Roofing crew plans, attendance and piece-rate pay
Crew scheduling and attendance plans each roofing crew by roof and day, with scaffold dates beside the plan. Crew leads mark who turned up. Days lost to rain or wind are recorded. Hours or piece-rate pay by the square are then worked out from those entries.
What the crew plan and attendance keep
A roofing crew plan is a promise that depends on weather, scaffold and material. This feature records the plan and what actually happened, side by side. The gap between the two is where pay and delay are settled. Both are kept.
A crew week from plan to payday
Roofing crews are planned on hope and rearranged by weather. The moments below follow a crew through a working week of changing plans. Each shows a person using the schedule to decide what happens next. Rain has the last word.
Who sees the crew plan and who changes it
A plan is read by almost everyone and changed by few. Each lead sees only their own roofs, the desk sees all of them, and the owner reads the totals. Each view suits its reader. Pay stays private.
Decisions before crew plans go live
Pay rules and planning habits differ between roofing firms, so a short list of choices belongs in the first workshop. Bring the crew list. Bring the way you pay each person today.
How crew scheduling connects to other features
Crew planning draws on the job and gives back to billing. It takes roofs and stages from the job, material news from orders, and measured area from daily entries. It sends crew days and pay figures on to the owner’s reading of each roof. The chain is short.
- Reads roofs and stages from Roof jobs and stages
- Waits on late pallets in Material orders and deliveries
- Daily measured area is later used by Stage bills and invoices
- Crews are booked to calls raised in Leak calls and service visits
- Gutter clearing booked in Warranty and maintenance records needs a crew
Where crew scheduling stops
This feature plans crews and works out hours or piece-rate pay from the entries made. It does not run payroll, file returns or decide what tax or insurance is due. Those matters stay with the owner and the firm’s accountant. It cannot predict the weather. A firm with one crew and a few roofs can plan on a calendar. A second crew, rain days and piece rates are where a shared schedule earns its place.
Frequently asked questions
Can we plan roofing crews by roof and by day?
Each crew is booked onto a roof for a day or a run of days. The schedule shows the lead, the roof and the stage due. The office sees every crew on one page. That is the plan.
How are days lost to rain or wind recorded?
Leads mark the day as lost against the roof, with a note. It is kept apart from absence. Later the owner can read the days that weather took from each roof, and the stage each one hit.
Can pay be worked out by the square?
Yes, where your firm pays piece rate. The area stripped and relaid is entered each day, and pay by the square is worked out from it. Hours and daily rates follow your own pay rules.
Does it handle payroll and tax for the crew?
Pay is worked out from attendance and area. Payroll, tax and insurance stay with the owner and the accountant. The figures can be exported for whoever keeps your books. Nothing is filed for you by the system.
Do scaffold dates appear beside the crew plan?
Scaffold dates sit beside each crew plan. The office reads when scaffold goes up and comes down, and sees whether a crew is booked against it. No crew is sent to a bare wall, with nothing to stand on.
How this feature fits the system.
Roofing Contractor Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.
Enquiries and inspections
Each enquiry is logged with its source and address, the inspection is booked, and measurements and photographs stay on the client record.
Lead ManagementQuotations and rate lists
Quotations are priced item by item from the firm’s covering, material and labour rates, and every revision is kept beside the open quotes.
Estimate/Quotation ManagementRoof jobs and stages
Each roof runs as a job with stages, crew, material and schedule, from preparation through to final inspection and handover.
Work Order ManagementTell us what you need.
Tell us what your team does today, where work gets stuck and what you want to change.
What happens after you share your requirements
- We review your brief and the systems you already use.
- We clarify the workflow, missing information and the work to consider first.
- The proposed scope sets out the deliverables, responsibilities and dependencies.
- Review the scope and commercial terms before deciding whether to proceed.
Start with your requirements
Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.
Share your requirements