to merchants against a job and check each delivery against what was ordered, with a short count of ridge tiles or sheets shown at once.

Crew days and scheduling

Plan crews by roof and by day, mark days lost to rain, and see who is free before a date is promised.

Variations and stage bills

Log extra work with the client’s approval. Then raise stage bills from the area measured and the variations signed, so invoice and site record carry the same figures.

Leak calls and warranty records

Keep the covering, the date fitted and the warranty terms on each roof. A leak call opens a ticket and a visit against the same record. Nothing is searched for.

Safety and site checks

Complete a site checklist for work at height, with harness checks, the crew and the date noted. Photographs of the finished work stay with the job.

Before you talk to a supplier

A requirements checklist for roofing contractors.

What to cover, which reports to ask for and what to put to every vendor, ready to print or save as a PDF.

Open the checklist
Ready product

A product already built for roofing contractors.

It is adapted to how your business works before it goes live, and anything your trade needs that it lacks is added then.

Roofing Contractor Management Software

Roof inspections, quotations, material orders, crew schedules, variations, stage bills and warranty records for roofing contractors.

See the product
Worldwide

Where we work with roofing contractors.

How it works

How the work runs from Bengaluru for your city.

  1. 1

    The audit, by call

    A screen-share and a look at the sheets, accounting reports and WhatsApp groups your team uses. No travel needed.

  2. 2

    A written proposal

    Scope, what we build first and the cost, agreed in writing before anything starts.

  3. 3

    Build in short rounds

    Working screens shared every few weeks. Your team tests them from your own office.

  4. 4

    Go-live, in person when it helps

    For data migration and training we can come to your city. Travel is agreed in advance.

  5. 5

    Support online

    Fixes, changes and hosting handled remotely by the same team that built it.

Make an informed decision

Check the difficult cases before choosing software.

Use examples from your own records to test the workflows that matter in your business.

Leak calls and warranty records

What proves that a planned task was actually completed?

Select an overdue entry in “Leak calls and warranty records”. Ask which work record closes it and what remains visible when the visit is postponed or only part of the job is done.

Background reading: ERPNext: maintenance plans

Roof inspection and measurement

Do purchasing, operating and billing quantities use the same unit?

Check the measurement unit and rounding used in “Roof inspection and measurement”. Compare the result with a known sample before accepting a converted quantity or calculated charge.

Background reading: ERPNext: units of measure

Common questions

Questions roofing contractors ask before they call.

Does it work for both housing and commercial roofs?

Yes. A small repair is a short job with one visit. A large industrial roof runs in stages with its own crew plan, order list and stage bills, and each stage can be billed once it is measured.

Can we handle different roof coverings?

Yes. Profiled metal sheet, concrete tile, clay tile, shingle, torch-on membrane and flat roof work can each carry their own item list and rates. The list is set up with you.

Can crews see their jobs on a phone?

Yes. A crew lead opens the roofs booked for the day, notes the area done and uploads photographs from the ladder or the van. On a roof with no signal, entries are held until the phone reconnects.

How are tax and currency handled?

Your accountant and GullySystem agree the currency and the sales tax rules for your country during installation. Your accountant reviews the invoice format before go-live, including how tax shows on stage bills and on retention that the client holds.

What drives the roofing system cost?

The base depends on measurements, quotations from your rate list and stage bills. Scale means crews, jobs at once and users. Phone photos can change the total. Measurements can be priced alone.

Which papers start the roofing system off?

Bring your rate list, a measured roof sheet, delivery notes and a warranty call note. A named person covers the estimator, the supervisor and the office. Samples of a measured roof sheet help most.

Who owns the roof measures after we stop?

The roofer keeps the source code, roof measures, crew days and warranty calls. Export warranty calls and roof measures as plain files. The roofing system builders keep supporting roof measures.

What happens after I share my requirements?

An engineer reads what you send and replies within one business day. We then look at the software, spreadsheets and WhatsApp groups your business runs on today and write down what works, what slows your team down and what is missing. A demo login, a screen-share or a few screenshots are enough. You get a short written summary ordered by priority, with no obligation to hire us afterwards.

How much will the software cost?

We don’t publish a price, because it depends on what the system has to do. That first review settles the scope, and the cost goes into a written proposal before any work starts.

Talk to us

Tell us how your business runs today.

A few lines on your spreadsheets, software and WhatsApp groups is enough. We reply the same working day.

What happens after you share your requirements

  1. A senior engineer reads your answers. Nobody phones first.
  2. Within one business day you get a written note: what we understood, what we would start with, and the questions we still have.
  3. If it fits, a proposal follows with the order of work, what we need from you and what you receive at each step.
  4. No call is booked and nothing is paid until you have read the note. Your details stay with us.

Start with your requirements

Seven short steps that tell us what you need. A senior engineer reads them before anyone gets in touch.

Share your requirements