Skip to main content
GullySystem

Roofing yard stock, issues to site and returns

Material stock and returns tracks the slates, ridge tiles, fixings, flashing and sheeting held in a roofing yard. Each item is received, issued to a roof and booked back as an offcut. Reorder levels flag what is running low. Buyers, owners and the yard read one stock list.

What the yard stock record keeps

A roofing yard holds items of very different shapes, from pallets of slate to boxes of clout nails. The stock record gives each one a line, a quantity and a history. Counts are kept where the yard and the office can both read them. That is its job.

Items held in the yard

Slates, ridge tiles, fixings, flashing and sheeting each have a line with a unit and a quantity on hand. New items are added when the firm starts using them. A rare lead roll has its own line.

Receipts from merchants

Each delivery that is booked in raises the quantity on its line. The merchant, the date and the roof it was ordered for are noted. A pallet received for a roof is not mistaken for general stock. Both are visible.

Issues to site

When a crew loads for a roof, yard staff record what leaves, against that job. The quantity on hand falls, and the material is tied to the roof. Nobody guesses what went up on the lorry.

Offcuts and returns

Material that comes back from site is received against the job it left. Full bundles go back on the shelf. Offcuts of lead or sheeting are logged as such. A returned item is no longer counted as used.

Yard stock through a working week

The yard is where a roofing firm either has the right material or loses a day. The moments below follow a week of stock. They run from a low box of fixings to lead brought back from a finished roof.

Loading for tomorrow’s roof

In the afternoon, yard staff open the job for the morning and read its material list. They load slates, battens and fixings, and book the issue to the roof. The crew leaves with a clear load sheet.

A reorder level is reached for material stock and returns

After several issues, ridge tiles fall below their reorder level. The item shows on the list for the buyer. An order goes to the merchant in good time. No crew arrives to find an empty pile.

Offcuts come back from site

A crew returns from a finished roof with unused flashing and half a roll of sheeting. Yard staff receive them back against the job. Those items are available for the next repair, not lost in the corner.

Checking what is physically there

The owner or yard lead walks the rack, compares what is counted with the list, and corrects a quantity where they differ. The correction is a recorded entry. A disagreement is settled by counting, not arguing.

Who reads and changes yard stock

Stock is touched by the yard, the desk and the owner, and a crew lead hears about it only when the load is short. The list underneath is the same one.

Yard and stores staff

Yard and stores staff book in deliveries, issue slates, battens and fixings against jobs and receive back whatever comes off site. They see each line with its quantity and reorder level. Theirs is the busiest stock screen.

The office placing orders

Office staff read the list of items under their reorder level and place merchant orders. They also see what is already ordered and on its way. Duplicate orders for ridge tiles are avoided. That saves money.

Owners reading stock cost

An owner reads what is held in the yard, what each roof drew from it and how tile and timber cost compare with billing. The view is for reading. Corrections are made in the yard.

Crew leads at loading time

A crew lead checks the load for the roof against the job’s list before leaving the yard. A missing bundle is raised on the spot, while the yard is still near. Issues are not a surprise.

Decisions before stock records begin

Stock keeping only works when everyone agrees what is counted and who may change it. Settle these points with the yard lead and the buyer at the first workshop. Start from a walk round the yard.

Who may adjust a count for material stock and returns

Decide who may correct a quantity after a physical check. Some firms allow the yard lead only. Others add the owner. Whichever you choose is set as a rule, and the correction is recorded as an entry.

What is left out for material stock and returns

Settle which items are not tracked, such as loose nails or a bag of sealant bought for one job. Keep stock to the lines that run out or cost real money. Everything else goes on the roof job.

How opening stock comes across for material stock and returns

Opening quantities are entered from a count taken on one day, or imported from your sheet. Staff compare the figures with the shelves before issues begin. The first count is the foundation. Take it slowly.

Which list matters first for material stock and returns

Begin with items below reorder level. It stops a roof waiting on a bundle that nobody ordered, which is the costliest kind of delay. Other stock views can follow later. First, counts and issues must be booked every day with care.

How yard stock connects to other features

Stock stands between the merchant and the roof. It receives what the order feature delivers and gives what the job needs. What returns from site comes back through the same door. The quantities on each line stay honest, whatever the weather did to the plan.

  • Receipts arrive from Material orders and deliveries
  • Issues are charged to the roof in Roof jobs and stages
  • Items below reorder level prompt new merchant orders
  • Material cost informs Quotations and rate lists
  • Extra stock used on repairs joins Leak calls and service visits

Where yard stock tracking stops

This feature counts what is in the yard and where it went. It does not value stock for the accounts, run a stocktake for an auditor or decide what the firm should keep on the shelf. Those matters stay with the owner and the accountant. A roofer who buys all material for each job, with nothing held back, may not need a yard list. Held stock and returns change that.

FAQ

Frequently asked questions

Can we set reorder levels for slates and ridge tiles?

Reorder levels are set for items you use all the time, such as ridge tiles and fixings. When the quantity falls to that level, the item appears for the buyer to act on. It is a prompt.

How do offcuts and unused bundles go back into stock?

Yard staff receive returns from site against the job they left. Full bundles go back on the shelf, and offcuts are logged as offcuts. The quantity on the line rises to match. Nothing is written off by mistake.

Are issues to site charged to the right roof?

Every issue is booked against one job, so the material is tied to that roof. The owner can then read tile and timber cost against billing for each roof. The link is plain. No sheet sits between.

Does the yard stock cover flashing and lead as well?

Flashing, lead and sheeting each get a line in the yard list, as do slates and fixings. You decide at set-up which items are tracked. Anything bought for one job can be left out of the yard list.

What if the yard count and the list disagree?

A walk of the rack finds the difference, and an authorised person corrects the quantity. The correction is recorded as an entry. The list then matches the shelves again.

Where it fits

How this feature fits the system.

Roofing Contractor Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

Enquiries and inspections

Each enquiry is logged with its source and address, the inspection is booked, and measurements and photographs stay on the client record.

Lead Management

Quotations and rate lists

Quotations are priced item by item from the firm’s covering, material and labour rates, and every revision is kept beside the open quotes.

Estimate/Quotation Management

Roof jobs and stages

Each roof runs as a job with stages, crew, material and schedule, from preparation through to final inspection and handover.

Work Order Management
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements