Roof jobs and stages from tear-off to inspection

Roof jobs and stages runs each roof as a single job with its own stages, crew, scaffold, material and schedule. Work moves from tear-off and battening through underlay and covering to the final inspection. Crew leads update progress from a phone. Office staff and the owner read the same record.

What a roof job record holds

A job opens when a client accepts a quotation. From that point on, the roof has one record that gathers the stages, the people and the dates. Nothing about the roof lives only on a whiteboard. Nothing rests on someone’s memory.

Stages in the order worked

Each roof carries its own stages, such as tear-off, battening, underlay, covering, flashing and final inspection. Every stage has a status. Anyone can see at once whether a roof is stripped, felted or still waiting.

Crew and scaffold against the roof

Crews assigned to the roof and the scaffold hire dates are held on the job, side by side. A late scaffold shows up before the crew arrives at the address. Nobody stands in the road waiting.

Material tied to the job

Slates or tiles, battens and underlay are listed against the roof, so anyone can read what was ordered for it. Deliveries and shortfalls link back to the same job. Stock issued to site appears there as well.

Daily area and photographs

Each day, crew leads record area stripped and relaid, with photographs and any day lost to rain. These entries build the progress picture. Stage bills later draw on the measured area kept here, so entries matter.

A roof job through its working days

A roof job runs over days that weather can rearrange. The moments below follow people at work on one roof, from the first dry morning to the final look at the ridge. Each uses the job record in its own way. Weather decides the order.

The first dry morning

A crew lead opens the roof booked for the day and sees the scaffold is up. The felt and battens have arrived. The lead marks tear-off as started, and the office watches the stage change on its own screen.

Rain stops the covering stage

Rain closes a roof halfway through laying slate. Its lead logs the lost day and the area completed. Staff move the crew to another roof. Later bookings and scaffold dates are adjusted from the same screen.

Checking roofs by stage and crew

Reading the list of roofs by stage and crew, office staff spot one roof stuck at battening. The job shows what is missing, whether crew, material or scaffold. One question to the right person clears it.

The final inspection before handover

After the covering and flashings are done, the roof is walked and the final inspection is recorded against the job. Photographs are added. Once recorded, the roof can go forward to its last bill and handover.

What each person sees on a roof job

A roof job has several readers, and each needs a different part of it. The record is shared. The view is cut to the role, which keeps the crew lead’s phone simple and the owner’s page broad.

Crew leads open their own roofs

A crew lead sees only the roofs booked for the day or week. The screen shows the stage, the scaffold and the material that has arrived. Entries for area, hours and photographs are made from the phone on site. It is quick.

Office staff book and amend

The desk books crews and scaffold against each roof, places merchant orders and move plans when weather intervenes. They see every roof in progress at once. When a stage is done, they raise its bill.

Owners read roofs in progress

An owner sees roofs in progress, those waiting on material and those stalled by rain. Tile and timber cost can be read against billing for each job. Site staff are not asked for anything extra.

Yard staff read the load list

Yard and stores staff read the material list for each roof so they know what to load. Issues to site are recorded against the job. What comes back from site is received against it as well.

Decisions to settle before jobs go live

Job stages are only useful if they match how your crews really work. Spend time on this at the first workshop, with a crew lead in the room. Real roofs make the discussion concrete. Bring a recent job.

Who may change a stage for Roof jobs and stages

Some firms let the crew lead do it from the roof, while the office confirms. Others keep it with the office alone. Whichever is chosen is set as a rule.

What each stage is called

Lay out your stages as your contracts read, from strip and batten to cover, flash and inspect. Different roof types can carry different stages. A flat membrane roof will not follow slate stages at all.

How open roofs come across

Roofs still in hand are brought in from your job register, with their stage, crew and dates. Staff compare the figures with the register before crews rely on them. Closed jobs can stay behind. That keeps the list short.

Which view matters first for Roof jobs and stages

Start with roofs by stage and crew, with days lost to rain. This shows where a crew sits idle and where a roof is stuck. Cost and billing detail come after. Read them once jobs are flowing.

How roof jobs connect to other features

The roof job sits at the centre of the product. It takes from the quotation and gives to nearly every later record. When a client accepts, the job opens. When the final inspection is recorded, the job hands over to billing and to the warranty file.

  • Opens from an accepted quotation in Quotations and rate lists
  • Draws orders from Material orders and deliveries
  • Takes crew days from Crew scheduling and attendance
  • Raises extra work through Variations and approvals
  • Hands measured stages to Stage bills and invoices

Where roof jobs and stages stop

This feature tracks the work and who is doing it. It does not design a roof or certify the work. Structural advice stays with a qualified person. Any approval a building authority demands stays with the owner and the client. A firm with only a few small repairs a month can follow them in a diary. Several crews and roofs at once make a shared job record simpler.

FAQ

Frequently asked questions

Can each roof have stages that differ by covering?

Stages are laid out as your contracts read, so a slate roof can run strip, batten, felt and cover. A flat roof follows its own steps. Each roof then shows its own list, in the order worked.

Does the job show where scaffold hire stands?

Scaffold dates sit on the job beside the crew plan. Staff can see when scaffold is due and whether a crew is booked against it. Crews never arrive before the scaffold does. Plans are checked.

What happens to a roof job when rain stops work?

The crew lead records the lost day. Back at the desk, staff move the plan, and later bookings and scaffold dates are adjusted from the same record. Days lost to rain are kept for later reading.

Can a crew lead update a roof job from the ladder?

On a phone, leads record area stripped and relaid, hours and photographs from the roof. The system runs online, so entries wait on the phone until a signal returns. Staff read them afterwards, once they sync.

Is the final inspection recorded on the same job?

The final inspection is a stage on the job, with photographs and notes. Once it is recorded, the roof goes forward to its last invoice and to handover. Covering and warranty terms are filed there.

Where it fits

How this feature fits the system.

Roofing Contractor Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

Enquiries and inspections

Each enquiry is logged with its source and address, the inspection is booked, and measurements and photographs stay on the client record.

Lead Management

Quotations and rate lists

Quotations are priced item by item from the firm’s covering, material and labour rates, and every revision is kept beside the open quotes.

Estimate/Quotation Management

Roof jobs and stages

Each roof runs as a job with stages, crew, material and schedule, from preparation through to final inspection and handover.

Work Order Management
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements