Skip to main content
GullySystem

Gutter material and van stock, counted per job

Sections, brackets, corners, hoppers, stopends and guards are counted by van and by yard. Stock is received, issued to a job and returned, and a reorder level raises an alert when a size runs low. Rivets and mastic count as stock too. Nobody finds a short van on the roof.

What the gutter stock record counts

Each item the firm fits has a name, a count and a place. The place is a yard or a van. A bracket in the yard and a bracket in a van are two lines that add up to one total.

Lengths, corners and outlets

Gutter sections are held by profile, material and length. Corners, stopends and hoppers are counted by type, with internal and external corners kept apart. Each size is a line of its own. A shortage can be read from the list.

Brackets, guards and downpipes

Brackets, downpipe lengths and swan necks each have a line for every size and finish. Guards are held by length and type. A short count shows in the list before anyone loads a van or leaves the yard.

Rivets, mastic and small fittings

Rivets, screws, mastic and sealant tubes are counted like any bracket. A joint cannot close without rivets. Each small item has its own reorder level, so the office sees it fall before the van runs out on a job.

Reorder levels for each size

A level is set for each size, and an alert shows below it. Its figure is the owner’s choice. The alert names the size, the place and the count, and the next supplier order starts from that list.

Stock through a gutter firm’s working day

Stock moves four ways. It arrives, it goes into a van, it is used on a job and it comes back. Each move is one entry. The person who handled the bundle makes it. Four moments show an ordinary day in the yard.

A delivery reaches the yard

A lorry unloads bundles of sections and boxes of fittings. The yard hand checks them in. The yard count rises. Shortages and damaged bundles are settled on the supplier order, not here, so this list shows only what arrived.

Loading a van for the morning

The evening before an install, the lead installer loads the van from the job’s material list. Sections, brackets and hoppers move from the yard line to the van line. Only the place changes. Totals stay the same.

Using stock on a roof

As a run is fitted, the lengths and fittings used are recorded against the job. The van count falls. The job’s material cost rises with each entry, and the margin for that house moves with it.

Returning what was not used

The job’s material cost falls to what was really used. Leftovers are recorded the same evening.

Who reads the gutter stock figures

Stock figures matter to four people for four reasons. The owner reads cost, the office reads orders and the crew reads the van. All of them see the same stock. The cut differs.

What owners watch for material and van stock

Owners see material cost against billing and stock issued to every job. A job that used more material than quoted shows in its margin. Each house carries its own margin. Compare one house with the next, and with the quotation.

What estimators check

Estimators check stock before promising a date. A quotation for a long run of half-round needs the lengths to be on the shelf. A low size is flagged to the office, with its count and its place.

What the office orders

The office reads the reorder alerts, places supplier orders and records returns. A stock take of the yard or a van corrects the figures. Shortages are listed. Nobody has to guess a count, and nobody drives to the yard for a missing size.

What crews carry and record

Crews see what the van should hold for the day’s job and record what they use. A shortage is reported from the phone before the next run starts. Returns use the same screen. The van is counted back in.

Stock decisions to make before counting begins

A stock list is only as good as its first count of each van and shelf. Before set-up, the owner and the person who loads the vans settle four points. Walk the yard first.

Who may adjust a count for material and van stock

Decide who can correct a count after a stock take, and who can only record use. An adjustment keeps its reason. It is saved with its date and the name of the person, so a loss or a mistake is not hidden.

What is left out of stock for material and van stock

Choose what is not counted. Ladders and tower sets may be tracked elsewhere, and a special order may go straight to a job without passing through the shelves. Say so in the set-up notes. Write the rule down.

How the opening count comes across

The opening count is keyed in from a walk of the yard and each van. A clerk counts one van twice against the paper list, to prove the method before the rest are keyed in. Dead sizes can stay out.

Which report matters first for material and van stock

Begin with the list of stock issued to every job. It shows where the material goes, and it gives the owner a basis for setting each reorder level from real use. Receipts and returns follow later.

How stock connects to jobs and suppliers

Stock sits between buying and fitting. It takes receipts from supplier orders, it gives material to installation jobs, and it hands the cost of that material to the job’s margin. A van and a yard are only places on the same list, never two separate books.

  • Supplier orders add received sections and fittings to the yard
  • Quotations list the lengths each job will need
  • Installation jobs take stock issued from the van
  • Reorder alerts start the next supplier order
  • Material cost per job feeds the margin figure

Where gutter stock tracking stops

Stock tracking counts what is entered. It does not read a barcode, weigh a bundle or notice a missing bracket on its own. It does not value the shelves for the accounts. Valuation, write-offs and the tax treatment of stock belong to the owner and the accountant. A firm with one van and a small shed may find a tally sheet enough.

FAQ

Frequently asked questions

Can a reorder level be set for each size?

Every size has its own level, so a PVC length and a half-round hopper are watched apart. When a count falls below the level, an alert lists the size and where it sits. Levels are set by the owner.

What happens when stock is returned from a van?

The returned items go back onto the yard line, or stay on the van, and the job’s material cost falls to what was used. The entry names the job and the person. Margins then use the lower figure.

Does it show which job used which stock?

Each issue names the job, so stock issued to every job can be read house by house, with the date and the van. Brackets, corners and mastic appear on the job that took them. The owner reads it beside billing.

How are stock takes handled?

Count the yard or a van and key in the figures. The list shows the difference from the book. The adjustment is saved with a reason and a name, and shortages are listed so the gap is visible.

Can small fittings like rivets be tracked?

Rivets, screws, mastic and sealant tubes are items like any other, with their own counts and levels. A box or a tube can serve as the unit. Decide it once and use it every time.

Where it fits

How this feature fits the system.

Gutter Contractor Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

Enquiries and property visits

Every gutter enquiry is logged with its source and address, the visit is booked, and run measurements and photographs stay with the property.

Lead Management

Quotations by run and downpipe

Quotations are priced by length from the firm’s rates for each gutter type, downpipe and guard, and every revision stays in the open list.

Estimate/Quotation Management

Installation jobs and crews

An install is one job that gathers its runs, material, crew and dates, with safety notes for working at height attached.

Work Order Management
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements