Skip to main content
GullySystem

Fence quotations priced by run and gate

A fencing quotation is built run by run. Each stretch is priced by the metre from the firm’s rate for its fence type. Gates, hinge sets, latches and the removal of old palings or wire are added on top. Every revision is kept beside the first. Estimators write it and the owner reads it.

What a run-and-gate quotation records

The quotation lists the fence in the order it will be built. Each line is one run or one opening. Each line carries its own measurements and rate, so pricing follows the boundary and not one lump sum for the whole property.

Rate per metre by fence type

Each run takes the rate keyed in for its fence type and height. A close-board run and a welded mesh run are priced differently from the same list, even on one property. The rate list is the firm’s own.

Gates, hinge sets and latches

Every gate is a line of its own, with width, hinge set and latch priced from the rate list. Double gates and pedestrian gates get separate lines. An extra hinge set goes on as its own line.

Removal of old palings or wire

Taking out the old fence is priced in. Removal of old palings, rails or wire is added to the run it replaces. The client sees the clearing as its own line, not as a surprise.

Revisions kept beside the first

A client asks for a taller panel along the road after seeing the first figure. The new version is saved beside the first, so both prices stay on file. Nobody has to remember what was quoted first.

Pricing a fence through the working week

Quotations are written between visits and answered, or ignored, over the days that follow. The record follows each one from the first draft to the client’s reply. Each person leaves a mark. Several people touch it before it becomes a job.

Back from a hillside visit

An estimator returns from a hillside visit and opens the file. Each run is already there with its length and height. The rate list supplies a price for every run and gate. No length is typed twice.

A school site with mixed needs

A school site needs chain-link round the field, a pedestrian gate by the road and old wire taken down. Each need becomes its own priced line. The client gets one quotation with the total at the foot, and the lines above it explain the sum.

Chasing an unanswered quotation

The open list shows which quotations are waiting. The office rings the client or sends a reminder by email, SMS or a messaging app. A reply of yes, no or later is entered on the record.

Acceptance turns into a job

When the client says yes on the phone, the quotation is marked accepted by the office. Its runs, gates and rates carry into the fence job. The final figure is the one the client agreed. Nobody keys the price again.

Who prepares and who reads a quotation

A quotation passes through the estimator’s hands, the office, the owner and sometimes the yard before a pallet is ordered. Each sees the same lines but acts on a different part. The lines stay the same.

For the estimator

Estimators build the quotation line by line and set each rate from the list. They follow it until the client accepts or drops it. The visit photographs stay open beside the figures. Revisions are made here too.

For the office

The office sends the quotation to the client and notes the reply against the right version. Reminders about unanswered ones go by message. When a client quotes the first price back, the first version is to hand.

For the owner

The owner opens the list of quotations still open, accepted and lost, and sees which await an answer. Rates are the owner’s decision. A change to the rate list goes to GullySystem staff on request.

For yard staff

Yard staff do not price anything. They read the accepted quotation to see the posts, panels and rails the truck must carry. A question on a quantity goes back to the estimator before loading begins.

Quotation set-up decisions for a fencing firm

Pricing is where a fencing firm’s habits show. Four decisions fix how the quotation behaves from the first day, and each one belongs to the owner and the lead estimator together. Settle them before the first quotation goes out.

Who may change a rate or line

Decide whether estimators may overwrite a rate on one quotation, or only the owner may, and note the reason. A discount on one client’s run should leave the rate list untouched. Agree it before the first quotation goes out.

What is left out of a price

Decide which items are priced as lines and which stay as notes, such as access across a client’s lawn or a locator’s visit. Anything left out should be said plainly. Plain notes spare an argument at the final invoice.

How old quotations come across for quotations by run and gate

Decide whether open quotations from a spreadsheet are keyed in or left on paper. Running jobs come across with the client list. Quotations priced under old rates are best re-priced from the new list before they are sent on.

Which list to check first for quotations by run and gate

Choose the first list to check each morning. Quotations still open come first, since each one is a client waiting for a price or a reply. The accepted and lost lists follow, once the open ones have been worked.

How quotations connect to the next steps

Between the visit and the work sits the quotation. It takes its lengths from the site visit and its rates from the firm’s list. It hands its totals on to the fence job, the material order and the deposit invoice. Each handover is listed below.

  • Measured runs arrive from the site visit file
  • Accepted lines become the fence job and crew sheet
  • Post and panel counts guide the supplier pallet order
  • Quoted total sets the deposit and final invoice
  • Unanswered quotations prompt a reminder message to the client

What a quotation does not settle

A quotation records a price and the measurements behind it. It does not decide whether a rate is fair, whether the client can pay, or what tax applies to the sale. Pricing is still a judgement. Tax treatment, contract wording and any legal advice stay with the owner and the accountant or adviser. A firm quoting a few fences a month may manage with a sheet of paper.

FAQ

Frequently asked questions

How is removal of old palings or wire priced?

Removal of old palings, rails or wire is added as a line beside the run it clears. It shows apart from the new fence. A hard-to-reach stretch can carry a note explaining the extra labour to the client.

Who decides when a quotation is marked lost?

Once the client declines, or reminders go unanswered and the owner agrees to close it, the office marks it lost. The record stays. A later enquiry from that client finds the old figures and the revisions.

Does the quotation show our tax and currency?

It carries your own currency and the local tax treatment set up for your firm, and language follows the client. Choosing the right tax treatment is a matter for your accountant. Those settings are agreed at set-up.

Can a client accept one run and drop another?

Revise the quotation by dropping the run the client declined, and the total follows from the lines that remain. The earlier version stays beside the new one. The accepted version then becomes the fence job the crews are scheduled from.

Which fittings need their own line?

Anything the rate list prices on its own: a gate, a hinge set, a latch or a run of kickboard. Small fixings can stay inside the run rate. Ask your estimators where the firm draws that line.

Where it fits

How this feature fits the system.

Fencing Contractor Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

Enquiries and site visits

Each fence enquiry is logged with source and address, the site visit is booked, and run measurements and boundary photographs stay on the client record.

Lead Management

Quotations by run and gate

Quotations are priced by the metre from the firm’s rates for each fence type, gate and fitting, and every revision stays in the open list.

Estimate/Quotation Management

Fence jobs and crew schedule

A job sheet gathers the runs, gates, material and crew for one fence, with locator marks and boundary notes the leader reads before digging.

Work Order Management
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements